ZHANG Jun-guang, LI Jing. Buffer Monitoring of a Critical Chain Project Based on Activity Heterogeneity[J]. Chinese Journal of Management Science, 2022, 30(6): 106-115.
[1] Goldratt E M. Critical chain: A business novel[M]. Great Barrington, MA: North River Press, 1997. [2] Leach L P. Critical chain project management[M]. London: Artech House, 2014. [3] 别黎, 崔南方. 关键链动态缓冲监控方法研究[J]. 中国管理科学, 2010, 18(6):97-103.Bie Li, Cui Nanfang. Research on dynamic buffer monitoring in critical chain project management[J]. Chinese Journal of Management Science, 2010, 18(6): 97-103. [4] Long L D, Ohsato A. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty[J]. International Journal of Project Management, 2008, 26(6): 688-698. [5] Kuo T C, Chang S H, Huang S N. Due-date performance improvement using TOC’s aggregated time buffer method at a wafer fabrication factory[J]. Expert Systems with Applications, 2009, 36(2):1783-1792. [6] Bevilacqua M, Ciarapica F E, Giacchetta G. Critical chain and risk analysis applied to high-risk industry maintenance: A case study[J]. International Journal of Project Management, 2009, 27(4):419-432. [7] González V, Alarcón L F, Yiu T W. Integrated methodology to design and manage work-in-process buffers in repetitive building projects[J]. Journal of the Operational Research Society, 2013, 64(8): 1182-1193. [8] Vanhoucke M. On the dynamic use of project performance and schedule risk information during project tracking[J]. Omega, 2011, 39(4): 416-426. [9] Hu Xuejun, Cui Nanfang, Demeulemeester E, et al. Incorporation of activity sensitivity measures into buffer management to manage project schedule risk[J]. European Journal of Operational Research, 2016, 249(2):717-727. [10] Zhang Junguang, Shi Ruixia, Diaz E. Dynamic monitoring and control of a critical chain project based on phase buffer allocation[J]. Journal of the Operational Research Society, 2018, 69(12): 1966-1977. [11] 徐小峰, 李想, 刘家国. 项目关键链资源计划进度偏差预警控制模型[J]. 系统工程学报, 2014, 29(6): 845-851.Xu Xiaofeng, Li Xiang, Liu Jiaguo. Schedule variance early-warning control model for project critical chain resource plan[J]. Journal of Systems Engineering, 2014, 29(6): 845-851. [12] Martens A, Vanhoucke M. A buffer control method for top-down project control[J]. European Journal of Operational Research, 2017, 262(1): 274-286. [13] Zhang Junguang, Shi Ruixia, Diaz E. Dynamic monitoring and control of software project effort based on an effort buffer[J]. Journal of the Operational Research Society, 2015, 66(9): 1555-1565. [14] 张俊光, 万丹. 关键链项目实时滚动监控方法研究[J]. 中国管理科学, 2018, 26(4):171-179.Zhang Junguang, Wan Dan. Dynamic real-time monitoring and control of the critical chain project[J]. Chinese Journal of Management Science, 2018, 26(4): 171-179. [15] Zhang Junguang, Wan Dan. Integrated buffer monitoring and control based on grey neural network[J]. Journal of the Operational Research Society, 2019, 70(3): 516-529. [16] 赵振宇, 吕乾雷. 项目进度控制的双边缓冲区方法研究[J]. 工程管理学报, 2010, 24(5):559-563.Zhao Zhenyu, Lyu Qianlei. Study on the double-buffering method for project schedule control[J]. Journal of Engineering Management, 2010, 24(5): 559-563. [17] Hu Xuejun, Demeulemeester E, Cui Nanfang, et al. Improved critical chain buffer management framework considering resource costs and schedule stability[J]. Flexible Services and Manufacturing Journal, 2017, 29(2):159-183. [18] Yuan K J, Chang S H, Li R K. Enhancement of theory of constraints replenishment using a novel generic buffer management procedure[J]. International Journal of Production Research, 2003, 41(4): 725-740. [19] Wu H H, Chen C P, Tsai C H, et al. A study of an enhanced simulation model for TOC supply chain replenishment system under capacity constraint[J]. Expert Systems with Applications, 2010, 37(9): 6435-6440. [20] 孙晓东, 田澎, 赵藜. 消费者异质下基于质量-价格竞争的定价策略选择[J]. 系统管理学报, 2013, 22(3): 349-357.Sun Xiaodong, Tian Peng, Zhao Li. Consumer heterogeneity and pricing strategies: A quality-price competition model[J]. Journal of Systems & Management, 2013, 22(3): 349-357. [21] 蒋传海, 唐丁祥. 厂商动态竞争性差别定价和竞争优势实现—基于消费者寻求多样化购买行为的分析[J]. 管理科学学报, 2012, 15(3): 44-53.Jiang Chuanhai, Tang Dingxiang. Competitive dynamic discriminatory pricing and realization of competitive advantage: An analysis based on consumers’ variety-seeking behavior[J]. Journal of Management Sciences in China, 2012, 15(3): 44-53. [22] Choudhary V, Ghose A, Mukhopadhyay T, et al. Personalized pricing and quality differentiation[J]. Management Science, 2005, 51(7):1120-1130. [23] 别黎, 崔南方, 田文迪, 等. 基于活动敏感性的动态缓冲监控方法研究[J]. 中国管理科学, 2014, 22(10):113-121.Bie Li, Cui Nanfang, Tian Wendi, et al. Research on activity sensitivity index based dynamic buffer monitoring method[J]. Chinese Journal of Management Science, 2014, 22(10): 113-121. [24] Fallah M, Ashtiani B, Aryanezhad M B. Critical chain project scheduling: Utilizing uncertainty for buffer sizing[J]. International Journal of Research and Review for Applied Science, 2010, 3(3): 280-283. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
|