1 |
Project Management Institute(PMI). The standard for portfolio management (Third Edition)[M]. Pennsylvania, USA: Project Management Institute, Inc, 2013.
|
2 |
Okada I, Takahashi K, Zhang Wenqiang, et al. A genetic algorithm with local search using activity list characteristics for solving resource-constrained project scheduling problem with multiple modes[J]. Ieej Transactions on Electrical & Electronic Engineering, 2014, 9(2): 190-199.
|
3 |
Chen Rong, Liang Changyong, Gu Dongxiao, et al. A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution[J]. International Journal of Production Research, 2017, 55(21): 6270-6234.
|
4 |
Confessore G, Giordani S, Rismondo S. An auction based approach in decentralized project scheduling[C]// Proceedings of the 8th International Workshop on Project Management and Scheduling,Valencia,Fundación Universidad-Empresa de Valencia, 2002: 110-113.
|
5 |
Confessore G, Giordani S, Rismondo S. A market-based multi-agent system model for decentralized multi-project scheduling[J]. Annals of Operations Research, 2007, 150(1): 115-135.
|
6 |
王磊,战德臣,聂兰顺.基于市场机制的多项目分散式调度问题[J].计算机集成制造系统,2014,20(8):1969-1979.
|
|
Wang Lei, Zhan Dechen, Nie Lanshun. Multi-project decentralized scheduling problem solving by market mechanism[J]. Computer Integrated Manufacturing Systems, 2014, 20(8): 1969-1979.
|
7 |
Lau J S K, Huang Guoquan, Mak K L, et al. Distributed project scheduling with information sharing in supply chains: part I-an agent-based negotiation model[J]. International Journal of Production Research, 2005, 43(22): 4813-4838.
|
8 |
Homberger J. A (μ, λ)-coordination mechanism for agent-based multi-project scheduling[J]. OR Spectrum, 2012, 34(1): 107-132.
|
9 |
Homberger J, Fink A. Generic negotiation mechanisms with side payments design, analysis and application for decentralized resource-constrained multi-project scheduling problems[J]. European Journal of Operational Research, 2017, 261 (3): 1001-1012.
|
10 |
李飞飞,徐哲,于静.基于序贯博弈谈判机制的分布式多项目调度[J].系统工程理论与实践, 2018, 38(3): 696-709.
|
|
Li Feifei, Xu Zhe, Yu Jing. A sequential game-based negotiation approach to distributed multi-project scheduling problem[J]. Systems Engineering-Theory& Practice, 2018, 38 (3): 696-709.
|
11 |
Michelena N, Kim H M, Papalambros P Y. A system partitioning and optimization approach to target cascading[C]//Proceeding of the International Conference on Engineering Design, Munich, Technische Universität München, 1999(2): 1109-1112.
|
12 |
Michelena N, Park H, Papalambros P Y. Convergence properties of analytical target cascading[J]. AIAA Journal, 2003, 41(5): 897-905.
|
13 |
赵刚, 江平宇. 面向大规模定制生产的e-制造单元目标层解分析优化规划模型[J]. 机械工程学报, 2007, 43(2): 178-190.
|
|
Zhao Gang, Jiang Pinyu. Analytical target cascading based synergistic cell formation model in e-manufacturing system for mass Customization[J]. Journal of Mechanical Engineering, 2007, 43(2): 178-190.
|
14 |
Ling Liuyi, Liang Liang, Pu Xujin. ATC based coordination of distributed production planning and supplier selection[J]. Applied Mathematics & Computation, 2006, 182(2): 1154-1168.
|
15 |
Osman H, Demirli K. A bilinear goal programming model and a modified Benders decomposition algorithm for supply chain reconfiguration and supplier selection [J]. International Journal of Production Economics, 2010, 124(1): 97-105.
|
16 |
邵志芳, 吴继兰. 基于目标级联法的薄膜晶体管液晶显示器生产链协同规划[J]. 计算机集成制造系统, 2018, 244(8): 153-162.
|
|
Shao Zhifang, Wu Jilan. Analytical target cascading based production chain co-planning-TFT-LCD production as an example[J]. Computer Integrated Manufacturing Systems, 2018, 244(8): 153-162.
|
17 |
Zhang Yingfeng, Zhang Geng, Qu Ting, et al. Analytical target cascading for optimal configuration of cloud manufacturing services[J]. Journal of Cleaner Production,2017, 151(10): 330-343.
|
18 |
Michalek J J, Papalambros P Y. An efficient weighting update method to achieve acceptable consistency deviation in analytical target cascading[J]. Journal of Mechanical Design, 2005, 127(2): 206-214.
|