主管:中国科学院
主办:中国优选法统筹法与经济数学研究会
   中国科学院科技战略咨询研究院

Chinese Journal of Management Science ›› 2013, Vol. ›› Issue (1): 111-117.

Previous Articles     Next Articles

Research on Multi-suppliers Horizontally Synchronization Based on Space-constrained Construction Supply Chain

LI Yi-peng1,2, MA Shi-hua2   

  1. 1. School of Information and Safety Engineering, Zhongnan University of Economics and Law, Wuhan 430073, China;
    2. School of Management, HuaZhong University of Science and Technology, Wuhan 430074, China
  • Received:2011-02-28 Revised:2012-07-05 Online:2013-02-28 Published:2013-02-26

Abstract: A construction supply chain consisting of multi-suppliers and one main contractor is considered, in the context of constrained building material space. How multi uncertain suppliers horizontally synchronized supply to reduce the main contractor’s expected total cost is identified. Through information sharing among supply chain, multi-suppliers horizontally synchronized basic model is presented. Then through capacity outsourcing or expediting, multi-suppliers horizontally synchronized advanced model is presented. Finally, the whole proceed of building material supply is simulated by Monte Carlo methodology. The result shows: compared with traditional supply model, these two synchronized model can decrease the main contractor’s expected total cost effectively. The basic model’s cost is minimum, and the advanced model can reduce the cost of construction duration delay. Pareto improvement of construction supply chain is achieved.

Key words: construction supply chain, horizontal synchronization, space-constrained, multi-suppliers

CLC Number: