[1] |
史文强, 孔昭君, 汪明月. 考虑需求中断和购买者过度自信的应急物资动员链协调[J]. 控制理论与应用, 2020, 37(10): 2163-2177.
|
|
Shi W Q, Kong Z J, Wang M Y. Coordination of emergency materials mobilization chain considering demand disruption and purchaser’s overconfidence[J]. Control Theory & Applications, 2020, 37(10): 2163-2177.
|
[2] |
Xiao T, Qi X. Price competition, cost and demand disruptions and coordination of a supply chain with one manufacturer and two competing retailers[J]. Omega, 2008, 36(5): 741-753.
|
[3] |
Ali S M, Rahman M H, Tumpa T J, et al. Examining price and service competition among retailers in a supply chain under potential demand disruption[J]. Journal of Retailing and Consumer Services, 2018, 40: 40-47.
|
[4] |
Yan B, Chen Z, Liu Y P, et al. Pricing decision and coordination mechanism of dual-channel supply chain dominated by a risk-aversion retailer under demand disruption[J]. RAIRO - Operations Research, 2021, 55(2): 433-456.
|
[5] |
陈崇萍, 陈志祥. 供应商产出随机与供应中断下的双源采购决策[J]. 中国管理科学, 2019, 27(6): 113-122.
|
|
Chen C P, Chen Z X. Optimal dual-sourcing procurement decisions with suppliers' random yield and disruptions[J]. Chinese Journal of Management Science, 2019, 27(6): 113-122.
|
[6] |
王静, 陈希. 考虑供应链中断风险的制造商风险应对方案研究[J]. 工业工程与管理, 2019, 24(3): 27-34.
|
|
Wang J, Chen X. Manufacturer’s risk response under supply chain disruption risk[J]. Industrial Engineering and Management, 2019, 24(3): 27-34.
|
[7] |
Gupta V, Ivanov D. Dual sourcing under supply disruption with risk-averse suppliers in the sharing economy[J]. International Journal of Production Research, 2020, 58(1): 291-307.
|
[8] |
Zhang Y, Zhang T. Complex dynamics in a closed-loop supply chain with risk aversion and fairness concerns under supply disruption[J]. International Journal of Bifurcation and Chaos, 2021, 31(9): 2150132.
|
[9] |
王海军, 张瑞娜, 郭羽洪, 等. 零售商补贴对供应链可靠性协调策略影响研究[J]. 管理工程学报, 2021, 35(4): 190-201.
|
|
Wang H J, Zhang R N, Guo Y H, et al. The impact of retailer subsidy on supply chain reliability coordination strategy[J]. Journal of Industrial Engineering and Engineering Management, 2021, 35(4): 190-201.
|
[10] |
杨洋, 邹明阳, 谢国强, 等. 重大突发公共卫生事件下的供应链恢复机制[J]. 管理学报, 2020, 17(10): 1433-1442.
|
|
Yang Y, Zou M Y, Xie G Q, et al. Distributed wake-up: Supply chain recovery mechanism under major public health emergencies[J]. Chinese Journal of Management, 2020, 17(10): 1433-1442.
|
[11] |
Paul S K, Chowdhury P. A production recovery plan in manufacturing supply chains for a high-demand item during COVID-19[J]. International Journal of Physical Distribution & Logistics Management, 2021, 51(2): 104-125.
|
[12] |
Ivanov D, Das A. Coronavirus (COVID-19/SARS-CoV-2) and supply chain resilience: A research note[J]. International Journal of Integrated Supply Management, 2020, 13(1): 90-102.
|
[13] |
Hosseini S, Ivanov D. Bayesian networks for supply chain risk, resilience and ripple effect analysis: A literature review[J]. Expert Systems with Applications, 2020, 161: 113649.
|
[14] |
Soni U, Jain V, Kumar S. Measuring supply chain resilience using a deterministic modeling approach[J]. Computers & Industrial Engineering,2014,74: 11-25.
|
[15] |
Sahu A K, Datta S, Mahapatra S S. Evaluation of performance index in resilient supply chain: A fuzzy-based approach[J]. Benchmarking, 2017, 24(1): 118-142.
|
[16] |
Urciuoli L, Mohanty S, Hintsa J, et al. The resilience of energy supply chains: A multiple case study approach on oil and gas supply chains to Europe[J]. Supply Chain Management, 2014, 19(1): 46-63.
|
[17] |
Lücker F, Chopra S, Seifert R W. Mitigating product shortage due to disruptions in multi-stage supply chains[J]. Production and Operations Management, 2021, 30(4): 941-964.
|
[18] |
Chakraborty T, Chauhan S S, Ouhimmou M. Mitigating supply disruption with a backup supplier under uncertain demand: Competition vs. cooperation[J]. International Journal of Production Research, 2020, 58(12): 3618-3649.
|
[19] |
王之乐, 张纪海. 基于系统动力学的应急物资动员潜力评估[J]. 系统工程理论与实践, 2019, 39(11): 2880-2895.
|
|
Wang Z L, Zhang J H. An evaluation of emergency materials mobilization potential based on system dynamics[J]. Systems Engineering-Theory & Practice, 2019, 39(11): 2880-2895.
|
[20] |
刘纯霞, 陈友余, 汪寿阳. 运营中断风险下企业营业中断保险购买策略研究[J]. 中国管理科学, 2023, 31(4): 26-34.
|
|
Liu C X, Chen Y Y, Wang S Y. Purchase strategy of business interruption insurance under the risk of operational interruption[J]. Chinese Journal of Management Science, 2023, 31(4): 26-34.
|
[21] |
Bhavathrathan B K, Patil G R. Capacity uncertainty on urban road networks: A critical state and its applicability in resilience quantification[J]. Computers, Environment and Urban Systems, 2015, 54: 108-118.
|
[22] |
郭晓婷. 浙江省已完成民政部救灾帐篷生产任务的97.74%[EB/OL].(2008-06-18)[2022-12-01]. .
|
|
Guo X T. 97.74% of the production task of disaster relief tents by the Ministry of Civil Affairs has been completed in Zhejiang Province[EB/OL].(2008-06-18)[2022-12-01]..
|