[1] Wasner M, Zapfel G. An integrated multi-depot hub-location vehicle routing model for network planning of parcel service[J]. International Journal of Production Economics, 2004, 90(3):403-419. [2] 陈义友, 张锦, 罗建强. 顾客选择行为对自提点选址的影响研究[J]. 中国管理科学, 2017, 25(5):135-144. [3] 符卓, 刘文, 邱萌. 带软时间窗的需求依订单拆分车辆路径问题及其禁忌搜索算法[J]. 中国管理科学, 2017, 25(5):78-86. [4] Golden B, Assad A, Levy L, et al. The fleet size and mix vehicle routing problem[J]. Computers & Operations Research, 1984, 11(1):49-66. [5] Liu F H, Shen S Y. The fleet size and mix vehicle routing problem with time windows[J]. Journal of the Operational Research Society, 1999, 50(7):721-732. [6] Taillarde D. A heuristic column generation method for the heterogeneous fleet VRP[J]. RAIRO-Operations Research, 1999, 33(1):1-14. [7] Salhi S, Wassan N, Hajarat M. The fleet size and mix vehicle routing problem with backhauls:Formulation and set partitioning-based heuristics[J]. Transportation Research Part E:Logistics and Transportation Review, 2013, 56:22-35. [8] Zhong H, Hall R W, Dessouky M. Territory planning and vehicle dispatching with driver learning[J]. Transportation Science, 2007, 41(1):74-89. [9] Schneider M. The vehicle-routing problem with time windows and driver-specific times[J]. European Journal of Operational Research, 2016, 250(1):101-119. [10] Schneider M, Doppstadt C, Sand B, et al. A vehicle routing problem with time windows and driver familiarity[R]. Working papr, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL), 2010. [11] Schneider M, Doppstadt C, Stenger A, et al. Ant colony optimization for a stochastic vehicle routing problem with driver learning[C]//IEEE Congress on Evolutionary Computation,Barcelona, Spain, July 18-23, 2010. [12] Sungur I, Ordónez F, Dessouky M. A robust optimization approach for the capacitated vehicle routing problem with demand uncertainty[J]. ⅡE Transactions, 2008, 40(5):509-523. [13] Schneider M, Stenger A, Schwahn F, et al. Territory-based vehicle routing in the presence of time-window constraints[J]. Transportation Science, 2014, 49(4):732-751. [14] Chellaswamy C, Ramesh R, Rau C V. A supervisory control of a fuel free electric vehicle for green environment[C]//Emerging Trends in Electrical Engineering and Energy Management(ICETEEEM), Chennai,Dec 13-15, IEEE, 2012:387-393. [15] Erdoan S, Miller-Hooks E. A green vehicle routing problem[J]. Transportation Research Part E:Logistics and Transportation Review, 2012, 48(1):100-114. [16] Schneider M, Stenger A, Goeke D. The electric vehicle-routing problem with time windows and recharging stations[J]. Transportation Science, 2014, 48(4):500-520. [17] Schneider M, Stenger A, Hof J. An adaptive VNS algorithm for vehicle routing problems with intermediate stops[J]. OR Spectrum, 2015, 37(2):353-387. [18] 杨珺,冯鹏祥,孙昊,等.电动汽车物流配送系统的换电站选址与路径优化问题研究[J].中国管理科学,2015, 23(9):87-96. [19] Bruglieri M, Pezzella F, Pisacane O, et al. A variable neighborhood search branching for the electric vehicle routing problem with time windows[J]. Electronic Notes in Discrete Mathematics, 2015, 47:221-228. [20] 揭婉晨, 杨珺, 杨超. 多车型电动汽车车辆路径问题的分支定价算法研究[J]. 系统工程理论与实践, 2016, 36(7):1795-1805. [21] Penna P H V, Afsar H M, Prins C, et al. A hybrid iterative local search algorithm for the electric fleet size and mix vehicle routing problem with time windows and recharging stations[J]. IFAC-Papers OnLine, 2016, 49(12):955-960. [22] Hiermann G, Puchinger J, Ropke S, et al. The electric fleet size and mix vehicle routing problem with time windows and recharging stations[J]. European Journal of Operational Research, 2016, 252(3):995-1018. [23] Augerat P, Belenguer J M, Benavent E, et al. Computational results with a branch and cut code for the capacitated vehicle routing problem[J]. Rapport de recherche-IMAG,1995. [24] Rinaldi G, Yarrow L A. Optimizing a 48-city traveling salesman problem:A case study in combinatorial problem solving[M]. New York:New York University, Graduate School of Business Administration,1985. [25] Taillard E. Benchmarks for basic scheduling problems[J]. European Journal of Operational Research, 1993, 64(2):278-285. |