Chinese Journal of Management Science ›› 2022, Vol. 30 ›› Issue (4): 275-286.doi: 10.16381/j.cnki.issn1003-207x.2020.1026
• Articles • Previous Articles
LIU Ming1, XU Xi-fen1, NING Jing1, CAO Jie2
Received:
2020-06-01
Revised:
2020-07-29
Online:
2022-04-20
Published:
2022-04-26
Contact:
曹杰
E-mail:cj@amss.ac.cn
CLC Number:
LIU Ming, XU Xi-fen, NING Jing, CAO Jie. Modeling and Optimizing Method for Rebalancing the Dock-less Bicycles based on Order Data Analysis[J]. Chinese Journal of Management Science, 2022, 30(4): 275-286.
[1] 前瞻产业研究院. 2020-2025中国共享单车行业市场前瞻与投资规划分析报告[EB/OL].(2019-12-12)[2020-6-1]. https://bg.qianzhan.com/report/detail/1703231703145753.html. [2] 陈传红, 李雪燕. 市民共享单车使用意愿的影响因素研究[J]. 管理学报, 2018, 15(11): 1601-1610.Chen Chuanhong, Li Xueyan. Research on the effect factors of customer use intention of shared bicycles [J]. Chinese Journal of Management, 2018, 15(11): 1601-1610. [3] 郝雅立, 温志强. 共建共治共享:大数据支持下共享单车智能化治理路径[J]. 管理评论, 2019, 31(1): 249-254.Hao Yali, Wen Zhiqiang. Common construction, Governing and sharing: Intelligent management path of sharing bike by big data supporting [J]. Management Review, 2019, 31(1): 249-254. [4] Chow J, Sayarshad H. Symbiotic network design strategies in the presence of coexisting transportation networks[J]. Transportation Research Part B: Methodological, 2014, 62: 234-267. [5] 董红召, 吴满金, 刘冬旭, 等. 城市公共自行车系统自然租赁需求估算方法[J]. 浙江大学学报(工学版), 2016, 50(2): 265-270.Dong Hongzhao, Wu Manjin, Liu Dongxu, et al. Estimation method of natural demand of urban public bicycle system[J]. Journal of Zhejiang University (Engineering Science), 2016, 50(2): 265-270. [6] Okawa M, Tanaka Y, Kurashima T, et al. Marked temporal point processes for trip demand prediction in bike sharing systems[J]. IEICE Transactions on Information and Systems, 2019, 102(9): 1635-1643. [7] Shu Jia, Mabel C, Liu Q, et al. Models for effective deployment and redistribution of bicycles within public bicycle-sharing systems[J]. Operations Research, 2013, 61(6): 1346-1359. [8] 胡列格, 夏云, 王佳, 等. 城市公共自行车高峰期需求不均衡的调度优化研究[J]. 铁道科学与工程学报, 2015, 12(2): 441-448.Hu Liege, Xia Yun, Wang Jia, et al. Scheduling optimization research on demand imbalance of urban public bicycles during peak period[J]. Journal of Railway Science and Engineering, 2015, 12(2): 441-448. [9] Shen Yu, Zhang Xiaohu, Zhao Jinhua. Understanding the usage of dockless bike sharing in singapore[J]. International Journal of Sustainable Transportation, 2018, 12(9): 686-700. [10] 周超, 周亚男, 李振世, 等. 基于大数据的南京市共享单车时空特征研究[J]. 西南师范大学学报(自然科学版), 2018, 43(10): 66-73.Zhou Chao, Zhou Yanan, Li Zhenshi, et al. Research on space-time characteristics of shared bikes in Nanjing based on big data[J]. Journal of Southeast China Normal University (Natural Science Edition), 2018, 43(10): 66-73. [11] Du Yuchuan, Deng Fuwen, Liao Feixiong. A model framework for discovering the spatio-temporal usage patterns of public free-floating bike-sharing system[J]. Transportation Research Part C: Emerging Technologies, 2019, 103: 39-55. [12] Pal A, Zhang Yu. Free-floating bike sharing: Solving real-life large-scale static rebalancing problems[J]. Transportation Research Part C: Emerging Technologies, 2017, 80: 92-116. [13] Liu Ying, Szeto W Y, Ho S C. A static free-floating bike repositioning problem with multiple heterogeneous vehicles, multiple depots, and multiple visits[J]. Transportation Research Part C: Emerging Technologies, 2018, 92: 208-242. [14] Caggiani L, Camporeale R, Ottomanelli M, et al. A modeling framework for the dynamic management of free-floating bike Sharing systems[J]. Transportation Research Part C: Emerging Technologies, 2018, 87: 159-182. [15] 徐国勋, 李妍峰, 李军, 等. 多类型公共自行车调运问题[J]. 运筹与管理, 2019, 28(1): 116-124.Xu Guoxun, Li Yanfeng, Li Jun, et al. A multi-type bike repositioning problem[J]. Operations Research and Management Science, 2019, 28(1): 116-124. [16] 白雪, 周支立, 钱桂生, 等. 考虑维修车辆的公共自行车系统再平衡问题[J]. 系统工程理论与实践, 2018, 38(9): 2326-2334.Bai Xue, Zhou Zhili, Chin K S. Bike rebalancing problem considering broken bike collection[J]. System Engineering-Theory & Practice, 2018, 38(9): 2326-2334. [17] 鄢章华, 刘蕾. 考虑服务水平与动态转移规律的共享单车投放策略研究[J]. 中国管理科学, 2019, 27(9): 195-204.Yan Zhanghua, Liu Lei. Supply optimization for bicycle sharing system considering service level and dynamic transfer[J]. Chinese Journal of Management Science, 2019, 27(9): 195-204. [18] Zhang J, Meng M, Wang Z W. A dynamic pricing scheme with negative prices in dockless bike sharing systems[J]. Transportation Research Part B: Methodological, 2019, 127: 201-224. [19] Du Yuchuan, Deng Fuwen. Preferred location strategy for self-equilibrium of free-floating bike-sharing systems[C]//Proceedings of the International Conference of Hong Kong Society for Transportation Studies: Transport and Society, Hong Kong, December 8-11, 2017:190-198. [20] Reiss S, Bogenberger K. A relocation strategy for Munich's bike sharing system: Combining an operator-based and a user-based scheme[J]. Transportation Research Procedia, 2017, 22: 105-114. [21] Pan Ling, Cai Qingpeng, Fang Zhixuan, et al. A deep reinforcement-learning framework for rebalancing dockless bike sharing systems[C]//Proceedings of the 33rd AAAI Conference on Artificial Intelligence (AAAI), Honolulu, Hawaii, January 27-February 1, 2019:1-9. [22] 关宏志, 卢笙. 考虑用户参与的共享单车调度模型[J]. 北京工业大学学报, 2019, 45(11): 1050-1056.Guan Hongzhi, Lu Sheng. Scheduling model of freee-floating bike-sharing considering user’s participation[J]. Journal of Beijing University of Technology, 2019, 45(11): 1050-1056. [23] 赵菊, 邱菊, 侯春波. 准公共产品:基于政府监管机制的共享单车投放管理研究[J]. 中国管理科学, 2021, 29(1): 149-157.Zhao Ju, Qiu Ju, Hou Chunbo. Quasi-public products: Research on volume management of sharing bike considering government regulatory mechanism [J]. Chinese Journal of Management Science, 2021, 29(1): 149-157. |
[1] | LIU Wan-jun, ZHANG Jing-wen, LIU Wan-lin. Dynamic Decentralized Resource-constrained Multi-Project Scheduling Problem with Transfer Times Based on Auction Mechanism [J]. Chinese Journal of Management Science, 2022, 30(8): 117-129. |
[2] | MA Zhi-qiang, XU Xiao-feng, HE Zheng-wen, WANG Neng-min. Robust Scheduling Optimization of Project Resources with Activity Splitting under Complex and Uncertain Environments [J]. Chinese Journal of Management Science, 2022, 30(3): 117-130. |
[3] | WANG Tian, ZHENG Zhong. The Impact of Risk Aversion of An Unreliable Supplier on Supply Chain Performance [J]. Chinese Journal of Management Science, 2022, 30(1): 165-174. |
[4] | ZHU Li-long, RONG Jun-mei, Zhang Si-yi. Three-party Evolutionary Game and Simulation Analysis of Drug Quality Supervision under the Government Reward and Punishment Mechanism [J]. Chinese Journal of Management Science, 2021, 29(11): 55-67. |
[5] | MA Yong, HE Zheng-wen, ZHENG Wei-bo. Proactive Project Scheduling Optimization Based on Flexible Resource Constraint [J]. Chinese Journal of Management Science, 2020, 28(7): 220-230. |
[6] | ZHU Li-long, RONG Jun-mei. Drug Quality Supervision Strategy Considering Patient Feedback Mechanism under the Background of “Internet+Medical Health” [J]. Chinese Journal of Management Science, 2020, 28(5): 122-135. |
[7] | LIU Ming, LI Ying-zhu, CAO Jie, ZHANG Ding. An Optimal Design of Emergency Logistics Network for Epidemic Controlling based on Service Level [J]. Chinese Journal of Management Science, 2020, 28(3): 11-20. |
[8] | GUAN Zi-li, ZHANG Xu-mei, DAN Bin. Information Sharing and Incentive Strategy in Supply Chain when Manufacturer Service Affecting Sales under Demand Uncertainty [J]. Chinese Journal of Management Science, 2019, 27(10): 56-65. |
[9] | LI Qian, TAO Sha, ZHOU Xiao-yuan, SHENG Zhao-han. Time-Cost Trade-off Optimization of Construction Project Considering Workspace Interference [J]. Chinese Journal of Management Science, 2019, 27(10): 170-178. |
[10] | GONG Yuan-yuan, XIAO Yong-bo. Dynamic Inventory Rationing for Cross-Season Sales of Fresh Products [J]. Chinese Journal of Management Science, 2019, 27(7): 83-93. |
[11] | LI Peng-fei, MA Hang. Virus Based on Cooperative Genetic Algorithm Automated Warehouse Space Optimization Model [J]. Chinese Journal of Management Science, 2017, 25(5): 70-77. |
[12] | GENG Rui, ZHU Jian-jun, WANG He-hua, LIU Xiao-di. Optimization of the Costs in Multi-tasking Grey GERT Based on z Tags [J]. Chinese Journal of Management Science, 2017, 25(4): 133-142. |
[13] | GUO Chuan-hao, CHEN Fang, SHAN Er-fang. Cost and Revenue Optimization for Supply Chain Network of Dairy Products with Short-Life-Cycle [J]. Chinese Journal of Management Science, 2017, 25(2): 87-97. |
[14] | XIONG Feng, PENG Jian, JIN Peng, ZHANG Xiang-yang, QIU Yun. The ImpactOf Relational Contracts Stability about Fresh Agricultural Product Supply Chain Study: From the Persepective of Cold Chain Facilities Subsidy Mode [J]. Chinese Journal of Management Science, 2015, 23(8): 102-111. |
[15] | CAO Xiao-gang, ZHENG Ben-rong, WEN Hui. Pricing and Coordination Decision of the Dual Channel Closed-loop Supply Chain Considering the Customer Preference [J]. Chinese Journal of Management Science, 2015, 23(6): 107-117. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
|