主管:中国科学院
主办:中国优选法统筹法与经济数学研究会
   中国科学院科技战略咨询研究院

Chinese Journal of Management Science ›› 2022, Vol. 30 ›› Issue (1): 143-153.doi: 10.16381/j.cnki.issn1003-207x.2019.0941

• Articles • Previous Articles     Next Articles

Research on Joint Optimization of Equipment Maintenance and Buffer Stock by Considering Insufficient Buffer Stock

LIU Qin-ming, LIU Wen-yi, YE Chun-ming   

  1. Business School, University of Shanghai for Science and Technology, Shanghai 200093, China
  • Received:2019-06-27 Revised:2019-09-09 Online:2022-01-20 Published:2022-01-29
  • Contact: 刘勤明 E-mail:lqm0531@163.com

Abstract: By investigating the actual production status of two-equipment pipeline production system (2M1B system) in a petrochemical enterprise, with the continuous consumption of buffer stock, there are mainly two kinds of buffer stock: sufficient buffer stock and insufficient buffer stock at the end of preventive maintenance of equipment. In the research of preventive maintenance of equipment in 2M1B system with buffer stock, the situation of insufficient buffer stock neglects. Thus, the joint optimization of equipment maintenance and buffer stock in 2M1B system in view of insufficient buffer inventory are studied in this paper.

Key words: preventive maintenance, buffer inventory, 2M1B system, renewal theory, joint optimization

CLC Number: