| [1] |
Liping Liu, Rui Wang, Shilei Sun, Xiaofeng Gan, Tijun Fan.
Transportation Network Optimization of Hazardous Chemicals Considering Risk Equity under Depot Disruptions
[J]. Chinese Journal of Management Science, 2026, 34(6): 66-76.
|
| [2] |
Yulong Li, Han Su, Guobin Wu.
The Construction and Optimization of a Drone Delivery System for Dual use of Usual and Emergency Situations
[J]. Chinese Journal of Management Science, 2026, 34(6): 133-145.
|
| [3] |
Songqing Guo, Zhe Xu, Yixuan Su.
Optimization of Multi Skill Project Group Scheduling Based on Global Idle Resource Reallocation
[J]. Chinese Journal of Management Science, 2026, 34(6): 187-201.
|
| [4] |
Yufeng Zhou, Zhibin Wu, Chuankai Xiang, Jiuping Xu.
A Collaborative Route Planning Model for Hiring and Crowdsourcing Vehicles with Split Delivery
[J]. Chinese Journal of Management Science, 2026, 34(2): 133-144.
|
| [5] |
Yukang He, Tao Jia, Weibo Zheng.
Decentralized Resource Allocation Based Multi-project Scheduling Optimization to Dynamically Balance Cash Flows
[J]. Chinese Journal of Management Science, 2026, 34(2): 144-155.
|
| [6] |
Zhe Xu, Weibao You, Song Zhao, Songqing Guo, Yixuan Su.
Robust Scheduling Optimization for the Distributed Resource-constrained Multi-project Scheduling Problem with Transfer time
[J]. Chinese Journal of Management Science, 2026, 34(2): 89-102.
|
| [7] |
Baofeng Tian, Jingwen Zhang, Lubo Li, Junjie Chen.
Integrated Resource-constrained Project Scheduling and Material Ordering Problem with Limited Storage Space
[J]. Chinese Journal of Management Science, 2025, 33(8): 144-155.
|
| [8] |
Xiao Cui, Zhengwen He, Nengmin Wang.
Optimization of Reactive Project Scheduling with Stochastic Resource Requirements Considering Information Handling Input
[J]. Chinese Journal of Management Science, 2025, 33(8): 218-229.
|
| [9] |
Wuliang Peng, Xuejun Lin.
A Dynamic Reactive Scheduling Method for the Resource Constrained Project Scheduling Problem
[J]. Chinese Journal of Management Science, 2025, 33(7): 200-209.
|
| [10] |
Sha Tao, Jing Jin, Jing Zhou.
The Integrated Optimization Project Scheduling and Personnel Assignment Considering Online-Onsite Collaboration
[J]. Chinese Journal of Management Science, 2025, 33(6): 85-95.
|
| [11] |
Song Xue, Xu Chen, Chao Li, Jingchun Feng.
Research on Miniature Multi-Project Scheduling of Service Project Enterprises Considering the Evolution of Human Resources Skills
[J]. Chinese Journal of Management Science, 2025, 33(6): 96-104.
|
| [12] |
Lili Zhang, Zhengrui Chen, Yang Yang, Shi Dan.
One-to-many “Personnel-task” Assignment Method for Maintenance Project of Hazardous Chemicals Production Equipment Considering Complexity
[J]. Chinese Journal of Management Science, 2025, 33(4): 175-184.
|
| [13] |
Yanting Wang, Weibo Zheng, Zhiqiang Ma, Zhengwen He.
Robustness Threshold-based Max-NPV Project Scheduling Optimization on Different Clients’ Payment Modes
[J]. Chinese Journal of Management Science, 2025, 33(4): 185-196.
|
| [14] |
Keyi Zhang, Yong Shi, Haixiang Guo, Yongzheng Sun.
Optimal Decision-Making for Dispatching Emergency Supplies for Natural Disasters in Mountainous Areas Based on Truck-Drone Collaboration
[J]. Chinese Journal of Management Science, 2025, 33(2): 150-160.
|
| [15] |
Hua He, Zhengwen He, Fangfang Cao, Nengmin Wang.
Max-NPV Multi-project Scheduling Optimization under Dual Resource Constraints
[J]. Chinese Journal of Management Science, 2025, 33(12): 146-159.
|