| [1] |
Van de Vonder S, Demeulemeester E, Herroelen W. Proactive heuristic procedures for robust project scheduling: An experimental analysis[J]. European Journal of Operational Research, 2008, 189(3): 723-733.
|
| [2] |
郭武山. 南水北调中线水源工程投资计划与管理[J]. 人民长江, 2015, 46(6): 28-30.
|
|
Guo W S. Investment plan and management of water sources project for Middle Route Project of South to North Water Diversion[J]. Yangtze River, 2015, 46(6): 28-30.
|
| [3] |
Yang I T, Chang C Y. Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding[J]. International Journal of Project Management,2005, 23(7): 546-553.
|
| [4] |
Cao Q, Zou X, Zhang L. Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules[J]. Journal of Construction Engineering and Management,2022,148(9): 04022099.
|
| [5] |
Tokdemir O B, Erol H, Dikmen I. Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation[J]. Journal of Construction Engineering and Management, 2019, 145(2): 04018132.
|
| [6] |
Katsuragawa C M, Lucko G, Isaac S, et al. Fuzzy linear and repetitive scheduling for construction projects[J]. Journal of Construction Engineering and Management, 2021, 147(3): 04021002.
|
| [7] |
Arabpour Roghabadi M, Moselhi O. Optimized crew selection for scheduling of repetitive projects[J]. Engineering, Construction and Architectural Management, 2021, 28(6): 1517-1540.
|
| [8] |
张玲, 王晶, 黄钧. 不确定需求下应急资源配置的鲁棒优化方法[J]. 系统科学与数学, 2010, 30(10): 1283-1292.
|
|
Zhang L, Wang J, Huang J. Robust optimal resource allocation model for uncertain demands[J]. Journal of Systems Science and Mathematical Sciences, 2010, 30(10): 1283-1292.
|
| [9] |
胡雪君, 赵雁, 单汩源, 等. 基于自适应大邻域搜索的鲁棒多项目调度方法[J]. 中国管理科学, 2022, 30(9): 217-231.
|
|
Hu X J, Zhao Y, Shan G Y, et al. An adaptive large neighborhood search metaheuristic for robust multi-project scheduling[J]. Chinese Journal of Management Science, 2022, 30(9): 217-231.
|
| [10] |
Van de Vonder S, Demeulemeester E, Herroelen W, et al. The use of buffers in project management: The trade-off between stability and makespan[J]. International Journal of Production Economics, 2005, 97(2): 227-240.
|
| [11] |
Salama T, Salah A, Moselhi O. Integration of linear scheduling method and the critical chain project management[J]. Canadian Journal of Civil Engineering, 2018, 45(1): 30-40.
|
| [12] |
Salama T, Moselhi O. Multi-objective optimization for repetitive scheduling under uncertainty[J]. Engineering, Construction and Architectural Management, 2019, 26(7): 1294-1320.
|
| [13] |
Zhang L, Dai G, Zou X, et al. Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty[J]. Engineering, Construction and Architectural Management, 2020, 27(10): 3095-3113.
|
| [14] |
Bertsimas D, Sim M. The price of robustness[J]. Operations Research, 2004, 52(1): 35-53.
|
| [15] |
Yamashita D S, Armentano V A, Laguna M. Robust optimization models for project scheduling with resource availability cost[J]. Journal of Scheduling, 2007, 10(1): 67-76.
|
| [16] |
Cohen I, Golany B, Shtub A. The stochastic time–cost tradeoff problem: A robust optimization approach[J]. Networks, 2007, 49(2): 175-188.
|
| [17] |
Hazır Ö, Erel E, Günalay Y. Robust optimization models for the discrete time/cost trade-off problem[J]. International Journal of Production Economics, 2011, 130(1): 87-95.
|
| [18] |
Artigues C, Leus R, Talla Nobibon F. Robust optimization for resource-constrained project scheduling with uncertain activity durations[J]. Flexible Services and Manufacturing Journal, 2013, 25(1-2): 175-205.
|
| [19] |
Bruni M E, Di Puglia Pugliese L, Beraldi P, et al. An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations[J]. Omega, 2017, 71: 66-84.
|
| [20] |
Balouka N, Cohen I. A robust optimization approach for the multi-mode resource-constrained project scheduling problem[J]. European Journal of Operational Research, 2021, 291(2): 457-470.
|
| [21] |
Zhang Y, Cui N, Hu X, et al. Robust project scheduling integrated with materials ordering under activity duration uncertainty[J]. Journal of the Operational Research Society, 2020, 71(10): 1581-1592.
|
| [22] |
Fu F, Liu Q, Yu G. Robustifying the resource-constrained project scheduling against uncertain durations[J]. Expert Systems with Applications, 2024, 238: 122002.
|
| [23] |
Bruni M E, Hazır Ö. A risk-averse distributionally robust project scheduling model to address payment delays[J]. European Journal of Operational Research, 2024, 318(2): 398-407.
|
| [24] |
Bendotti P, Brunod Indrigo L, Chrétienne P, et al. Anchor-robust project scheduling with non-availability periods[J]. Discrete Optimization, 2024, 54: 100864.
|
| [25] |
Koster A M C A, Segschneider J, Ventsch N. Γ-robust optimization of project scheduling problems[J]. Computers & Operations Research, 2024, 161: 106453.
|
| [26] |
Zolfaghar Dolabi H R, Afshar A, Abbasnia R. CPM/LOB scheduling method for project deadline constraint satisfaction[J]. Automation in Construction, 2014, 48: 107-118.
|
| [27] |
刘一欣, 郭力, 王成山. 微电网两阶段鲁棒优化经济调度方法[J]. 中国电机工程学报, 2018, 38(14): 4013-4022+4307.
|
|
Liu Y X, Guo L, Wang C S. Economic dispatch of microgrid based on two stage robust optimization[J]. Proceedings of the CSEE, 2018, 38(14): 4013-4022+4307.
|
| [28] |
Bertsimas D, Sim M. Robust discrete optimization and network flows[J]. Mathematical Programming, 2003, 98(1-3): 49-71.
|
| [29] |
Wei C, Li Y, Cai X. Robust optimal policies of production and inventory with uncertain returns and demand[J]. International Journal of Production Economics, 2011, 134(2): 357-367.
|
| [30] |
Damci A, Arditi D, Polat G. Resource leveling in line-of-balance scheduling[J]. Computer-Aided Civil and Infrastructure Engineering, 2013, 28(9): 679-692.
|
| [31] |
崔晓, 何正文, 王能民. 考虑信息处理投入的随机资源需求反应性项目调度优化[J]. 中国管理科学, 2025, 33(8): 218-229.
|
|
Cui X, He Z W, Wang N M. Optimization of reactive project scheduling with stochastic resource requirements considering information handling input[J]. Chinese Journal of Management Science,2025,33(8): 218-229.
|
| [32] |
Ben-Tal A, El Ghaoui L, Nemirovski A. Robust Optimization[M]. Princeton: Princeton University Press, 2009.
|
| [33] |
Hyari K H, El-Rayes K, El-Mashaleh M. Automated trade-off between time and cost in planning repetitive construction projects[J]. Construction Management and Economics, 2009, 27(8): 749-761.
|