The credit sales can enhance the competitiveness of enterprises, expand business scale, and help sales enterprises to ease the financial pressure. It has a great influence on the operation efficiency of the supply chain, and has become one of the important research topics in the field of supply chain management. The ameliorating items are a kind of ubiquitous goods, but the problem of joint purchasing for ameliorating items has not gotten enough attention. In a two-echelon supply chain of ameliorating items consisting of one supplier and multiple retailers, the supplier provide permissible delay in payments as a means of credit sales. The function of total cost per unit time of independent purchasing and joint purchasing for the retailers are built up respectively, and the optimal order cycle and minimum total cost per unit time of retailers under two purchasing modes are obtained. According to the relationship between the optimal order cycle and the delayed payment period, the functions of minimum total cost per unit time of the two purchasing modes are compared, and the conditions that joint purchasing is better than independent purchasing are got. On this basis, the minimum total cost per unit time of joint purchasing is treated as the allocation object, and multiple persons cooperative game theory is applied to transforming the cost allocation of joint purchasing problem into multiple persons cooperation game problem. After providing some basic properties of the game, a cost sharing method is designed based on the core of the game. Finally, the numerical example and sensitivity analysis are used to illustrate the theoretical results, and some managerial implications are put forward. The research can provide practical guidance significance for the enterprises who engaged in the production and sale of ameliorating items.
[1] 商务部,财政部,中国人民银行等.关于推动信用销售健康发展的意见(商秩发
[2008] 88号)[R/OL].[2009-3-17].www.gov.cn/zwgk/2009-03/17/content_1261108.htm.
[2] Goyal S K. Economic order quantity under conditions of permissible delay in payments[J].Journal of the Operational Research Society, 1985,36(4):335-338.
[3] Aggarwal S P, Jaggi C K. Ordering policies of deteriorating items under permissible delay in payments[J]. Journal of the Operational Research Society, 1995, 46(5):658-662.
[4] Jamal A M M, Sarker B R, Wang Shaojun. An ordering policy for deteriorating items with allowable shortage and permissible delay in payment[J]. Journal of the Operational Research Society, 1997, 48(8):826-833.
[5] Huang Y F. Optimal retailer's ordering policies in the EOQ model under trade credit financing[J].Journal of the Operational Research Society, 2003, 54(9):1011-1015.
[6] Liao J J. An EOQ model with non-instantaneous receipt and exponentially deteriorating items under two-level trade credit[J]. International Journal of Production Economics, 2008, 113(2):852-861.
[7] Min Jie, Zhou Yongwu, Zhao Ju. An inventory model for deteriorating items under stock-dependent demand and two-level trade credit[J].Application Mathematics Model, 2010, 34(11):3273-3285.
[8] Teng J T, Min Jie, Pan Qinhua. Economics order quantity model with trade credit financing for non-Decreasing demand[J]. Omega, 2012, 40(3):328-335.
[9] Chen S C, Cardenas-Barron L E, Teng J T. Retailer's economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity[J]. International Journal of Production Economics, 2014, 155(9):284-291.
[10] Chen S C, Teng J T, Skouri K. Economic production quantity models for deteriorating items with up-stream full trade and down-stream partial trade credits[J]. International Journal of Production Economics, 2014, 155(9):302-309.
[11] Liao J J, Huang K N, Ting P S. Optimal strategy of deteriorating items with capacity constraints under two-levels of trade credit policy[J]. Application Mathematics & Computer,2014, 233(5):647-658.
[12] Mahata G C. Retailer's optimal credit period and cycle time in a supply chain for deteriorating items with up-stream and down-stream trade credits[J]. Journal of Industrial Engineering International, 2015, 11(3):353-366.
[13] Luo Jianwen. Buyer-vendor inventory coordination with credit period incentives[J]. International Journal of Production Economics, 2007, 108(1-2):143-152.
[14] Sarmah S P, Acharya D, Goyal S K. Coordination and profit sharing between a manufacturer and a buyer with target profit under credit option[J]. European Journal of Operational Research, 2007, 182(3):1469-1478.
[15] 骆建文.基于交易信用激励的供应链协调机制[J].系统管理学报,2009,18(1):49-55.
[16] Luo Jianwen, Zhang Qinhong.Trade credit:A new mechanism to coordinate supply chain[J]. Operations Research Letters, 2012, 40(5):378-384.
[17] Arkan A, Hejazi S R. Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period[J]. Computers and Industrial Engineering,2012, 62(1):56-69.
[18] 曾顺秋,骆建文,钱佳.可控提前期下基于交易信用契约的供应链协调模型[J].管理工程学报, 2014,28(2):93-99.
[19] 曾顺秋,骆建文.基于价格折扣与交易信用组合契约的供应链协调策略[J].管理工程学报,2014, 28(4):106-111,81.
[20] Hwang H S. A study on inventory model for items with Weibull ameliorating[J].Computers & Industrial Engineering, 1997, 33(3/4):701-704.
[21] Moon I, Giri B C, Ko B. Economic order quantity models for ameliorating/deteriorating Items under inflation and time discounting[J]. European Journal of Operational Research, 2005, 162(3):773-785.
[22] Law S T, Wee H M. A integrated production inventory model for ameliorating and deteriorating items taking account of time discounting[J]. Mathematical and Computer Modelling, 2006, 43(5/6):673-685.
[23] Sana S S. Demand influenced by enterprises' initiatives-A multi-item EOQ model of deteriorating and ameliorating items[J]. Mathematical and Computer Modelling, 2010, 52(1/2):284-302.
[24] Dem H, Singh S R. A production model for ameliorating items with quality consideration[J]. International Journal of Operational Research, 2013, 17(2):183-198.
[25] Goyal S K, Singh S R,Himani D. Production policy for amelioration/deteriorating items with ramp type demand[J]. International Journal of Procurement Management, 2013, 6(4):444-465.
[26] 王勇,孙海雷,陈晓旭.基于数量折扣的改良品供应链协调策略[J].中国管理科学,2014,22(4):51-57.
[27] 孙海雷,王勇,陈晓旭,等.基于价格折扣的改良品供应链的协调策略研究[J].系统工程学报,2014,29(1):75-84.
[28] 张云丰,王勇,孙海雷,等.数量折扣激励下考虑缺货的改良品供应链协调研究[J].计算机集成制造系统,2016,22(3):813-821.
[29] 张云丰,王勇,龚本刚,等.非瞬时补货下改良品联合采购决策[J].中国管理科学,2016,24(10):124-132.
[30] Wee H M, Lo S T, Yu J, et al. An inventory model for ameliorating and deteriorating items taking account of time value of money and finite planning horizon[J]. International Journal of Systems Science, 2008, 39(8):801-807.
[31] Chou S Y, Chouhuang W T, Lin J S, et al. An analytic solution approach for the economic order quantity model with Weibull ameliorating items[J]. Mathematical and Computer Modelling, 2008, 48(11-12):1868-1874.
[32] Chang C T, Ouyang L Y, Teng J T. An EOQ model for deteriorating items under supplier credits linked to ordering quantity[J]. Applied Mathematical Modelling, 2003, 27(12):983-996.
[33] Deng Xiaotie, Papadimitriou C H. On the complexity of cooperative solution concept[J]. Mathematics of Operations Research, 1994, 19(2):257-266.
[34] 冯海荣,李军,曾银莲.易腐品供应链企业联合采购决策与费用分配研究[J].系统科学与数学,2011,31(11):1454-1466.