| [1] |
Baofeng Tian, Jingwen Zhang, Lubo Li, Junjie Chen.
Integrated Resource-constrained Project Scheduling and Material Ordering Problem with Limited Storage Space
[J]. Chinese Journal of Management Science, 2025, 33(8): 144-155.
|
| [2] |
Xiao Cui, Zhengwen He, Nengmin Wang.
Optimization of Reactive Project Scheduling with Stochastic Resource Requirements Considering Information Handling Input
[J]. Chinese Journal of Management Science, 2025, 33(8): 218-229.
|
| [3] |
Yanting Wang, Weibo Zheng, Zhiqiang Ma, Zhengwen He.
Robustness Threshold-based Max-NPV Project Scheduling Optimization on Different Clients’ Payment Modes
[J]. Chinese Journal of Management Science, 2025, 33(4): 185-196.
|
| [4] |
Yidan He,Zhengwen He,Nengmin Wang,Zhiqiang Ma.
Resource-constrained Max-NPV Multi-project Scheduling Optimization under Sharing Economy Environment
[J]. Chinese Journal of Management Science, 2024, 32(9): 260-270.
|
| [5] |
Jingchun Feng,Yaqi Yan,Ke Zhang,Daisong Hu.
Robust Optimization Model of Water Environment Treatment Portfolio of Big Rivers for Maximizing Enterprise Income——Taking Yangtze River Protection as an Example
[J]. Chinese Journal of Management Science, 2024, 32(6): 323-334.
|
| [6] |
MA Zhi-qiang, XU Xiao-feng, HE Zheng-wen, WANG Neng-min.
Robust Scheduling Optimization of Project Resources with Activity Splitting under Complex and Uncertain Environments
[J]. Chinese Journal of Management Science, 2022, 30(3): 117-130.
|
| [7] |
CHENG Xing-qun, JIN Chun, YAO Qing-guo, WANG Cong.
Research on Robust Optimization for Route Selection Problem in Multimodal Transportation under the Cap and Trade Policy
[J]. Chinese Journal of Management Science, 2021, 29(6): 82-90.
|
| [8] |
ZHANG Meng-ling, WANG Jing, HUANG Jun.
Research on Robust Optimization of Emergency Resource Allocation Based on Supplier Participation Mechanism under Uncertain Demand
[J]. Chinese Journal of Management Science, 2020, 28(7): 102-111.
|
| [9] |
MA Yong, HE Zheng-wen, ZHENG Wei-bo.
Proactive Project Scheduling Optimization Based on Flexible Resource Constraint
[J]. Chinese Journal of Management Science, 2020, 28(7): 220-230.
|
| [10] |
CUI Yu-quan, LIU Bing-jie, LIU Cong, QU Jing-jing.
Optimization Model Analysis of New Order Agricultural Cooperation Model
[J]. Chinese Journal of Management Science, 2020, 28(12): 140-150.
|
| [11] |
ZHANG Yao, SUN Meng-yang, GUAN Xin.
Method of Selecting Project Risk Response Strategies Considering Total Risk Interdependence
[J]. Chinese Journal of Management Science, 2020, 28(1): 32-44.
|
| [12] |
WU Zhi-qiao, LU Xiang-yuan, MU Li-feng, TANG Jia-fu.
An Optimization Model for System Component Selection to Minimize Cost and Combinational Risk
[J]. Chinese Journal of Management Science, 2017, 25(8): 158-165.
|
| [13] |
LAN Bo-xiong, WANG Tong-shu.
Optimization Model and Algorithms for Large-scale Rail Passenger Transport Network Operation
[J]. Chinese Journal of Management Science, 2016, 24(6): 159-170.
|
| [14] |
LI Gen, LIU Jia-guo, ZHAO Jin-lou.
Scenario Analysis of Complete Energy Intensity of Manufacturing Industry in China Based on Input and Output and Non-linear Optimization
[J]. Chinese Journal of Management Science, 2016, 24(3): 31-40.
|
| [15] |
ZHANG Li, DENG Li-ying, ZHOU Yong.
Contrarian Effect of Semi-Parametric Alpha Strategy
[J]. Chinese Journal of Management Science, 2016, 24(12): 30-38.
|