主管:中国科学院
主办:中国优选法统筹法与经济数学研究会
   中国科学院科技战略咨询研究院

   

Distributionally robust optimization for a parallel batch-processing machine scheduling problem with precedence constraints in aerospace composite materials manufacturing

  

  1. , 650504, China
    , 211100, China
    , 210003, China
    , 650221, China
  • Received:2025-12-22 Revised:2026-10-25 Accepted:2026-11-05

Abstract: To address the scheduling challenges posed by uncertain processing times and the re-entrant autoclave scheduling operation in the manufacturing of aerospace composites, this paper investigates a parallel batch-processing machines scheduling problem with uncertain processing times and precedence constraints. The objective is to minimize the expected makespan by batching jobs and sequencing the batches under precedence constraints, without relying on the exact probability distribution of processing times but only on their support sets and estimated moment information. Based on the distributionally robust optimization approach, this paper first characterizes the scenario where the probability distribution of processing times is unknown but their moment information can be estimated. Moreover, a distributionally robust optimization model, which minimizes the worst-case expected makespan out of all probability distributions, is constructed and then reformulated as an equivalent mixed-integer linear form. Furthermore, by introducing symmetry-breaking rules, a relaxed model without precedence constraints is established, and necessary and sufficient conditions for the feasibility of solutions to the original problem are proven. Based on these properties, an equivalent mixed-integer linear programming model with an exponential number of constraints is proposed. A branch-and-cut algorithm framework is designed to solve this model efficiently, incorporating stronger valid cuts whose correctness is proven. Finally, computational experiments demonstrate the superior performance of the proposed algorithm and validate that the distributionally robust optimization model effectively hedges against deviations in moment estimates, significantly enhancing the robustness of the production schedule.

Key words: Aerospace composite materials manufacturing, distributionally robust optimization, batch-processing machine scheduling, re-entrant, branch-and-cut