[1] |
Kumar S S, Cheng J C P. A BIM-based automated site layout planning framework for congested construction sites[J].Automation in Construction, 2015,59: 24-37.
|
[2] |
Lei Z, Han S, Bouferguène A, et al. Algorithm for mobile crane walking path planning in congested industrial plants[J]. Journal of Construction Engineering and Management, 2015, 141(2): 05014016.
|
[3] |
Safa M, Shahi A, Haas C T, et al. Supplier selection process in an integrated construction materials management model[J]. Automation in Construction, 2014, 48: 64-73.
|
[4] |
Tabrizi B H. Integrated planning of project scheduling and material procurement considering the environmental impacts[J]. Computers & Industrial Engineering, 2018, 120: 103-115.
|
[5] |
Zoraghi N, Shahsavar A, Niaki S T A. A hybrid project scheduling and material ordering problem: Modeling and solution algorithms[J]. Applied Soft Computing, 2017, 58: 700-713.
|
[6] |
Aquilano N J, Smith D E. A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning[J]. Journal of Operations Management, 1980, 1(2): 57-67.
|
[7] |
Smith-Daniels D E, Aquilano N J. Constrained resource project scheduling subject to material constraints[J]. Journal of Operations Management, 1984,4(4): 369-387.
|
[8] |
Dodin B, Elimam A A. Integrated project scheduling and material planning with variable activity duration and rewards[J]. IIE Transactions, 2001, 33(11): 1005-1018.
|
[9] |
Sheykh S M, Shadrokh S, Hasanzadeh F. Concurrent project scheduling and material planning: A genetic algorithm approach[J]. Transcation E: Industrial Engineering, 2009, 16(2): 91-99.
|
[10] |
Fu F. Integrated scheduling and batch ordering for construction project[J]. Applied Mathematical Modelling, 2014, 38(2): 784-797.
|
[11] |
Kazemi S, Davari-Ardakani H. Integrated resource leveling and material procurement with variable execution intensities[J]. Computers & Industrial Engineering, 2020, 148: 106673.
|
[12] |
Habibi F, Barzinpour F, Sadjadi S J. A mathematical model for project scheduling and material ordering problem with sustainability considerations: A case study in Iran[J]. Computers & Industrial Engineering, 2019, 128: 690-710.
|
[13] |
Asadujjaman M, Rahman H F, Chakrabortty R K, et al. Resource constrained project scheduling and material ordering problem with discounted cash flows[J]. Computers & Industrial Engineering, 2021, 158: 107427.
|
[14] |
Zhang Y, Cui N, Hu X, et al. Robust project scheduling integrated with materials ordering under activity duration uncertainty[J]. Journal of the Operational Research Society, 2020, 71(10): 1581-1592.
|
[15] |
Tabrizi B H, Ghaderi S F. A robust bi-objective model for concurrent planning of project scheduling and material procurement[J]. Computers & Industrial Engineering, 2016, 98: 11-29.
|
[16] |
Ronen B, Trietsch D. Optimal scheduling of purchasing orders for large projects[J]. European Journal of Operational Research, 1993, 68(2): 185-195.
|
[17] |
Yeo K T, Ning J H. Managing uncertainty in major equipment procurement in engineering projects[J]. European Journal of Operational Research, 2006, 171(1): 123-134.
|
[18] |
卢辉, 王红卫, 李锋, 等. 考虑供应不确定性与需求非平稳性的项目调度与材料供应集成优化[J]. 系统工程理论与实践, 2019, 39(3): 647-658.
|
|
Lu H, Wang H W, Li F, et al. Integrated scheduling and material supply planning under nonstationary stochastic demand and random supply yield[J].Systems Engineering-Theory & Practice, 2019, 39(3): 647- 658.
|
[19] |
Zhang Y, Cui N. Project scheduling and material ordering problem with storage space constraints[J]. Automation in Construction, 2021, 129: 103796.
|
[20] |
Ren Z, Anumba C J, Tah J. RFID-facilitated construction materials management (RFID-CMM)-A case study of water-supply project[J]. Advanced Engineering Informatics, 2011, 25(2): 198-207.
|
[21] |
Artigues C, Leus R, Talla Nobibon F. Robust optimization for resource-constrained project scheduling with uncertain activity durations[J]. Flexible Services and Manufacturing Journal, 2013, 25(1): 175-205.
|
[22] |
Hartmann S. A competitive genetic algorithm for resource-constrained project scheduling[J].Naval Research Logistics (NRL), 1998, 45(7): 733-750.
|
[23] |
Alcaraz J, Maroto C. A robust genetic algorithm for resource allocation in project scheduling[J]. Annals of Operations Research, 2001, 102(1): 83-109..
|
[24] |
Kolisch R, Sprecher A, Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems[J]. Management Science, 1995, 41(10): 1693-1703.
|
[25] |
Kolisch R, Sprecher A. PSPLIB - a project scheduling problem library OR software - ORSEP operations research software exchange program[J]. European Journal of Operational Research, 1997, 96(1): 205-216.
|
[26] |
Taguchi G. The system of experimental design [M]. New York:UNIPUB/Krauss International, 1987.
|