主管:中国科学院
主办:中国优选法统筹法与经济数学研究会
   中国科学院科技战略咨询研究院

Chinese Journal of Management Science ›› 2000, Vol. ›› Issue (1): 17-21.

Previous Articles     Next Articles

Study on the Production Schedule and Control Mechanism in DBR

ZHOU Feng   

  1. Wuhan Metallurgical University of Science and Technology, Wuhan 430081
  • Received:1998-11-19 Online:2000-03-28 Published:2012-03-06

Abstract: With the inspiration of a troop analogy, the paper first reveals the idea of DBR and its "Synchronous Manufacturing" characteristics. Then the author gives a systematic study on the three organic element of production and control mechanism in DBR. The author also believes the idea and methods in DBR will be beneficial to improving the management in our enterprises.

Key words: DBR, bottleneck resource, buffer mechanism, schedule mechanism, control mechanism

CLC Number: