Chinese Journal of Management Science ›› 2022, Vol. 30 ›› Issue (10): 25-34.doi: 10.16381/j.cnki.issn1003-207x.2020.1207
• Articles • Previous Articles Next Articles
SUO Wei-lan1, ZHANG Jin2
Received:
2020-06-26
Revised:
2020-08-17
Online:
2022-10-20
Published:
2022-10-12
Contact:
索玮岚
E-mail:suoweilan@casisd.cn
CLC Number:
SUO Wei-lan, ZHANG Jin. Study on Identification of Financing Risks for Transport Infrastructure Construction under a Pluralistic Integrated Mode[J]. Chinese Journal of Management Science, 2022, 30(10): 25-34.
[1] Coppola P, Dell’Olio L, Portilla A I. Rediscovery the social role of transport infrastructures[J]. Transportation Research Part A: Policy and Practice, 2019, 125: 169-170. [2] Rokicki B, Stepniak M. Major transport infrastructure investment and regional economic development-An accessibility-based approach[J]. Journal of Transport Geography, 2018, 72: 36-49. [3] Li Jianping, Zhang Jin, Suo Weilan. Risk assessment in cross-border transport infrastructure projects: A fuzzy hybrid method considering dual interdependent effects[J]. Information Sciences, 2019, 488: 140-157. [4] Kim H T, Ahn S H, Ulfarsson G F. Transportation infrastructure investment and the location of new manufacturing around South Korea's West Coast Expressway[J]. Transport Policy, 2018, 66: 146-154. [5] Wang Chao, Lim Mingkim, Zhang Xinyi, et al. Railway and road infrastructure in the Belt and Road Initiative countries: Estimating the impact of transport infrastructure on economic growth[J]. Transportation Research Part A: Policy and Practice, 2020, 134: 288-307. [6] 赵光辉, 李长健. 交通强国战略视野下交通治理问题探析[J]. 管理世界, 2018, 34(2): 182-183.Zhao Guanghui, Li Changjian. Analysis of traffic governance issues from the strategic perspective of powering the country in traffic[J]. Management World, 2018, 34(2): 182-183. [7] 张劲, 索玮岚. 考虑风险关联性和随机性的交通基础设施建设风险评估方法研究[J]. 管理评论, 2020, 32(6): 45-55.Zhang Jin, Suo Weilan. Research on risk assessment method for transport infrastructure construction considering the interdependency and stochasticity of risks[J]. Management Review, 2020, 32(6): 45-55. [8] Kyriacou A P, Muinelo-Gallo L, Roca-Sagales O. The efficiency of transport infrastructure investment and the role of government quality: An empirical analysis[J]. Transport Policy, 2019, 74: 93-102. [9] 燕雪, 徐媛, 盛昭瀚, 等. 不同合作状态下交通特许经营项目特许期决策模型[J]. 中国管理科学, 2017, 25(11): 103-110.Yan Xue, Xu Yuan, Sheng Zhaohan, et al. Concession period decision model of the traffic franchise project under the different forms of cooperation[J]. Chinese Journal of Management Science, 2017, 25(11): 103-110. [10] Sun Zhentian, Li Xuhong, Xie Yuanchang. A comparison of innovative financing and general fiscal investment strategies for second-class highways: Perspectives for building a sustainable financing strategy[J]. Transport Policy, 2014, 35: 193-201. [11] Li Shuai, Abraham D, Cai Hubo. Infrastructure financing with project bond and credit default swap under public-private partnerships[J]. International Journal of Project Management, 2017, 35: 406-419. [12] Schaufelberger J E, Wipadapisut I. Alternate financing strategies for build-operate-transfer projects[J]. Journal of Construction Engineering and Management, 2003, 129(2): 205-213. [13] Kumari A, Sharma A K. Infrastructure financing and development: A bibliometric review[J]. International Journal of Critical Infrastructure Protection, 2017, 16: 49-65. [14] 吴建忠, 詹圣泽, 陈继. PPP融资与运营模式创新研究——以荔榕高速“PPP+EPC+运营期政府补贴”模式为例[J]. 工业技术经济, 2018, 36(1): 49-56.Wu Jianzhong, Zhan Shengze, Chen Ji. Research on PPP financing and operation mode innovation-A case study of the government subsidy mode of PPP+EPC+Operation period in Lai Yung expressway[J]. Journal of Industrial Technological Economics, 2018, 36(1): 49-56. [15] Lu Zheng, Pea-Mora F, Wang Shouqing, et al. Assessment framework for financing public-private partnership infrastructure projects through asset-backed securitization[J]. Journal of Management in Engineering, 2019, 35(6): 04019027. [16] Macário R, Ribeiro J, Costa J D. Understanding pitfalls in the application of PPPs in transport infrastructure in Portugal[J]. Transport Policy, 2015, 41: 90-99. [17] Aladagˇ H, I瘙塂ik Z. The effect of stakeholder-associated risks in mega-engineering projects: A case study of a PPP airport project[J]. IEEE Transactions on Engineering Management, 2020, 67(1): 174-186. [18] Ahmadabadi A K, Heravi G. Risk assessment framework of PPP-megaprojects focusing on risk interaction and project success[J]. Transportation Research Part A: Policy and Practice, 2019, 134: 169-188. [19] 张海亮, 卢曼, 吴冲锋. 不同“融资铜”模式的风险识别与警示[J]. 中国管理科学, 2015, 23(8): 10-17.Zhang Hailiang, Lu Man, Wu Chongfeng. Risk identification and warning for different copper “financing” patterns[J]. Chinese Journal of Management Science, 2015, 23(8): 10-17. [20] Zhang Sherong, Sun Bo, Yan Lei, et al. Risk identification on hydropower project using the IAHP and extension of TOPSIS methods under interval-valued fuzzy environment[J]. Natural Hazards, 2013, 65(1): 359-373. [21] Han Qingye, Zhu Yuming, Ke G Y, et al. Public private partnership in brownfield remediation projects in China: Identification and structure analysis of risks[J]. Land Use Policy, 2019, 84: 87-104. [22] 汪涛, 高尚德, 李桂君. 基于元网络分析的重大基础设施建设项目风险评估框架与实证[J]. 中国管理科学, 2019, 27(7): 208-216.Wang Tao, Gao Shangde, Li Guijun. Meta-network analysis based risk evaluation framework and empirical study of major infrastructure construction projects[J]. Chinese Journal of Management Science, 2019, 27(7): 208-216. [23] Gonzalez-Ruiz J D, Pea A, Duque E A, et al. Stochastic logistic fuzzy maps for the construction of integrated multirates scenarios in the financing of infrastructure projects[J]. Applied Soft Computing, 2019, 85: 105818. [24] Siraj N B, Fayek A R. Risk identification and common risks in construction: Literature review and content analysis[J]. Journal of Construction Engineering and Management, 2019, 145(9): 03119004. [25] 索玮岚, 陈锐. 考虑复杂关联情境的城市典型生命线运行风险因素识别方法研究[J]. 中国管理科学, 2014, 22(8): 130-140.Suo Weilan, Chen Rui. Study on identification method for risk factors of urban typical lifeline operation considering a complex interdependent context[J]. Chinese Journal of Management Science, 2014, 22(8): 130-140. [26] Gabus A, Fontela E. World problems, an invitation to further thought within the framework of DEMATEL[R]. Switzerland Geneva: Battelle Geneva Research Centre, 1972. [27] Herrera F, Herrera-Viedma E, Verdegay J L. A sequential selection process in group decision making with linguistic assessment[J]. Information Sciences, 1995, 85(4): 223-239. [28] Herrera F, Martínez L. A 2-tuple fuzzy linguistic representation model for computing with words[J]. IEEE Transactions on Fuzzy Systems, 2000, 8(6): 746-752. [29] Ayrim Y, Atalay K D, Can G F. A new stochastic MCDM approach based on COPRAS[J]. International Journal of Information Technology & Decision Making, 2018, 17(3): 857-882. [30] Papoulis A, Pillai S U. Probability, random variables, and stochastic processes[M]. New York: McGraw-Hill, 2002. |
[1] | ZHOU De-qun, DING Hao, ZHOU Peng, WANG Qun-wei. Renewable Energy Technology Diffusion Model Based on Process Division [J]. Chinese Journal of Management Science, 2022, 30(2): 217-225. |
[2] | ZHAO Lin-hai, CHEN Ming-zhi. Systemic Risk Spillovers and Systemic Risk Contributions of Financial Institutions in China: A Perspective of Dual Time-varying Dependence of Rolling Window Dynamic Copula Model [J]. Chinese Journal of Management Science, 2021, 29(7): 71-83. |
[3] | LIU Kai-di, YANG Duo-gui, WANG Guang-hui, ZHOU Zhi-tian. Policy Modeling and Simulation on Ecological Civilization Construction in China Based on System Dynamics [J]. Chinese Journal of Management Science, 2020, 28(8): 209-220. |
[4] | YAN Guan, LIU Zhi-dong. Systemic Risk in China's Interbank Liability Networks Based on the Bayesian Methodology [J]. Chinese Journal of Management Science, 2020, 28(4): 14-26. |
[5] | MIAO Xiu-mei, CHEN Ye-tian, MI Chuan-min. Study on Consumer Satisfaction of Tangshan Hot Springs based on ISM and Online Reviews [J]. Chinese Journal of Management Science, 2019, 27(7): 186-194. |
[6] | ZENG Shou-zhen, MU Zhi-min. A Method Based on Hybrid Weighted Distance for Pythagorean Fuzzy TOPSIS Multiple-attribute Decision Making [J]. Chinese Journal of Management Science, 2019, 27(3): 198-205. |
[7] | FANG Zhi-geng, WANG Huan, DONG Wen-jie, CAO Ying-sai. Framework Design of Civil Aircraft Fault Intelligent Diagnosis Network based on Reliability gene Pool [J]. Chinese Journal of Management Science, 2018, 26(11): 124-131. |
[8] | GU Bai-he, TAN Xian-chun, TAN Xian-bo, XU Bao-guang, LI Hui. Study on the Production Unit's Carbon Emission Accounting Model in the Manufacturing System [J]. Chinese Journal of Management Science, 2018, 26(10): 123-131. |
[9] | HAO Jing-jing, ZHU Jian-jun, LIU Si-feng. A Method for Multi-stage Stochastic Multi-criteria Decision Making Concerning Prospect Theory [J]. Chinese Journal of Management Science, 2015, 23(1): 73-81. |
[10] | ZHAO Zhong-xiu, PEI Jian-suo, YAN Yun-feng. Trade Growth, International Fragmentation, and China's CO2 Growth 1992-2007: The Product-cause Perspective [J]. Chinese Journal of Management Science, 2014, 22(12): 11-17. |
[11] | SUO Wei-lan, Chen Rui. Study on Identification Method for Risk Factors of Urban Typical Lifeline Operation Considering a Complex Interdependent Context [J]. Chinese Journal of Management Science, 2014, 22(8): 130-140. |
[12] | DU Juan, HUO Jia-zhen. DEA-based Evaluation on City Innovation in China [J]. Chinese Journal of Management Science, 2014, 22(6): 85-93. |
[13] | LIANG Yan-hua, GUO Peng, ZHU Yu-ming. A Sample-Set based Interval Gray Target Classification and Decision-Making Model and Its Applications [J]. Chinese Journal of Management Science, 2014, 22(5): 98-103. |
[14] | ZHU Jian-jun, LIU Si-feng, TIAN Fei. Information Translation and Aggregation Approach on Three-Point Linguistic and Complementary Preference in Group Decision Making [J]. Chinese Journal of Management Science, 2011, 19(3): 141-147. |
[15] | ZHU Ning-ning, ZHU Jian-jun, DING Ye, LIU Si-feng. Research on Alternatives Fast Aggregated Model Based on Linguistic Evaluation Information [J]. Chinese Journal of Management Science, 2009, 17(4): 121-125. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
|