[1] 范玉顺. 网络化制造的内涵与关键技术问题[J]. 计算机集成制造系统-CIMS,2003,9(7):576-582.[2] 王宛山,巩亚东,郁培丽. 网络化制造[M]. 沈阳:东北大学出版社,2003.[3] 赵佳宝,张传芹,盛昭瀚. 基于工作流的流程生产调度在线应急管理系统的研究[J]. 管理工程学报,2003,17(3):57-62.[4] 崔少东,陈伟达. 考虑降低碳排放的废钢铁再制造等待时间受限生产调度研究[J]. 工业工程与管理,2014,19(5):57-63.[5] 崔维伟,陆志强. 单机系统的生产调度与预防性维护的集成优化[J]. 上海交通大学学报,2012,46(12):2009-2013.[6] Nekoiemehr N,Selvarajah E,Zhang G Q. Scheduling of jobs with cross families in two stage manufacturing systems[J]. International Journal of Production Economics,2015,167:88-96.[7] 唐建勋,汪恭书,唐立新. 钢铁企业全流程物流优化问题的建模及分支-定价算法[J]. 自动化学报,2013,39(9):1492-1501.[8] 马英,杨善林,汤大为. 带机器准备时间的同类机调度问题的启发式算法[J]. 系统工程理论与实践,2012,32(9):2022-2030.[9] Chen Z L,Pundoor G. Order assignment and scheduling in a supply chain[J]. Operations Research,2006,54(3):555-572.[10] Li C L,Vairaktarakis G. Coordinating production and distribution of jobs with bundling operations[J]. ⅡE Transaction,2007,39(2):203-215.[11] Tang Liang,Jing Ke,He Jie. An improved ant colony optimization algorithm for three-tier supply chain scheduling based on networked manufacturing[J]. International Journal of Production Research,2013,51(13):3945-3962.[12] 程八一,黄小曼,杨艳艳,等. 差异分批模式下的联合成本优化问题及算法[J]. 管理科学学报,2016,19(8):102-112.[13] Yeung W K,Choi T M,Cheng T C E. Supply chain scheduling and coordination with dual delivery modes and inventory storage cost[J]. International Journal of Production Economics,2011,132(2):223-229.[14] 孙靖,林杰. 信息不完全共享下MC供应链动态调度模型研究[J]. 系统仿真学报,2007,19(9):1943-1948.[15] Guo Zhaoxia,Shi Leyuan,Chen Longchao,et al. A harmony search-based memetic optimization model for integrated production and transportation scheduling in MTO manufacturing[J]. Omega,2017,66:327-343.[16] Torabi S A,Ghomi S M T,Karimi B. A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains[J]. European Journal of Operational Research,2006,173(1):173-189.[17] Rasti-Barzoki M,Hejazi S R. Pseudo-polynomial dynamic programming for an integrated due date assignment,resource allocation,production,and distribution scheduling model in supply chain scheduling[J]. Applied Mathematical Modelling,2015,39(12):3280-3289.[18] Y?lmaz Ö F,Pardalos P M. Minimizing average lead time for the coordinated scheduling problem in a two-stage supply chain with multiple customers and multiple manufacturers[J]. Computers & Industrial Engineering,2017,114:244-257.[19] Liu Xufei,Chung Tsuiping. An outsourcing-scheduling problem in a two-stage supply chain via improved immunoglobulin-based artificial immune system[J]. Computers & Industrial Engineering,2017,113:819-830.[20] 薛梅,周志平. 批处理机环境下生产与两阶段运输协同调度问题研究[J]. 中国管理科学,2016,24(S1):22-28.[21] 韩文民,朱弢,李正义,等.订单陆续到达下虚拟单元重调度驱动决策[J]. 中国管理科学,2017,25(12):126-137.[22] Kolisch R,Hess K. Efficient methods for scheduling make-to-order assemblies under resource,assembly area and part availability constraints[J]. International Journal of Production Research,2000,38(1),207-228.[23] Sawik T. Coordinated supply chain scheduling[J]. International Journal of Production Economics,2009,120(2):437-451.[24] Selvarajah E,Zhang R. Supply chain scheduling at the manufacturer to minimize inventory holding and delivery costs[J]. International Journal of Production Economics,2014,147:117-124.[25] Yimer A,Demirli K. A genetic approach to two-phase optimization of dynamic supply chain scheduling[J]. Computers & Industrial Engineering,2010,58(3):411-422.[26] Sawik T. Integrated supply,production and distribution scheduling under disruption risks[J]. Omega,2016,62:131-144.[27] Hall N G,Potts C N. Supply chain scheduling:Batching and delivery[J]. Operations Research,2003,51(4):566-584.[28] Agnetis A,Aloulou M A,Fu L L. Production and Interplant Batch Delivery Scheduling:Dominance and Cooperation[J]. International Journal of Production Economics,2016,182:38-49.[29] Wang G,Gunasekaran A. Operations scheduling in reverse supply chains:Identical demand and delivery deadlines[J]. International Journal of Production Economics,2017,183:375-381.[30] Chen Zhilong. Integrated production and outbound distribution scheduling:Review and extensions[J]. Operations Research,2010,58(1):130-148.[31] 唐亮,何杰,靖可,等. 时间窗口约束下基于改进蚁群算法的协同制造调度研究[J]. 中国管理科学,2018,26(4):97-107.[32] Bean J C,Birge J R,Mittenthal J,et al. Match-up scheduling with multiple resources,release dates and disruptions[J]. Operations Research,1991,39(3):470-483.[33] Yang B,Geunes J. Predictive-reactive scheduling on a single resource with uncertain future jobs[J]. European Journal of Operational Research,2008,189(3):1267-1283.[34] 刘乐,周泓. 新工件到达干扰下单机最大延迟时间重调度[J]. 系统工程学报,2014,29(4):494-506.[35] Akturk M S,Gorgulu E. Match-up scheduling under a machine breakdown[J]. European Journal of Operational Research,1999,112(1):81-97.[36] Moinzadeh K,Aggarwal P. Analysis of a production/inventory system subject to random disruptions[J]. Management Science,1997,43(11):1577-1588. |