[1] Goldratt E M. Critical chain:A business novel[M]. Great Barrington, MA:North River Press, 1997.[2] Newblod R C. Project management in the fast lane-applying the theory of constraints[M]. Boca Raton:The S t. Lucie Press, 1998.[3] Trietsch D. The effect of systemic errors on optimal project buffers[J].International Journal of Project Management, 2005, 23(4):267-274.[4] Tukel O I, Rom W O, Eksioglu S D. An investigation of buffer sizing techniques in critical chain scheduling[J]. European Journal of Operational Research, 2006, 172(2):401-416.[5] Zhang Junguang, Song Xiwei, Díaz E. Project buffer sizing of a critical chain based on comprehensive resource tightness[J]. European Journal of Operational Research, 2016, 248(1):174-182.[6] Zhang Junguang, Song Xiwei, Diaz E. Buffer sizing of critical chain based on attribute optimization[J]. Concurrent Engineering, 2014, 22(3):253-264.[7] Herroelen W S, Leus R. On the merits and pitfalls of critical chain scheduling[J]. Journal of Operations Management, 2001, 19(5):559-577.[8] 万伟, 蔡晨, 王长峰. 在单资源约束项目中的关键链管理[J]. 中国管理科学, 2003, 11(2):70-75.[9] 褚春超. 缓冲估计与关键链项目管理[J]. 计算机集成制造系统, 2008, 14(5):1029-1035.[10] Leach L P. Critical chain project management[M]. Massachusetts:Artech House, 2014.[11] 别黎, 崔南方. 关键链动态缓冲监控方法研究[J]. 中国管理科学, 2010, 18(6):97-103.[12] Kuo T C, Chang S H, Huang S N. Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory[J]. Expert Systems with Applications, 2009, 36(2):1783-1792.[13] Bevilacqua M, Ciarapica F E, Giacchetta G. Critical chain and risk analysis applied to high-risk industry maintenance:A case study[J]. International Journal of Project Management, 2009, 27(4):419-432.[14] 别黎, 崔南方, 田文迪,等. 基于活动敏感性的动态缓冲监控方法研究[J]. 中国管理科学, 2014, 22(10):113-121.[15] 别黎. 关键链项目管理中缓冲估计与监控方法研究[D].武汉:华中科技大学,2012.[16] Hu Xuejun, Cui Nanfang, Demeulemeester E, et al. Incorporation of activity sensitivity measures into buffer management to manage project schedule risk[J]. European Journal of Operational Research, 2016, 249(2):717-727.[17] 杨双. 基于缓冲的软件项目进度监控方法研究[D].北京:北京科技大学,2013.[18] 蔡晨, 万伟. 基于PERT/CPM的关键链管理[J]. 中国管理科学, 2003, 11(6):35-39.[19] 张俊光, 沈佳佳, 杨双. 基于缓冲的软件项目工作量估算模型研究[J]. 管理工程学报, 2015, 29(04):171-177.[20] Zhang Junguang, Shi Ruixia, Diaz E. Dynamic monitoring and control of software project effort based on an effort buffer[J]. Journal of the Operational Research Society, 2015, 66(9):1555-1565.[21] Vanhoucke M. On the dynamic use of project performance and schedule risk information during project tracking[J]. Omega, 2011, 39(4):416-426.[22] Yuan K J, Chang S H, Li R K. Enhancement of theory of constraints replenishment using a novel generic buffer management procedure[J]. International journal of production research, 2003, 41(4):725-740.[23] Wu H H, Chen C P, Tsai C H, et al. A study of an enhanced simulation model for TOC supply chain replenishment system under capacity constraint[J]. Expert Systems with Applications, 2010, 37(9):6435-6440.[24] Simatupang T M, Wright A C, Sridharan R. Applying the theory of constraints to supply chain collaboration[J]. Supply chain Management:an international journal, 2004, 9(1):57-70.[25] Watson K J, Blackstone J H, Gardiner S C. The evolution of a management philosophy:The theory of constraints[J]. Journal of operations Management, 2007, 25(2):387-402. |