[1] |
Yidan He,Zhengwen He,Nengmin Wang,Zhiqiang Ma.
Resource-constrained Max-NPV Multi-project Scheduling Optimization under Sharing Economy Environment
[J]. Chinese Journal of Management Science, 2024, 32(9): 260-270.
|
[2] |
Tieke Li,Yixuan Su,Wenxin Zhang,Bailin Wang.
Interval Multi-objective Optimal Scheduling for Steelmaking-continuous Casting with Processing Time Uncertainty
[J]. Chinese Journal of Management Science, 2024, 32(8): 95-106.
|
[3] |
Hao Xiong,Huili Yan.
The Optimization of Online Dynamic Inventory Allocation for Order Fulfillment in Two Echelon Warehouse Network of B2C e-Commerce
[J]. Chinese Journal of Management Science, 2024, 32(7): 248-257.
|
[4] |
Zihao Chu,Zhe Xu,Dongning Liu.
Model and Algorithm on Stochastic Scheduling Problem with Activity Overlapping
[J]. Chinese Journal of Management Science, 2024, 32(7): 84-94.
|
[5] |
Heping Wang,Dengyu Zhao,Mengkai Chen,Yan Li.
Research on Assignment Optimization of PC Components Mixed-flow Production Based on MO-CGJaya/D Algorithm
[J]. Chinese Journal of Management Science, 2024, 32(7): 95-105.
|
[6] |
Zhihong Huang,Weilai Huang,Fang Guo.
Collaborative Optimization of Charging Network and Charging Strategy with Practical Battery Wear Model
[J]. Chinese Journal of Management Science, 2024, 32(6): 68-78.
|
[7] |
Ling Zhang,Pengfei Gao,Lin Zhang.
Research on Emergency Evacuation and Material Allocation Based on Deprivation Cost
[J]. Chinese Journal of Management Science, 2024, 32(5): 187-195.
|
[8] |
Houming Fan,Xue Bai,Panjun Tian,Yueguang Zhang.
Door Assignment and Time-dependent Vehicle Routing Problem with Multiple Cross-Docks
[J]. Chinese Journal of Management Science, 2024, 32(4): 108-119.
|
[9] |
Ligang Cui,Xiaolin Liu,Jie Deng,Dongyang Xu.
Stochastic Multi-item Joint Replenishment Problem Considering Trade Creditunder China-Europe Trade
[J]. Chinese Journal of Management Science, 2024, 32(4): 76-88.
|
[10] |
Fuyu Wang,Haoxuan Xie,Zhonggao Lin,Jun Wang.
Multi-objective Optimization Model and Adaptive Quantum Ant Colony Algorithm for Emergency Evacuation of High-speed Railway Stations under Emergencies
[J]. Chinese Journal of Management Science, 2024, 32(3): 188-197.
|
[11] |
Zujun Ma, Yiran Wang.
Optimal Location and Capacity of Pre-cooling Facilities Considering the First-Mile Loss of Fresh Agri-products
[J]. Chinese Journal of Management Science, 2024, 32(2): 315-323.
|
[12] |
Hui Li,Xi Wang,Zhiya Zuo.
Multi-objective Integrated Optimization of Flexible Resource Allocation and Scheduling in the Aerospace Production Workshop
[J]. Chinese Journal of Management Science, 2024, 32(10): 146-155.
|
[13] |
Lianyi Liu,Sifeng Liu,Lifeng Wu.
New Energy Vehicle Sales Forecast Based on Siscrete Time Grey Power Model
[J]. Chinese Journal of Management Science, 2024, 32(1): 106-114.
|
[14] |
Xinyue Zhang,Peng Jin,Xiaoxuan Hu,Moning Zhu.
Research on the Time-dependent Multi-depot Open Vehicle Routing Problem with Time Windows
[J]. Chinese Journal of Management Science, 2024, 32(1): 146-157.
|
[15] |
Guohua Wu.
Based on Hub-Spoke Network a Practice Heuristic Algorithm Applied to Airline Fleet Assignment
[J]. Chinese Journal of Management Science, 2024, 32(1): 158-167.
|