1 |
Chaudhry I A, Khan A A. A research survey: Review of flexible job shop scheduling techniques[J]. International Transactions in Operational Research, 2016, 23(3): 551-591.
|
2 |
Kress D, Müller D, Nossack J. A worker constrained flexible job shop scheduling problem with sequence-dependent setup times[J]. OR Spectrum, 2019, 41(1): 179-217.
|
3 |
仇永涛. 离散智能车间扰动预测与高效运行管控方法研究[D]. 无锡:江南大学, 2020.
|
|
Qiu Y T. Research on disturbance prediction and efficientoperation control of intelligent job shop[D]. Wuxi: Jiangnan University, 2020.
|
4 |
Dai M, Tang D B, Giret A, et al. Multi-objective optimization for energy-efficient flexible job shop scheduling problem with transportation constraints[J]. Robotics and Computer-Integrated Manufacturing,2019,59: 143-157.
|
5 |
Zhang G H, Hu Y F, Sun J H, et al. An improved genetic algorithm for the flexible job shop scheduling problem with multiple time constraints[J]. Swarm and Evolutionary Computation, 2020, 54: 100664.
|
6 |
陈勇, 王昊天, 易文超, 等. 基于元胞机与强化学习的多扰动车间调度算法[J]. 计算机集成制造系统, 2021,27(12):3536-3549.
|
|
Chen Y, Wang H T, Yi W C, et al. Algorithm of scheduling for multi-disturbance job-shop based oncellular automata and reinforcement learning[J]. Computer Integrated Manufacturing Systems, 2021,27(12):3536-3549.
|
7 |
刘雪红, 段程, 王磊. 基于改进候鸟算法的柔性作业车间分批调度问题[J]. 计算机集成制造系统, 2021,27(11):3185-3195.
|
|
Liu X H, Duan C, Wang L. Flexible job shop scheduling with lot streaming based on improvedmigrating birds optimization algorithm[J]. Computer Integrated Manufacturing Systems, 2021,27(11):3185-3195.
|
8 |
Zheng X L, Wang L. A knowledge-guided fruit fly optimization algorithm for dual resource constrained flexible job-shop scheduling problem[J]. International Journal of Production Research, 2016, 54(18): 5554-5566.
|
9 |
Frihat M B, Hadj-Alouane A, Sadfi C. Optimization of the integrated problem of employee timetabling and job shop scheduling[J]. Computers & Operations Research, 2022, 137: 105332.
|
10 |
Lei D M, Guo X P. Variable neighbourhood search for dual-resource constrained flexible job shop scheduling[J]. International Journal of Production Research, 2014, 52(9): 2519-2529.
|
11 |
Gong G L, Chiong R, Deng Q W, et al. Energy-efficient flexible flow shop scheduling with worker flexibility[J]. Expert Systems with Applications, 2020, 141: 112902.
|
12 |
Luo Q, Deng Q W, Gong G L, et al. An efficient memetic algorithm for distributed flexible job shop scheduling problem with transfers[J]. Expert Systems with Applications, 2020, 160: 113721.
|
13 |
刘强. 复杂产品总装生产线资源配置优化研究[D]. 北京:北京化工大学, 2020.
|
|
Liu Q. Research on resource allocation optimization of complex product assembly line[D]. Beijing: Beijing University of Chemical Technology, 2020.
|
14 |
Defersha F M, Rooyani D. An efficient two-stage genetic algorithm for a flexible job-shop scheduling problem with sequence dependent attached/detached setup, machine release date and lag-time[J]. Computers & Industrial Engineering, 2020, 147: 106605.
|
15 |
Zhang F F, Mei Y, Nguyen S, et al. Evolving scheduling heuristics via genetic programming with feature selection in dynamic flexible job-shop scheduling[J]. IEEE Transactions on Cybernetics, 2021, 51(4): 1797-1811.
|
16 |
Chen R H, Yang B, Li S, et al. A self-learning genetic algorithm based on reinforcement learning for flexible job-shop scheduling problem[J]. Computers & Industrial Engineering, 2020, 149: 106778.
|
17 |
顾九春, 姜天华, 朱惠琦. 多目标离散灰狼优化算法求解作业车间节能调度问题[J]. 计算机集成制造系统, 2021,27(8):2295-2306.
|
|
Gu J C, Jiang T H, Zhu H Q. Energy-saving job shop scheduling problem with multi-objective discrete grey wolf optimization algorithm[J].Computer Integrated Manufacturing Systems, 2021,27(8):2295-2306.
|
18 |
Gong G L, Chiong R, Deng Q W, et al. A hybrid artificial bee colony algorithm for flexible job shop scheduling with worker flexibility[J]. International Journal of Production Research, 2020, 58(14): 4406-4420.
|
19 |
Li Y B, Huang W X, Wu R, et al. An improved artificial bee colony algorithm for solving multi-objective low-carbon flexible job shop scheduling problem[J]. Applied Soft Computing, 2020, 95: 106544.
|
20 |
Gao D, Wang G G, Pedrycz W. Solving fuzzy job-shop scheduling problem using de algorithm improved by a selection mechanism[J]. IEEE Transactions on Fuzzy Systems, 2020, 28(12): 3265-3275.
|
21 |
An Y J, Chen X H, Li Y H, et al. An improved non-dominated sorting biogeography-based optimization algorithm for the (hybrid) multi-objective flexible job-shop scheduling problem[J]. Applied Soft Computing, 2021, 99: 106869.
|
22 |
Ding H J, Gu X S. Improved particle swarm optimization algorithm based novel encoding and decoding schemes for flexible job shop scheduling problem[J]. Computers & Operations Research,2020,121: 104951.
|
23 |
Caldeira R H, Gnanavelbabu A. A Pareto based discrete Jaya algorithm for multi-objective flexible job shop scheduling problem[J]. Expert Systems with Applications, 2021, 170: 114567.
|
24 |
Wang X Z, Wang B, Zhang X X, et al. Two-objective robust job-shop scheduling with two problem-specific neighborhood structures[J]. Swarm and Evolutionary Computation, 2021, 61: 100805.
|
25 |
Akbar M, Irohara T. NSGA-II variants for solving a social-conscious dual resource-constrained scheduling problem[J]. Expert Systems with Applications, 2020, 162: 113754.
|
26 |
Tan W H, Yuan X F, Wang J L, et al. A fatigue-conscious dual resource constrained flexible job shop scheduling problem by enhanced NSGA-II: An application from casting workshop[J]. Computers & Industrial Engineering, 2021, 160: 107557.
|
27 |
徐小峰, 林姿汝, 周鹏. 多油品供给受限下多油库被动配送车辆路径问题研究[J]. 中国管理科学, 2021, 29(5): 157-165.
|
|
Xu X F, Lin Z R, Zhou P. Research on vehicle routing problem of multiple oil depot passive distribution undermulti oil supply constraints[J].Chinese Journal of Management Science, 2021, 29(5): 157-165.
|