Maintaining a high level of system availability is the fundamental gurantee of the profitability of firms operating mission-critical equipment in an environment characterized by low-frequency, high-impact events such as equipment failures. Once an operational disruption occurs, the firm hardly affords significant operational downtime and often causes financial distress. To mitigate the severe impact of the unexpected disruptions, a proper incentive mechanism has to be in place so that the service supplier would commit the necessary capacity for recovery. Meanwhile, the financial distress risk can be mitigated by transferring the financial liability away to a third party insurer. Performance-based contracting (PBC) is an emerging incentive mechanism where the supplier receives compensation based on realized availability. Business interruption insurance (BI) can protect against the potentially financial risk for the firms. In the paper, the principal-agent contracting models are proposed for an outsourcing setting in which the firm cannot write the supplier's service capacity decision directly into the contract but instead must incentivize the supplier using the PBC and where the firm makes decision on purchasing the BI to eliminate the downtime loss and transfer financial distress. The service performance of the PBC between the firm and the supplier is measured by not only the cumulative downtime but also the individual service experience. The PBC contract design model is presented firstly as the benchmark, in which the firm has to choose the optimal pair of contract terms consisting of the fixed payment and the penalty rate to maximize profit composing the expected production profit of the equipment uptime, the payment to the supplier, production downtime loss, financial distress loss and the goodwill loss, while the supplier chooses optimal service capacity to maximize his utility composing the payment from the firm and the capacity cost. Secondly, the PBC contract model with the BI is proposed, where the insurance premium term is added and the downtime loss and financial distress loss are eliminated in the firm's objective function. Finally, it is explored how the BI impacts on the optimal PBC contract terms and whether the BI need be purchased. The major insights from our analysis are followed: (1) the frequency of disruptions is an important factor in determining contract terms and the supplier's capacity investment decision. (2) The BI and the performance incentive of the PBC contract are partly substitutable. (3) The BI can reduce the sensibility of which the frequency of disruptions influences on the the supplier's capacity, contract terms and the firm's profit. The study is a first attempt on the understanding of the interplay between operation and insurance in the maintenance service of the mission-critical equipment. The theoretical results contribute to the decision-making of the operation-finance interface in the firm operating mission-critical equipment.
QIN Xu-wei, YANG Yu-pei, KANG Wan-gen, DOU Na
. The Performance-based Contracting Design Models Integrated with Business Interruption Insurance for the Maintenance Services of Mission-critical Equipment[J]. Chinese Journal of Management Science, 2016
, 24(11)
: 19
-28
.
DOI: 10.16381/j.cnki.issn1003-207x.2016.11.003
[1] Kim S H, Tomlin B. Strategic failure prevention and recovery capacity investments [J]. Management Science, 2013, 59(7): 1631-1649.
[2] British Energy. Results for the three months ended 29 June 2008 of the financial year ending 31 March 2009. Presentation, British Energy, East Kilbride, UK.
[3] Hypko P,Tilebein M,Gleich R. Clarifying the concept of performance-based contracting in manufacturing industries:A research synthesis[J]. Journal of Service Management, 2010, 21 (5):625-655.
[4] Ng I C L, Nudurupati S S. Outcome-based service contracts in the defense industry: mitigating the challenges [J]. Journal of Service Management, 2010, 21 (5): 656-674.
[5] Guajardo J A, Cohen M A, Kim S H, et al. Impact of performance-based contracting on product reliability: An empirical analysis [J].Management Science, 2012, 58(5): 961-979.
[6] Kim S H, Cohen M A, Netessine S. Performance contracting in after-sales service supply chains [J]. Management Science, 2007, 53(12): 1843-1858.
[7] 刘丽文, 郭祥雷. 武器装备保障供应链中基于绩效的整体外包机制[J]. 中国管理科学, 2009,17(6): 91-97.
[8] Kim S H, Cohen M A, Netessine S, et al. Contracting for infrequent restoration and recovery of mission-critical systems [J]. Management Science, 2010, 56(9):1551-1567.
[9] Jain N, Hasija S, Popescu D G. Optimal contracts for outsourcing of repair and restoration services [J]. Operations Research, 2013, 61(6):1295-1311.
[10] 陶存文, 耿宇亭.国外营业中断保险制度及其启示[J].保险研究, 2008,(4):6-10.
[11] Galey G,Sormani E,Meier W. Business interruption insurance[M]. Zurich:Swiss Reinsurance Company Technical Publishing, 2004.
[12] 徐常梅.利润损失保险学[M] .上海:复旦大学出版社, 2007.
[13] Dong L, Tomlin B. Managing disruption risk: The interplay between operations and insurance [J]. Management Science, 2012, 58(10): 1898-1915.
[14] Zhen Xueping, Li Yongjian, Cai G, et al. Transportation disruption risk management: Business interruption insurance and backup transportation[J]. Transportation Research Part E:Iogistics and Trarsportation Review, 2016, 90 (6): 51-68.