| [1] |
Zhang J, Li L, Demeulemeester E, et al. A three-dimensional spatial resource-constrained project scheduling problem: Model and heuristic[J]. European Journal of Operational Research, 2024, 319(3): 943-966.
|
| [2] |
Yin J, Huang R, Sun H, et al. Multi-objective optimization for coordinated production and transportation in prefabricated construction with on-site lifting requirements[J]. Computers & Industrial Engineering, 2024, 189: 110017.
|
| [3] |
Tian B, Zhang J, Demeulemeester E, et al. A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply[J]. Computers & Operations Research, 2024, 166: 106624.
|
| [4] |
Zhang Y, Cui N. Project scheduling and material ordering problem with storage space constraints[J]. Automation in Construction, 2021, 129: 103796.
|
| [5] |
胡雪君, 王建江, 崔南方, 等. 项目调度与物料订购集成优化研究综述[J]. 控制与决策, 2022, 37(9): 2189-2200.
|
|
Hu X J, Wang J J, Cui N F, et al. Integrated project scheduling and material ordering: A literature review[J]. Control and Decision, 2022, 37(9): 2189-2200.
|
| [6] |
Hartmann S, Briskorn D. An updated survey of variants and extensions of the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 2022, 297(1): 1-14.
|
| [7] |
Aquilano N J, Smith D E. A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning[J]. Journal of Operations Management, 1980, 1(2): 57-67.
|
| [8] |
Sha Y, Zhang J, Cao H. Multistage stochastic programming approach for joint optimization of job scheduling and material ordering under endogenous uncertainties[J]. European Journal of Operational Research, 2021, 290(3): 886-900.
|
| [9] |
Parchami Afra A, Kheirkhah A, Ahadi H. Systematic literature review of integrated project scheduling and material ordering problem: Formulations and solution methods[J]. Computers & Industrial Engineering, 2022, 173: 108711.
|
| [10] |
Fu F. Integrated scheduling and batch ordering for construction project[J]. Applied Mathematical Modelling, 2014, 38(2): 784-797.
|
| [11] |
Asadujjaman M, Rahman H F, Chakrabortty R K, et al. Supply chain integrated resource-constrained multi-project scheduling problem[J]. Computers & Industrial Engineering, 2024, 194: 110380.
|
| [12] |
Zhang Y, Cui N, Hu X, et al. Robust project scheduling integrated with materials ordering under activity duration uncertainty[J]. Journal of the Operational Research Society, 2020, 71(10): 1581-1592.
|
| [13] |
Afra A P, Kheirkhah A. A Lagrangian heuristic for integrated production planning, material ordering and investment multi-project scheduling in a project-driven supply chain[J]. Engineering Optimization, 2024, 56(10): 1639-1659.
|
| [14] |
雷晓琪, 崔南方, 杨丁凤, 等. 装配式建筑环境下集成物料订货重复性项目调度优化[J]. 系统工程学报, 2024, 39(5): 676-690.
|
|
Lei X Q, Cui N F, Yang D F, et al. Integrating material ordering with repetitive project scheduling in prefabricated buildings[J]. Journal of Systems Engineering, 2024, 39(5): 676-690.
|
| [15] |
Wolpert D H, Macready W G. No free lunch theorems for optimization[J]. IEEE Transactions on Evolutionary Computation, 1997, 1(1): 67-82.
|
| [16] |
Messelis T, De Causmaecker P. An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem[J]. European Journal of Operational Research, 2014, 233(3): 511-528.
|
| [17] |
Müller D, Müller M G, Kress D, et al. An algorithm selection approach for the flexible job shop scheduling problem: Choosing constraint programming solvers through machine learning[J]. European Journal of Operational Research, 2022, 302(3): 874-891.
|
| [18] |
张亚宁, 白思俊, 陈志, 等. 基于深度学习的RCPSP调度优先规则实时动态选择算法[J]. 系统工程理论与实践, 2023, 43(7): 2142-2153.
|
|
Zhang Y N, Bai S J, Chen Z, et al. Real-time dynamic selection algorithm of RCPSP scheduling priority rules based on deep learning[J]. Systems Engineering —Theory & Practice, 2023, 43(7): 2142-2153.
|
| [19] |
Blazewicz J, Lenstra J K, Kan A H G R. Scheduling subject to resource constraints: Classification and complexity[J]. Discrete Applied Mathematics, 1983, 5(1): 11-24.
|
| [20] |
Kerschke P, Hoos H H, Neumann F, et al. Automated algorithm selection: Survey and perspectives[J]. Evolutionary Computation, 2019, 27(1): 3-45.
|
| [21] |
Rice J R. The algorithm selection problem[J]Advances in Computers, 1976, 15: 65-118.
|
| [22] |
Bredael D, Vanhoucke M. A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem[J]. European Journal of Operational Research, 2024, 315(1): 19-34.
|
| [23] |
del Valle Y, Venayagamoorthy G K, Mohagheghi S, et al. Particle swarm optimization: Basic concepts, variants and applications in power systems[J]. IEEE Transactions on Evolutionary Computation, 2008, 12(2): 171-195.
|
| [24] |
He Y, Jia T, Zheng W. Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns[J]. Annals of Operations Research, 2024, 338(1): 115-149.
|
| [25] |
Alcaraz J, Maroto C, Ruiz R. Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms[J]. Journal of the Operational Research Society, 2003, 54(6): 614-626.
|
| [26] |
Kolisch R. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation[J]European Journal of Operational Research, 1996, 90(2): 320-333.
|
| [27] |
Hartmann S. A competitive genetic algorithm for resource-constrained project scheduling[J]. Naval Research Logistics, 1998, 45(7): 733-750.
|
| [28] |
Kolisch R, Sprecher A, Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems[J]. Management Science, 1995, 41(10): 1693-1703.
|
| [29] |
Kolisch R, Sprecher A. PSPLIB - A project scheduling problem library[J]. European Journal of Operational Research, 1997, 96(1): 205-216.
|
| [30] |
Chu X, Li S, Gao F, et al. A data-driven meta-learning recommendation model for multi-mode resource constrained project scheduling problem[J]. Computers & Operations Research,2023,157: 106290.
|
| [31] |
Pascoe T L. Allocation of resources CPM[J]. Revue Francaise De Recherche Operationnelle, 1966, 10(38): 31-38.
|
| [32] |
Demeulemeester E, Vanhoucke M, Herroelen W. RanGen: A random network generator for activity-on-the-node networks[J]. Journal of Scheduling, 2003, 6(1): 17-38.
|
| [33] |
Patterson J H. Project scheduling: The effects of problem structure on heuristic performance[J]. Naval Research Logistics Quarterly, 1976, 23(1): 95-123.
|