[1] Locatelli G, Mancini M. Risk management in a mega-project: The Universal EXPO 2015 case[J]. International Journal of Project Organisation and Management, 2010, 2(3): 236-253. [2] Osipova E, Eriksson P E. Balancing control and flexibility in joint risk management: Lessons learned from two construction projects[J]. International Journal of Project Management, 2013, 31(3): 391-399. [3] 李正林. 三战伶仃洋——港珠澳大桥海底隧道E15沉管安装纪实[J]. 建筑, 2015(19): 13-15.Li Zhenglin. The three battles of lingdingyang—the installation of E15 immersed pipe of the Hong Kong-Zhuhai-Macao Bridge[J]. Construction and Architecture, 2015(19): 13-15. [4] Raviv A. The design of an optimal insurance policy[J]. The American Economic Review, 1979, 69(1): 84-96. [5] Guo F, Chang-Richards Y, Wilkinson S, et al. Effects of project governance structures on the management of risks in major infrastructure projects: A comparative analysis[J]. International Journal of Project Management, 2014, 32(5): 815-826. [6] Chang C Y. Risk-bearing capacity as a new dimension to the analysis of project governance[J]. International Journal of Project Management, 2015, 33(6): 1195-1205. [7] El-Adaway I H. Promoting the sustainability of relational contracting through addressing third party insurance obstacles[J]. Journal of Management in Engineering, 2012, 29(3): 216-223. [8] Ndekugri I, Daeche H, Zhou D. The project insurance option in infrastructure procurement[J]. Engineering, Construction and Architectural Management, 2013, 20(3): 267-289. [9] Zhao Z Y, Zuo J, Zillante G. Situation and competitiveness of foreign project management consultancy enterprises in China[J]. Journal of Management in Engineering, 2011, 27(4): 200-209. [10] Liu Junying, Li Bingguang, Lin Binshan, et al. Key issues and challenges of risk management and insurance in China’s construction industry: An empirical study[J]. Industrial Management & Data Systems, 2007, 107(3): 382-396. [11] Hosseinian S M, Carmichael D G. Optimal gainshare/painshare in alliance projects[J]. Journal of the Operational Research Society, 2013, 64(8): 1269-1278. [12] Hosseinian S M, Carmichael D G. Optimal incentive contract with risk-neutral contractor[J]. Journal of Construction Engineering and Management, 2012, 139(8): 899-909. [13] 陈勇强, 傅永程, 华冬冬. 基于多任务委托代理的业主与承包商激励模型[J]. 管理科学学报, 2016, 19(4):45-55.Chen Yongqiang, Fu Yongcheng, Hua Dongdong. A multi-task incentive model between the owner and contractor[J]. Journal of Management Science in China, 2016, 19(4):45-55. [14] 马力, 黄梦莹, 马美双. 契约显性激励与声誉隐性激励的比较研究——以建筑承包商为例[J]. 工业工程与管理, 2016, 21(2):156-162.Ma Li, Huang Mengying, Ma Meishuang. Research on contract’s explicit incentive and reputation’s implicit incentive mechanism towards construction contators[J]. Industrial Engineering and Management, 2016, 21(2):156-162. [15] 时茜茜, 朱建波, 盛昭瀚, 等. 基于双重声誉的重大工程工厂化预制动态激励机制[J]. 系统管理学报, 2017, 26(2): 338-345.Shi Qianqian, Zhu Jianbo, Sheng Zhaohan, et al. Dynamic incentive mechanism for suppliers of mega project considering double reputation[J]. Journal of Systems & Management, 2017, 26(2): 338-345. [16] Bower D, Ashby G, Gerald K, et al. Incentive mechanisms for project success[J]. Journal of Management in Engineering, 2002, 18(1): 37-43. [17] Bernheim B D, Whinston M D. Common agency[J]. Econometrica: Journal of the Econometric Society, 1986: 923-942. [18] Bernheim B D, Whinston M D. Common marketing agency as a device for facilitating collusion[J]. The RAND Journal of Economics, 1985: 269-281. [19] 骆品亮, 陆毅. 共同代理与独家代理的激励效率比较研究[J]. 管理科学学报, 2006, 9(1):47-53.Luo Pinliang, Lu Yi. Comparatives of incentive efficiency of common agency and exclusive dealing[J]. Journal of Management Science in China, 2006, 9(1):47-53. [20] 李杰. 委托监理机构从事工程保险技术服务的机制分析[J]. 保险研究, 2009(1): 66-69.Li Jie. Analysis on the mechanism of entrusting supervision institutions to engage in engineering insurance technical services[J].Insurance Studies, 2009(1): 66-69. [21] 陈其安, 刘艾萍, 李红强. 存在主次委托人条件下的委托-代理问题: 理论模型和实验研究[J]. 中国管理科学, 2015,23(4): 17.Chen Qi-an, Liu Aiping, Li Hongqiang. Principal-agent problem under the condition of existing primary and secondary principals: theoretical model and experiment research[J]. Chinese Journal of Management Science, 2015,23(4): 17. [22] Siqueira K, Sandler T, Cauley J. Common agency and state-owned enterprise reform[J]. China Economic Review, 2009, 20(2): 208-217. [23] Zhao X H, Cheng W C, Shen J S, et al. Platform collapse incident of a power plant in Jiangxi, China[J]. Natural Hazards, 2017, 87(2): 1259-1265. [24] Williamson O E. Markets and hierarchies: Analysis and antitrust implications: A study in the economics of internal organization[J]. Tamura Masanori Journal of economics and business administration, 1978, 138(6): 106-108. [25] Williamson O E. The economic institutions of capitalism. Firms, markets, relational contracting[M]//Das Summa Summarum des Management. Gabler, 2007: 61-75. [26] John G. An empirical investigation of some antecedents of opportunism in a marketing channel[J]. Journal of marketing Research, 1984, 21(3): 278-289. [27] Mohamed K A, Khoury S S, Hafez S M. Contractor’s decision for bid profit reduction within opportunistic bidding behavior of claims recovery[J]. International Journal of Project Management, 2011, 29(1): 93-107. [28] 程书萍, 葛秋东, 盛昭瀚, 等. 跟踪审计模式下大型工程合谋博弈分析[J]. 预测, 2012, 31(1): 34-38.Cheng Shuping, Ge Qiudong, Sheng Zhaohan, et al. A game analysis of the collusion in large construction projectunder follow-up audit pattern[J]. Forecasting, 2012, 31(1): 34-38. [29] 李真, 孟庆峰, 盛昭瀚. 工程施工团队中机会主义行为复杂性分析与计算实验[J]. 系统管理学报, 2017,26(3): 502-511.Li Zhen, Meng Qingfeng, Sheng Zhaohan. Complexity and computational experiment of opportunistic behavior in construction team[J]. Journal of Systems & Management, 2017,26(3): 502-511. [30] 尹贻林, 徐志超, 邱艳. 公共项目中承包商机会主义行为应对的演化博弈研究[J]. 土木工程学报, 2014,47(6):138-144.Yin Yilin, Xu Zhichao, Qiu Yan. Study on countermeasures to contractor’s opportunistic behaviorsin public project based on evolutionary game theory[J]. China Civil Engineering Journal, 2014,47(6):138-144. [31] Liu J, Gao R, Cheah C Y J, et al. Incentive mechanism for inhibiting investors' opportunistic behavior in PPP projects[J]. International Journal of Project Management, 2016, 34(7): 1102-1111. [32] Liu J, Gao R, Cheah C Y J, et al. Evolutionary game of investors’ opportunistic behaviour during the operational period in PPP projects[J]. Construction management and economics, 2017, 35(3): 137-153.
|