Chinese Journal of Management Science ›› 2025, Vol. 33 ›› Issue (8): 218-229.doi: 10.16381/j.cnki.issn1003-207x.2022.1629
Xiao Cui1,2,4, Zhengwen He1,2,3(), Nengmin Wang1,2,3
Received:
2022-07-25
Revised:
2022-09-22
Online:
2025-08-25
Published:
2025-09-10
Contact:
Zhengwen He
E-mail:zhengwenhe@mail.xijtu.edu.cn
CLC Number:
Xiao Cui, Zhengwen He, Nengmin Wang. Optimization of Reactive Project Scheduling with Stochastic Resource Requirements Considering Information Handling Input[J]. Chinese Journal of Management Science, 2025, 33(8): 218-229.
"
强相关文献 | 不确定性因素 | 不确定性因素处理方式 | 降低不确定性因素的变化性 | 分析目标 | 解决方法 | |||||
---|---|---|---|---|---|---|---|---|---|---|
工期 | 资源 需求 | 资源可用量 | 随机 变量 | 模糊数 | 时间 | 成本 | 其他 | |||
Van de Vonder等[ | √ | - | - | √ | - | - | - | √ | - | 优先列表/抽样/加权提前-延迟法等 |
Davari和Demeulemesster[ | √ | - | - | √ | - | - | - | √ | - | 动态规划 |
Chakrabortty等[ | - | - | √ | √ | - | - | √ | - | - | 基于事件反应法 |
彭武良和林家利[ | - | - | √ | √ | - | - | - | - | √ | 两阶段法 |
Zhang等[ | - | √ | - | - | √ | - | - | - | √ | 仿真分析 |
何立华[ | - | √ | - | √ | - | √ | √ | - | 遗传算法 | |
卢辉等[ | - | √ | - | √ | - | - | - | √ | - | 代理模型优化法 |
Shariatmadari和Nahavandi[ | - | √ | - | √ | - | - | - | - | √ | 鲁棒性提升算法 |
Madadi和Iranmanesh[ | √ | - | - | √ | - | √ | √ | - | 仿真分析 | |
Martens和Vanhoucke[ | √ | - | - | √ | - | √ | √ | √ | - | 仿真分析 |
本文 | - | √ | - | √ | - | √ | - | √ | - | 变邻域算法 |
"
编号 | 类别 | 项目活动名称 | di | wi | μi1 | σ i1 | μi2 | σ i1 |
---|---|---|---|---|---|---|---|---|
0 | 开始 | 虚开始活动 | 0 | 0 | 0 | 0 | 0 | 0 |
1 | 控制功能 | 数据库设计及评审 | 6 | 6 | 8 | 2.9 | 5 | 4.7 |
2 | 控制页面UI和回执文件控制逻辑编码 | 12 | 4 | 5 | 4.1 | 2 | 1.5 | |
3 | 创建及评审控制功能用例 | 5 | 5 | 2 | 1.9 | 3 | 2.8 | |
4 | 实施及创建控制功能自测和单元测试 | 4 | 2 | 6 | 2.7 | 4 | 1.5 | |
5 | 评审控制功能代码 | 2 | 5 | 4 | 1.7 | 2 | 1.4 | |
6 | 控制功能测试 | 5 | 3 | 2 | 1.5 | 2 | 1.2 | |
7 | 生成文件功能 | 生成文件功能编码 | 12 | 8 | 3 | 4.2 | 2 | 1.8 |
8 | 创建及评审生成文件功能用例 | 3 | 3 | 2 | 3.1 | 3 | 2.5 | |
9 | 实施及创建生成文件功能自测和单元测试 | 6 | 2 | 7 | 1.6 | 3 | 2.9 | |
10 | 评审生成文件功能代码 | 1 | 5 | 4 | 2.4 | 2 | 1.9 | |
11 | 生成文件功能测试 | 4 | 4 | 3 | 2.8 | 5 | 3.2 | |
12 | 投递选择功能 | 投递选择功能编码 | 28 | 9 | 8 | 4.7 | 4 | 3.2 |
13 | 创建及评审投递选择功能用例 | 6 | 3 | 3 | 1.4 | 5 | 3.7 | |
14 | 实施及创建投递选择功能自测和单元测试 | 15 | 4 | 6 | 3.2 | 3 | 1.9 | |
15 | 评审投递选择功能代码 | 3 | 2 | 4 | 2.4 | 2 | 1.4 | |
16 | 投递选择功能测试 | 8 | 5 | 2 | 1.5 | 4 | 2.7 | |
17 | 邮递显示功能 | 邮递显示功能编码 | 6 | 9 | 4 | 2.4 | 3 | 2.5 |
18 | 创建及评审邮递显示功能测试用例 | 3 | 6 | 2 | 1.8 | 5 | 3.8 | |
19 | 实施及创建邮递显示功能自测和单元测试 | 7 | 2 | 6 | 2.9 | 2 | 1.6 | |
20 | 评审邮递显示功能代码 | 2 | 2 | 3 | 2.7 | 3 | 2.6 | |
21 | 邮递显示功能测试 | 6 | 3 | 2 | 2.1 | 4 | 2.7 | |
22 | 收据及查询功能 | 收据及查询功能编码 | 12 | 9 | 3 | 3.4 | 2 | 1.5 |
23 | 创建及评审收据及查询功能测试用例 | 5 | 5 | 2 | 1.5 | 5 | 2.2 | |
24 | 实施及创建收据及查询功能自测和单元测试 | 7 | 3 | 7 | 3.7 | 3 | 2.6 | |
25 | 评审收据及查询功能代码 | 2 | 2 | 4 | 2.9 | 2 | 1.1 | |
26 | 收据及查询功能测试 | 4 | 7 | 2 | 1.4 | 4 | 3.3 | |
27 | 分发管理功能 | 分发管理功能编码 | 13 | 6 | 3 | 3.5 | 2 | 1.7 |
28 | 创建及评审分发管理功能测试用例 | 6 | 5 | 2 | 2.7 | 6 | 2.3 | |
29 | 实施及创建分发管理功能自测和单元测试 | 8 | 3 | 4 | 3.4 | 3 | 2.9 | |
30 | 评审分发管理功能代码 | 2 | 4 | 6 | 2.7 | 4 | 2.9 | |
31 | 分发管理功能测试 | 7 | 4 | 2 | 1.8 | 4 | 1.9 | |
32 | 集成测试 | 软件集成测试、检测及修复缺陷任务 | 15 | 8 | 4 | 3.6 | 6 | 4.8 |
33 | 结束 | 虚结束活动 | 0 | 46 | 0 | 0 | 0 | 0 |
"
方案及降后标准差 | 元素值 | |
---|---|---|
Y* 及其降后标准差 | yi1 | {0, 0, 1, 0, 0, 0, 0, 0, 1, 0, 0, 0, 0, 0, 0, 0, 1, 1, 1, 1, 0, 0, 0, 0, 0, 0, 0, 1, 0, 0, 0, 0, 0, 0} |
yi2 | {0, 2, 1, 0, 1, 0, 0, 0, 0, 0, 0, 2, 2, 1, 0, 0, 1, 1, 1, 1, 0, 1, 1, 0, 1, 0, 0, 0, 1, 0, 0, 0, 0, 0} | |
σ'i1 (Y* ) | {0, 2.9, 3.8, 1.9, 2.7, 1.7, 1.5, 4.2, 2.9, 1.6, 2.4, 2.8, 4.7, 1.4, 3.2, 2.4, 1.3, 2.0, 1.5, 2.5, 2.7, 2.1, 3.4, 1.5, 3.7, 2.9, 1.4, 2.8, 2.7, 3.4, 2.7, 1.8, 3.6, 0} | |
σ'i2 (Y* ) | {0, 4.2, 1.3, 2.8, 1.2, 1.4, 1.2, 1.8, 2.5, 2.9, 1.9, 2.1, 2.6, 2.9, 1.9, 1.4, 2.5, 2.3, 3.3, 1.3, 2.6, 2.3, 1.2, 2.2, 2.2, 1.1, 3.3, 1.7, 2.0, 2.9, 2.9, 1.9, 4.8, 0} | |
Y 及其降后标准差 | yi1 | {0, 0, 2, 0, 0, 0, 0, 0, 1, 0, 0, 0, 2, 2, 1, 1, 1, 0, 2, 2, 0, 0, 1, 1, 0, 0, 0, 1, 2, 1, 2, 1, 1, 0} |
yi2 | {0, 2, 1, 2, 2, 2, 2, 1, 2, 2, 0, 0, 1, 2, 2, 0, 0, 0, 1, 1, 0, 2, 1, 1, 1, 2, 2, 1, 1, 1, 0, 2, 1, 0} | |
σ'i1 (Y) | {0, 2.9, 3.6, 1.9, 2.7, 1.7, 1.5, 4.2, 2.9, 1.6, 2.4, 2.8, 3.8, 1.2, 2.7, 2.0, 1.3, 2.4, 1.3, 2.1, 2.7, 2.1, 2.7, 1.4, 3.7, 2.9, 1.4, 2.8, 2.2, 2.7, 2.1, 1.4, 2.9, 0} | |
σ'i2 (Y) | {0, 4.2, 1.3, 2.2, 0.9, 0.9, 0.8, 1.5, 1.6, 2.5, 1.9, 3.2, 2.9, 2.4, 1.6, 1.4, 2.7, 2.5, 3.3, 1.3, 2.6, 2.0, 1.2, 1.9, 2.2, 0.9, 2.2, 1.6, 2.0, 2.7, 2.9, 1.2, 4.1, 0} |
"
方案 | 相关成本及相应反应性计划 | |||
---|---|---|---|---|
Y* | TC(Y*) | 303.4 | ||
EC(Y*) | 96 | |||
AC(Y*) | 120 | 207.4 | ||
401 | ||||
283 | ||||
94 | ||||
139 | ||||
Y | TC(Y) | 447.6 | ||
EC(Y) | 248 | |||
AC(Y) | 125 | 199.6 | ||
347 | ||||
299 | ||||
88 | ||||
139 |
[1] | Lamas P, Demeulemeester E. A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations[J]. Journal of Scheduling, 2016, 19(4): 409-428. |
[2] | 马志强, 徐小峰, 何正文, 等. 复杂不确定环境下活动可拆分的项目资源鲁棒性调度优化[J]. 中国管理科学, 2022, 30(3): 117-130. |
Ma Z Q, Xu X F, He Z W, et al. Robust scheduling optimization of project resources with activity splitting under complex and uncertain environments[J]. Chinese Journal of Management Science,2022,30(3): 117-130. | |
[3] | Van de Vonder S, Ballestín F, Demeulemeester E, et al. Heuristic procedures for reactive project scheduling[J]. Computers & Industrial Engineering, 2007, 52(1): 11-28. |
[4] | Davari M, Demeulemeester E. The proactive and reactive resource-constrained project scheduling problem[J]. Journal of Scheduling, 2019, 22(2): 211-237. |
[5] | 丰景春, 董灵莉.多资源约束下基于关键链的项目群工期-费用优化[J].中国管理科学,2022,30(4): 132-143. |
Feng J C, Dong L L. Construction period-cost optimization of program based on critical chain method under multi-resource constraints[J]. Chinese Journal of Management Science, 2022, 30(4): 132-143. | |
[6] | Lambrechts O, Demeulemeester E, Herroelen W. Time slack-based techniques for robust project scheduling subject to resource uncertainty[J]. Annals of Operations Research, 2011, 186(1): 443-464. |
[7] | Chakrabortty R K, Rahman H F, Haque K M A, et al. An event-based reactive scheduling approach for the Resource Constrained Project Scheduling Problem with unreliable resources[J]. Computers & Industrial Engineering, 2021, 151: 106981. |
[8] | 李佳媛, 何正文. 基于资源随机中断的反应性多模式项目调度优化[J]. 运筹与管理, 2015, 24(6): 44-50. |
Li J Y, He Z W. Optimization of reactive multi-mode project scheduling based on stochastic breakdown of resources[J]. Operations Research and Management Science, 2015, 24(6): 44-50. | |
[9] | 谢芳, 徐哲, 于静. 资源可用量不确定和活动多模式情形下的随机项目调度问题[J]. 管理工程学报, 2022, 36(3): 170-178. |
Xie F, Xu Z, Yu J. Stochastic scheduling of projects with uncertain resource availabilities and multiple modes[J]. Journal of Industrial Engineering and Engineering Management, 2022, 36(3): 170-178. | |
[10] | 彭武良, 林家利. 一种改进的多模式项目反应性调度问题[J]. 运筹与管理, 2022, 31(7): 28-34. |
Peng W L, Lin J L. An improved reactive scheduling problem of multi-mode RCPSP[J].Operations Research and Management Science, 2022, 31(7): 28-34. | |
[11] | Bartusch M, Möhring R H, Radermacher F J. Scheduling project networks with resource constraints and time windows[J]. Annals of Operations Research, 1988, 16(1): 199-240. |
[12] | Cavalcante C C B, Carvalho de Souza C, Savelsbergh M W P, et al. Scheduling projects with labor constraints[J]. Discrete Applied Mathematics, 2001, 112(1-3): 27-52. |
[13] | Wan Z, He J, Tang G. Construction project scheduling problem with uncertain resource constraints[J]. Chinese Journal of Engineering Mathematics, 2005, 22(3): 399-406. |
[14] | Drezet L E, Billaut J C. A project scheduling problem with labour constraints and time-dependent activities requirements[J]. International Journal of Production Economics, 2008, 112(1): 217-225. |
[15] | Fündeling C U, Trautmann N. A priority-rule method for project scheduling with work-content constraints[J]. European Journal of Operational Research, 2010, 203(3): 568-574. |
[16] | Zhang H, Tam C M, Shi J J. Application of fuzzy logic to simulation for construction operations[J]. Journal of Computing in Civil Engineering, 2003, 17(1): 38-45. |
[17] | 何立华. 资源不确定条件下项目调度多目标优化研究[D]. 天津: 天津大学博士学位论文, 2013. |
He L H. Research on the multiple objective optimization of project scheduling under uncertain resource conditions[D]. Tianjin: Doctoral Dissertation of Tianjin University, 2013. | |
[18] | 卢辉, 王红卫, 李锋, 等. 考虑供应不确定性与需求非平稳性的项目调度与材料供应集成优化[J]. 系统工程理论与实践, 2019, 39(3): 647-658. |
Lu H, Wang H W, Li F, et al. Integrated scheduling and material supply planning under nonstationary stochastic demand and random supply yield[J]. Systems Engineering-Theory & Practice, 2019, 39(3): 647-658. | |
[19] | Shariatmadari M, Nahavandi N. A new resource buffer insertion approach for proactive resource investment problem[J].Computers & Industrial Engineering, 2020, 146: 106582. |
[20] | Madadi M, Iranmanesh H. A management oriented approach to reduce a project duration and its risk (variability)[J]. European Journal of Operational Research, 2012, 219(3): 751-761. |
[21] | Martens A, Vanhoucke M. The impact of applying effort to reduce activity variability on the project time and cost performance[J]. European Journal of Operational Research, 2019, 277(2): 442-453. |
[22] | 崔晓, 何正文, 王能民. 考虑信息处理成本的反应性项目调度优化[J]. 系统工程理论与实践, 2021, 41(10): 2581-2594. |
Cui X, He Z W, Wang N M. Reactive project scheduling with information handling cost[J]. Systems Engineering-Theory & Practice, 2021, 41(10): 2581-2594. | |
[23] | Fleszar K, Hindi K S. Solving the resource-constrained project scheduling problem by a variable neighbourhood search[J]. European Journal of Operational Research, 2004, 155(2): 402-413. |
[24] | He Z, He H, Liu R, et al. Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap[J]. Computers & Operations Research,2017,78: 564-577. |
[1] | Baofeng Tian, Jingwen Zhang, Lubo Li, Junjie Chen. Integrated Resource-constrained Project Scheduling and Material Ordering Problem with Limited Storage Space [J]. Chinese Journal of Management Science, 2025, 33(8): 144-155. |
[2] | Wuliang Peng, Xuejun Lin. A Dynamic Reactive Scheduling Method for the Resource Constrained Project Scheduling Problem [J]. Chinese Journal of Management Science, 2025, 33(7): 200-209. |
[3] | Yanting Wang, Weibo Zheng, Zhiqiang Ma, Zhengwen He. Robustness Threshold-based Max-NPV Project Scheduling Optimization on Different Clients’ Payment Modes [J]. Chinese Journal of Management Science, 2025, 33(4): 185-196. |
[4] | Yidan He,Zhengwen He,Nengmin Wang,Zhiqiang Ma. Resource-constrained Max-NPV Multi-project Scheduling Optimization under Sharing Economy Environment [J]. Chinese Journal of Management Science, 2024, 32(9): 260-270. |
[5] | Jingchun Feng,Yaqi Yan,Ke Zhang,Daisong Hu. Robust Optimization Model of Water Environment Treatment Portfolio of Big Rivers for Maximizing Enterprise Income——Taking Yangtze River Protection as an Example [J]. Chinese Journal of Management Science, 2024, 32(6): 323-334. |
[6] | GAO Jia-jing, ZHEN Lu. Research on Routing Problem for Joint Delivery System Based on Multiple Trucks and Robots [J]. Chinese Journal of Management Science, 2023, 31(3): 48-57. |
[7] | LI Yang, FAN Hou-ming, ZHANG Xiao-nan. A Periodic Optimization Model and Solution for Capacitated Vehicle Routing Problem with Dynamic Requests [J]. Chinese Journal of Management Science, 2022, 30(8): 254-266. |
[8] | MA Zhi-qiang, XU Xiao-feng, HE Zheng-wen, WANG Neng-min. Robust Scheduling Optimization of Project Resources with Activity Splitting under Complex and Uncertain Environments [J]. Chinese Journal of Management Science, 2022, 30(3): 117-130. |
[9] | ZHANG Meng-ling, WANG Jing, HUANG Jun. Research on Robust Optimization of Emergency Resource Allocation Based on Supplier Participation Mechanism under Uncertain Demand [J]. Chinese Journal of Management Science, 2020, 28(7): 102-111. |
[10] | MA Yong, HE Zheng-wen, ZHENG Wei-bo. Proactive Project Scheduling Optimization Based on Flexible Resource Constraint [J]. Chinese Journal of Management Science, 2020, 28(7): 220-230. |
[11] | CUI Yu-quan, LIU Bing-jie, LIU Cong, QU Jing-jing. Optimization Model Analysis of New Order Agricultural Cooperation Model [J]. Chinese Journal of Management Science, 2020, 28(12): 140-150. |
[12] | ZHANG Yao, SUN Meng-yang, GUAN Xin. Method of Selecting Project Risk Response Strategies Considering Total Risk Interdependence [J]. Chinese Journal of Management Science, 2020, 28(1): 32-44. |
[13] | WU Zhi-qiao, LU Xiang-yuan, MU Li-feng, TANG Jia-fu. An Optimization Model for System Component Selection to Minimize Cost and Combinational Risk [J]. Chinese Journal of Management Science, 2017, 25(8): 158-165. |
[14] | LAN Bo-xiong, WANG Tong-shu. Optimization Model and Algorithms for Large-scale Rail Passenger Transport Network Operation [J]. Chinese Journal of Management Science, 2016, 24(6): 159-170. |
[15] | LI Gen, LIU Jia-guo, ZHAO Jin-lou. Scenario Analysis of Complete Energy Intensity of Manufacturing Industry in China Based on Input and Output and Non-linear Optimization [J]. Chinese Journal of Management Science, 2016, 24(3): 31-40. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
|