Chinese Journal of Management Science ›› 2025, Vol. 33 ›› Issue (4): 185-196.doi: 10.16381/j.cnki.issn1003-207x.2022.0306
Previous Articles Next Articles
Yanting Wang1, Weibo Zheng2(
), Zhiqiang Ma3, Zhengwen He2,4
Received:2022-02-19
Revised:2022-05-11
Online:2025-04-25
Published:2025-04-29
Contact:
Weibo Zheng
E-mail:zhengweb@mail.xjtu.edu.cn
CLC Number:
Yanting Wang,Weibo Zheng,Zhiqiang Ma, et al. Robustness Threshold-based Max-NPV Project Scheduling Optimization on Different Clients’ Payment Modes[J]. Chinese Journal of Management Science, 2025, 33(4): 185-196.
"
| 参数 | 取值 |
|---|---|
| 基本算例参数 | |
| 非虚活动数n | 10,20,40,60 |
| 起始和终止活动数 | 随机地从1,2和3中选取 |
| 最大紧前和紧后活动数 | 3 |
| 可更新资源种类K | 2 |
| 资源需求量rik | 随机地从均匀分布U[ |
| 活动工期均值 | 随机地从均匀分布U[ |
| 活动工期标准差σ(di ) | 随机地从均匀分布U[ |
| 活动基本成本ci | 随机地从均匀分布U[ |
| 活动挣值vi | ρci,ρ随机地从均匀分布U[ |
| 活动i权重wi | 由三角分布 |
| 关键敏感性参数 | |
| 支付次数F | 3, 5, 7, 9和11 |
| 项目截止日期D | |
| 折现率 | 0.0040, 0.0050, 0.0060, 0.0070和0.0080 |
| 支付比例 | 0.1, 0.3, 0.5, 0.7和0.9 |
| 单位时间缓冲成本 | |
| 鲁棒性阈值系数 | 0.0, 0.2, 0.4, 0.6和0.8 |
"
| 支付方式 | N | TS | VNS | MSII | RG | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ARD | MRD | CV | ACT | MCT | ARD | MRD | CV | ACT | MCT | ARD | MRD | CV | ACT | MCT | ARD | MRD | CV | ACT | MCT | ||
| 里程碑型 | 10 | 0.03 | 0.12 | 0.05 | 0.08 | 0.10 | 0.03 | 0.08 | 0.06 | 0.10 | 0.11 | 0.12 | 0.26 | 0.03 | 0.07 | 0.09 | 0.10 | 0.21 | 0.06 | 0.09 | 0.13 |
| 20 | 0.03 | 0.12 | 0.04 | 0.35 | 0.45 | 0.06 | 0.18 | 0.04 | 0.48 | 0.56 | 0.16 | 0.26 | 0.08 | 0.34 | 0.41 | 0.18 | 0.34 | 0.11 | 0.35 | 0.51 | |
| 40 | 0.01 | 0.04 | 0.02 | 2.33 | 2.75 | 0.15 | 0.20 | 0.05 | 3.34 | 4.05 | 0.31 | 0.94 | 0.29 | 2.23 | 2.61 | 0.48 | 1.17 | 0.38 | 1.92 | 2.07 | |
| 60 | 0.01 | 0.04 | 0.01 | 6.13 | 6.81 | 0.11 | 0.20 | 0.04 | 9.94 | 11.3 | 0.32 | 0.73 | 0.28 | 6.01 | 6.64 | 0.58 | 1.12 | 0.40 | 5.32 | 5.50 | |
| avg. | 0.02 | 0.08 | 0.03 | 2.22 | 2.52 | 0.09 | 0.17 | 0.05 | 3.47 | 4.01 | 0.23 | 0.54 | 0.17 | 2.16 | 2.44 | 0.33 | 0.71 | 0.24 | 1.92 | 2.05 | |
| 时间型 | 10 | 0.07 | 0.18 | 0.07 | 0.08 | 0.11 | 0.01 | 0.09 | 0.08 | 0.10 | 0.12 | 0.13 | 0.29 | 0.03 | 0.07 | 0.09 | 0.05 | 0.17 | 0.05 | 0.08 | 0.09 |
| 20 | 0.04 | 0.11 | 0.05 | 0.33 | 0.40 | 0.04 | 0.20 | 0.05 | 0.48 | 0.55 | 0.16 | 0.25 | 0.06 | 0.31 | 0.37 | 0.15 | 0.30 | 0.07 | 0.32 | 0.40 | |
| 40 | 0.01 | 0.07 | 0.02 | 2.67 | 3.51 | 0.15 | 0.25 | 0.05 | 3.30 | 4.66 | 0.17 | 0.58 | 0.18 | 2.00 | 2.16 | 0.43 | 1.13 | 0.31 | 1.80 | 1.95 | |
| 60 | 0.00 | 0.01 | 0.00 | 6.16 | 6.61 | 0.14 | 0.22 | 0.05 | 9.79 | 10.98 | 0.20 | 0.41 | 0.16 | 5.65 | 5.98 | 0.50 | 0.86 | 0.27 | 5.01 | 5.45 | |
| avg. | 0.03 | 0.09 | 0.04 | 2.31 | 2.66 | 0.09 | 0.19 | 0.06 | 3.42 | 4.08 | 0.17 | 0.38 | 0.11 | 2.00 | 2.15 | 0.28 | 0.62 | 0.17 | 1.80 | 1.97 | |
| 进展型 | 10 | 0.05 | 0.16 | 0.06 | 0.08 | 0.12 | 0.02 | 0.09 | 0.05 | 0.10 | 0.11 | 0.13 | 0.22 | 0.03 | 0.07 | 0.09 | 0.06 | 0.12 | 0.03 | 0.07 | 0.09 |
| 20 | 0.03 | 0.11 | 0.04 | 0.35 | 0.41 | 0.06 | 0.24 | 0.04 | 0.43 | 0.60 | 0.14 | 0.20 | 0.09 | 0.33 | 0.39 | 0.14 | 0.30 | 0.09 | 0.32 | 0.38 | |
| 40 | 0.01 | 0.05 | 0.02 | 2.66 | 3.75 | 0.14 | 0.24 | 0.05 | 3.17 | 4.21 | 0.14 | 0.38 | 0.14 | 2.22 | 2.37 | 0.33 | 0.88 | 0.25 | 2.00 | 2.17 | |
| 60 | 0.00 | 0.00 | 0.00 | 6.87 | 7.40 | 0.11 | 0.17 | 0.03 | 9.93 | 10.62 | 0.19 | 0.39 | 0.15 | 6.40 | 6.70 | 0.38 | 0.66 | 0.21 | 5.72 | 5.98 | |
| avg. | 0.02 | 0.08 | 0.03 | 2.49 | 2.92 | 0.08 | 0.19 | 0.04 | 3.41 | 3.88 | 0.15 | 0.30 | 0.10 | 2.26 | 2.39 | 0.23 | 0.49 | 0.15 | 2.03 | 2.15 | |
| 费用型 | 10 | 0.05 | 0.13 | 0.05 | 0.08 | 0.10 | 0.02 | 0.14 | 0.08 | 0.10 | 0.13 | 0.12 | 0.25 | 0.04 | 0.08 | 0.09 | 0.06 | 0.16 | 0.05 | 0.08 | 0.09 |
| 20 | 0.03 | 0.08 | 0.03 | 0.38 | 0.45 | 0.05 | 0.17 | 0.05 | 0.48 | 0.59 | 0.12 | 0.18 | 0.07 | 0.36 | 0.43 | 0.13 | 0.24 | 0.06 | 0.36 | 0.43 | |
| 40 | 0.03 | 0.16 | 0.06 | 2.64 | 2.84 | 0.13 | 0.23 | 0.04 | 3.18 | 3.74 | 0.14 | 0.33 | 0.13 | 2.40 | 2.60 | 0.33 | 0.89 | 0.25 | 2.17 | 2.36 | |
| 60 | 0.01 | 0.06 | 0.02 | 7.45 | 7.78 | 0.11 | 0.14 | 0.03 | 10.26 | 11.87 | 0.19 | 0.43 | 0.15 | 7.07 | 7.54 | 0.38 | 0.72 | 0.22 | 6.33 | 6.52 | |
| avg. | 0.03 | 0.11 | 0.04 | 2.64 | 2.79 | 0.08 | 0.17 | 0.05 | 3.50 | 4.08 | 0.14 | 0.30 | 0.10 | 2.48 | 2.67 | 0.23 | 0.50 | 0.15 | 2.23 | 2.35 | |
"
| 参数 | 数值 | 里程碑型支付 | 时间型支付 | 进展型支付 | 费用型支付 | 参数 | 数值 | 里程碑型支付 | 时间型支付 | 进展型支付 | 费用型支付 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| NPV | NPV | NPV | NPV | NPV | NPV | NPV | NPV | ||||
| F | 3 | 212.41 | 234.26 | 264.95 | 261.77 | 0.1 | 112.69 | 106.25 | 179.58 | 167.01 | |
| 5 | 222.19 | 244.31 | 293.44 | 292.54 | 0.3 | 143.60 | 141.56 | 227.15 | 213.56 | ||
| 7 | 245.04 | 258.65 | 329.03 | 311.61 | 0.5 | 181.65 | 184.64 | 257.08 | 242.34 | ||
| 9 | 259.04 | 262.83 | 347.08 | 334.83 | 0.7 | 202.95 | 208.45 | 268.03 | 252.52 | ||
| 11 | 268.86 | 272.39 | 359.61 | 346.74 | 0.9 | 225.98 | 232.53 | 277.07 | 260.21 | ||
| nd | 1.1 | 238.76 | 246.33 | 281.38 | 269.99 | 0.004 | 235.72 | 232.93 | 286.63 | 274.77 | |
| 1.2 | 234.37 | 248.22 | 299.01 | 292.74 | 0.005 | 200.47 | 200.97 | 259.80 | 247.22 | ||
| 1.3 | 243.19 | 249.30 | 303.26 | 305.76 | 0.006 | 171.23 | 174.32 | 235.96 | 224.19 | ||
| 1.4 | 226.02 | 236.35 | 286.32 | 277.16 | 0.007 | 147.13 | 152.31 | 215.57 | 204.22 | ||
| 1.5 | 147.60 | 146.20 | 203.43 | 182.33 | 0.008 | 127.77 | 133.76 | 197.94 | 186.52 | ||
| nr | 0.1 | 286.06 | 292.88 | 365.37 | 364.90 | 0 | 178.14 | 180.75 | 242.52 | 229.93 | |
| 0.3 | 218.42 | 224.75 | 293.10 | 285.58 | 0.2 | 178.31 | 180.75 | 242.50 | 229.90 | ||
| 0.5 | 163.22 | 164.90 | 229.30 | 214.76 | 0.4 | 178.18 | 180.76 | 242.47 | 229.84 | ||
| 0.7 | 122.44 | 120.82 | 174.23 | 155.12 | 0.6 | 176.58 | 179.31 | 239.07 | 227.72 | ||
| 0.9 | 92.18 | 90.92 | 133.88 | 116.56 | 0.8 | 171.10 | 172.71 | 229.32 | 219.52 |
| 1 | 何正文, 徐渝, 朱少英. Max-npv项目进度问题研究评述[J]. 管理工程学报, 2005,19(4):60-63. |
| He Z W, Xu Y, Zhu S Y. A survey of max-npv project scheduling problems[J]. Journal of Industrial Engineering and Engineering Management, 2005,19(4):60-63. | |
| 2 | Russell A H. Cash flows in networks[J]. Management Science, 1970, 16(5):357-373. |
| 3 | Sobel M J, Szmerekovsky J G, Tilson V. Scheduling projects with stochastic activity duration to maximize expected net present value[J]. European Journal of Operational Research, 2009, 198(3):697-705. |
| 4 | Creemers S, Leus R, Lambrecht M. Scheduling markovian PERT networks to maximize the net present value[J]. Operations Research Letters, 2010, 38(1):51-56. |
| 5 | Wiesemann W, Kuhn D, Rustem B. Maximizing the net present value of a project under uncertainty[J]. European Journal of Operational Research, 2010, 202(2):356-367. |
| 6 | Hanafizadeh P, Latif V. Robust net present value[J]. Mathematical and Computer Modelling, 2011, 54(1):233-242. |
| 7 | 崔南方, 梁洋洋, 赵雁. 考虑鲁棒性的Max-npv项目调度问题[J]. 系统工程理论与实践, 2016, 36(6):1462-1471. |
| Cui N F, Liang Y Y, Zhao Y. Max-npv project scheduling problem considering robustness[J]. Systems Engineering-Theory & Practice, 2016, 36(6):1462-1471. | |
| 8 | 陶莎,盛昭瀚,朱建波.交互作用不确定下的项目组合选择鲁棒决策[J].中国管理科学,2017,25(4):190-196. |
| Tao S, Sheng Z H, Zhu J B, Robust decision-making of project portfolio selection with uncertain project interactions[J].Chinese Journal of Management Science, 2017,25(4):190-196. | |
| 9 | Creemers S. Maximizing the expected net present value of a project with phase-type distributed activity durations: An efficient globally optimal solution procedure[J]. European Journal of Operational Research, 2018, 267(1):16-22. |
| 10 | Zheng W B, He Z W, Wang N M, et al. Proactive and reactive resource-constrained max-npv project scheduling with random activity duration[J]. Journal of the Operational Research Society, 2018, 69(1):115-126. |
| 11 | Liang Y Y, Cui N F, Wang T, et al. Robust resource-constrained max-npv project scheduling with stochastic activity duration[J]. OR Spectrum, 2019, 41(1):219-254. |
| 12 | Asadujjaman M, Rahman H F, Chakrabortty R K,et al. Resource constrained project scheduling and material ordering problem with discounted cash flows[J]. Computers & Industrial Engineering, 2021, 158: 107427. |
| 13 | Ulusoy G, Sivrikaya-Şerifoğlu F, Şahin Ş. Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows[J]. Annals of Operations Research, 2001,102(1-4):237-261. |
| 14 | Vanhoucke M, Demeulemeester E, Herroelen W. Progress payments in project scheduling problems[J]. European Journal of Operational Research, 2003, 148(3):604-620. |
| 15 | Szmerekovsky J G. The impact of contractor behavior on the client’s payment-scheduling problem[J]. Management Science, 2005, 51(4):629-640. |
| 16 | He Z W, Liu R J, Jia T. Metaheuristics for multi-mode capital-constrained project payment scheduling[J]. European Journal of Operational Research, 2012, 223(3):605-613. |
| 17 | Leyman P, Vanhoucke M. Payment models and net present value optimization for resource-constrained project scheduling[J]. Computers & Industrial Engineering, 2016, 91:139-153. |
| 18 | 刘洋, 陈志, 白思俊. 广义优先关系约束下Max-npv项目调度问题及其遗传算法[J]. 运筹与管理, 2016, 25(6):91-98. |
| Liu Y, Chen Z, Bai S J. Max-npv project scheduling problems with generalized precedence relations and its genetic algorithm[J]. Operations Research and Management Science, 2016, 25(6):91-98. | |
| 19 | He Z W, He H, Liu R J, et al. Variable neighborhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap[J]. Computers & Operations Research, 2017, 78:564-577. |
| 20 | 何正文, 刘人境, 胡信布. 基于合同双方交互作用的项目调度优化[J]. 管理科学学报, 2014, 17(8):48-59. |
| He Z W, Liu R J, Hu X B. Project scheduling optimization based on interaction between two parties of contracts[J]. Journal of Management Sciences in China, 2014, 17(8):48-59. | |
| 21 | Lambrechts O, Demeulemeester E, Herroelen W. A tabu search procedure for developing robust predictive project schedules[J]. International Journal of Production Economics, 2008, 111(2):493-508. |
| 22 | Ma Z Q, Demeulemeester E, He Z W, et al. A computational experiment to explore better robustness measures for project scheduling under two types of uncertain environments[J]. Computers & Industrial Engineering, 2019, 131:382-390. |
| 23 | Artigues C, Michelon P, Reusser S. Insertion techniques for static and dynamic resource-constrained project scheduling[J]. European Journal of Operational Research, 2003, 149(2):249-267. |
| 24 | Waligora G. Simulated annealing and tabu search for discrete-continuous project scheduling with discounted cash flows[J]. RAIRO-Operations Research, 2014, 48(1):1-24. |
| 25 | Mika M, Waligora G, Węglarz J. Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times[J]. European Journal of Operational Research, 2008, 187(3):1238-1250. |
| 26 | Fleszar K, Hindi K S. Solving the resource-constrained project scheduling problem by a variable neighbourhood search[J]. European Journal of Operational Research, 2004, 155(2):402-413. |
| 27 | Chakrabortty R K, Abbasi A, Ryan M J. Multi-mode resource-constrained project scheduling using modified variable neighborhood search heuristic[J]. International Transactions in Operational Research, 2020, 27(1):138-167. |
| 28 | Waligora G. Discrete-continuous project scheduling with discounted cash flows-A tabu search approach[J]. Computers & Operations Research, 2008, 35(7):2141-2153. |
| 29 | Hansen P, Mladenovic N, Pérez J A M. Variable neighbourhood search: Methods and applications[J]. Annals of Operations Research, 2010, 175(1):367-407. |
| [1] | Baofeng Tian, Jingwen Zhang, Lubo Li, Junjie Chen. Integrated Resource-constrained Project Scheduling and Material Ordering Problem with Limited Storage Space [J]. Chinese Journal of Management Science, 2025, 33(8): 144-155. |
| [2] | Xiao Cui, Zhengwen He, Nengmin Wang. Optimization of Reactive Project Scheduling with Stochastic Resource Requirements Considering Information Handling Input [J]. Chinese Journal of Management Science, 2025, 33(8): 218-229. |
| [3] | Lei Zhu, Yaofeng Cui, Jiarui Wang, Jiahao Wu. Dynamic Optimization Model for Renewable Resource Development: An Example of Onshore Wind [J]. Chinese Journal of Management Science, 2025, 33(11): 336-344. |
| [4] | Yidan He,Zhengwen He,Nengmin Wang,Zhiqiang Ma. Resource-constrained Max-NPV Multi-project Scheduling Optimization under Sharing Economy Environment [J]. Chinese Journal of Management Science, 2024, 32(9): 260-270. |
| [5] | Jingchun Feng,Yaqi Yan,Ke Zhang,Daisong Hu. Robust Optimization Model of Water Environment Treatment Portfolio of Big Rivers for Maximizing Enterprise Income——Taking Yangtze River Protection as an Example [J]. Chinese Journal of Management Science, 2024, 32(6): 323-334. |
| [6] | MA Zhi-qiang, XU Xiao-feng, HE Zheng-wen, WANG Neng-min. Robust Scheduling Optimization of Project Resources with Activity Splitting under Complex and Uncertain Environments [J]. Chinese Journal of Management Science, 2022, 30(3): 117-130. |
| [7] | ZHANG Meng-ling, WANG Jing, HUANG Jun. Research on Robust Optimization of Emergency Resource Allocation Based on Supplier Participation Mechanism under Uncertain Demand [J]. Chinese Journal of Management Science, 2020, 28(7): 102-111. |
| [8] | MA Yong, HE Zheng-wen, ZHENG Wei-bo. Proactive Project Scheduling Optimization Based on Flexible Resource Constraint [J]. Chinese Journal of Management Science, 2020, 28(7): 220-230. |
| [9] | CUI Yu-quan, LIU Bing-jie, LIU Cong, QU Jing-jing. Optimization Model Analysis of New Order Agricultural Cooperation Model [J]. Chinese Journal of Management Science, 2020, 28(12): 140-150. |
| [10] | ZHANG Yao, SUN Meng-yang, GUAN Xin. Method of Selecting Project Risk Response Strategies Considering Total Risk Interdependence [J]. Chinese Journal of Management Science, 2020, 28(1): 32-44. |
| [11] | ZHANG Yang, DAN Bin, GAO Hua-Li. Stochastic Scheduling of Product Service System Orders with Due Date Assignment [J]. Chinese Journal of Management Science, 2019, 27(2): 93-106. |
| [12] | WU Zhi-qiao, LU Xiang-yuan, MU Li-feng, TANG Jia-fu. An Optimization Model for System Component Selection to Minimize Cost and Combinational Risk [J]. Chinese Journal of Management Science, 2017, 25(8): 158-165. |
| [13] | LAN Bo-xiong, WANG Tong-shu. Optimization Model and Algorithms for Large-scale Rail Passenger Transport Network Operation [J]. Chinese Journal of Management Science, 2016, 24(6): 159-170. |
| [14] | LI Gen, LIU Jia-guo, ZHAO Jin-lou. Scenario Analysis of Complete Energy Intensity of Manufacturing Industry in China Based on Input and Output and Non-linear Optimization [J]. Chinese Journal of Management Science, 2016, 24(3): 31-40. |
| [15] | LAN Bo-xiong, ZHANG Mi. Airline Crew Pairing Model with Stochastic Disruptions [J]. Chinese Journal of Management Science, 2015, 23(12): 167-176. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||
|
||