在网上定制的市场中,需求具有数量和时间两方面的不确定性。本文提出同时考虑需求量具有承诺交货时间敏感性和随机性,采用作业成本法建立以期望利润为目标函数,以承诺交货时间和产能为决策变量的模型。通过模型的分析得到了相互递推的最优承诺交货时间和最优产能数学表达式。在此基础上,运用排队理论建立了以承诺交货时间可靠性为限制条件的M/M/1决策模型。通过模型分析,证明了模型是凹规划,给出了最优承诺交货时间和最优产能满足的方程组。最后,通过算例的分析可知最优承诺交货时间和最优产能受承诺交货时间可靠性限制,而且随着承诺交货时间可靠性的提高,最优承诺交货时间是递增的,最优产能和最优期望利润是递减的。研究表明:结合承诺交货时间可靠性确定最优承诺交货时间和最优产能有助于提高产能的利用率和交货时间的准确性。
In the market of online-customized products, demands possess uncertainty in both amount and time.In this paper, a promised lead time and capacity decision-making model is proposed by taking expected profit as the objective function with the Activity Based Costing, considering the demands are sensitivity of promised lead time and stochastic. A recursive mathematical expression of the optimal promised lead time and the optimal capacity is obtained by analyzing the model. On this basis, building up the M/M/1 model by taking the reliability of promised lead time as limiting condition with the queuing theory. It is proved that the M/M/1 model is Concave Programming, and equations of the optimal promised lead time and the optimal capacity are obtained. At last, through numerical example the optimal promised lead time and the optimal capacity are restricted by the reliability of promised lead time, and with the improvement of the reliability of promised lead time, the optimal promised lead time is increasing; the optimal capacity and the optimal expected profit are decreasing. The research shows that the optimal promised lead time and the optimal capacity are got through combining with the reliability of the promised lead time, which can improve the utilization rate of capacity and the accuracy of lead time.
[1] Ballou R H. Business logistics management[M].Upper Saddle River:Prentice Hall,1998.
[2] Stalk G. Competing against time: How time-based competition is reshaping global mar[M].London:Collier Macmillan: 1990.
[3] Bozdogan K, Deyst J, Hoult D. Supplier integration into design and development[J].Robitics & Automous Systems,2013,6(3):197-198.
[4] Suri R. Quick response manufacturing: A companywide approach to reducing lead times[M]. Productivity Press, 1998.
[5] Rondeau P J, Vonderembse M A, Ragu-Nathan T S. Exploring work system practices for time-based manufacturers: Their impact on competitive capabilities[J]. Journal of Operations Management, 2000, 18(5): 509-529.
[6] Nahm A Y, Vonderembse M A, Koufteros X A. The impact of organizational structure on time-based manufacturing and plant performance[J]. Journal of Operations Management, 2003, 21(3): 281-306.
[7] Fisher M L. What is the right supply chain for your product?[J]. Harvard Business Review, 1997, 75(2): 105-117.
[8] 杨文胜,李莉.响应时间不确定下的交货期相关定价研究[J].中国管理科学,2005,13(2):56-62.
[9] 马士华,王福寿.时间价格敏感型需求下的供应链决策模式研究[J].中国管理科学,2006,14(3):13-19.
[10] Yang Daojian, Qi Ershi, Li Yajiao. Quick response and supply chain structure with strategic consumers[J]. Omega, 2015, 52: 1-14.
[11] So K C, Song J S. Price, delivery time guarantees and capacity selection[J]. European Journal of Operational Research, 1998, 111(1): 28-49.
[12] Lederer P J, Li L. Pricing, production, scheduling, and delivery-time competition[J]. Operations Research, 1997, 45(3): 407-420.
[13] Boyaci T, Ray S. The impact of capacity costs on product differentiation in delivery time, delivery reliability, and price[J]. Production and Operations Management, 2006, 15(2): 179-197.
[14] Park S, Hong K. Optimal guaranteed service time and service level decision with time and service level sensitive demand[J]. Mathematical Problems in Engineering, 2014,2014:1-7.
[15] Falu I, Duffie N. Adaptive due date deviation regulation using capacity and order release time adjustment[J]. Procedia CIRP, 2014, 17: 398-403.
[16] Knollmann M, Windt K, Duffie N. Evaluation of capacity control and planned lead time control in a control-theoretic model[J]. Procedia CIRP, 2014, 17: 392-397.
[17] 谢祥添,张毕西.基于需求交货时间敏感性交货时间与产能决策[J].系统工程理论与实践,2015,35(9):2242-2250.
[18] Jayaswal S, Jewkes E M. Price and lead time differentiation, capacity strategy and market competition[J].International Journal of Production Research, 2016, 54(9): 2791-2806.
[19] 张菊亮,张明玉.能力规划、促销与库存控制集成决策[J].系统工程学报,2008,23(6):659-665.
[20] Cooper R, Kaplan R S. How cost accounting systematically distorts product costs[M]//Bruns Jr.W J,kaplan R S. Accounting and management: Field study perspectives, Boston:Harvard Business School Press,1987: 204-228.
[21] Kaplan R S. Research opportunities in management accounting[J]. Journal of Management Accounting Research, 1993, 5(3): 1-14.
[22] Banker R D, Hughes J S. Product costing and pricing[J]. Accounting Review, 1994,69(3): 479-494.
[23] Balakrishnan R, Sivaramakrishnan K. Sequential solutions to capacity-planning and pricing decisions[J]. Contemporary Accounting Research, 2001, 18(1): 1-26.
[24] Göx R F. The impact of cost-based pricing rules on capacity planning under uncertainty[J]. Schmalenbachs Business Review, 2001, 53(3): 197-228.
[25] Göx R F. Capacity planning and pricing under uncertainty[J]. Journal of Management Accounting Research, 2002, 14(1): 59-78.
[26] Ho T H, Zheng Yusheng. Setting customer expectation in service delivery: An integrated marketing-operations perspective[J]. Management Science, 2004, 50(4): 479-488.
[27] Noblesse A M, Boute R N, Lambrecht M R, et al. Lot sizing and lead time decisions in production/inventory systems[J]. International Journal of Production Economics, 2014, 155: 351-360.
[28] Abate J, Choudhury G L, Whitt W. Exponential approximations for tail probabilities in queues, I: Waiting times[J]. Operations Research, 1995, 43(5): 885-901.
[29] 方逵,朱幸辉,刘华富.二元凸函数的判别条件[J].纯粹数学与应用数学, 2008,24(1):97-101.