1 |
周凌云, 丁小东, 王涵晴,等. 基于最大覆盖理论的高铁快运网络布局方法研究[J]. 铁道运输与经济, 2021, 43(12): 54-59.
|
|
Zhou L Y, Ding X D, Wang H Q, et al. Research on layout method of high speed railway express networks based on maximum coverage theory[J]. Railway Transport and Economy, 2021, 43(12): 54-59.
|
2 |
李奇, 孙逊, 贺政纲. 我国高铁快运网络节点规划研究[J]. 铁道标准设计, 2020, 64(6): 32-37.
|
|
Li Q, Sun X, He Z G. Research on the node planning of High-speed rail express network in China[J]. Railway Standard Design, 2020, 64(6): 32-37.
|
3 |
李夏苗, 佘勇, 朱晓立, 等. 模糊聚类分析在铁路快运网络规划中的应用[J].中国铁道科学,2005,26(4):124-129.
|
|
Li X M, She Y, Zhu X L, et al. Application of the fuzzy clustering analysis in the planning of express Freight Transportation Network[J]. China Railway Science, 2005, 26(4):124-129.
|
4 |
王沛. 铁路专业型物流网络优化建模方法研究[D]. 北京: 北京交通大学博士学位论文, 2018.
|
|
Wang P. Research on modeling method for railway professional logistics network optimization[D]. Beijing: Doctoral Dissertation of Beijing Jiaotong University, 2018.
|
5 |
Pazour J A, Meller R D, et al. A model to design a national high-speed rail network for freight distribution[J]. Transportation Research Part A: Policy and Practice, 2010, 44(3): 119-135.
|
6 |
Snyder L V, Atan Z, Peng P, et al. OR/MS models for supply chain disruptions: A review[J]. Iie Transactions, 2016, 48(2): 89-109.
|
7 |
Tiwari R, Jayaswal S, Sinha A. Competitive hub location problem: Model and solution approaches[J]. Transportation Research Part B: Methodological, 2021, 146(C): 237-261.
|
8 |
郑龙. 随机运输网络优化模型及其算法研究[D]. 长沙: 国防科技大学博士学位论文, 2009.
|
|
Zheng L. Research on stochastic transportation network optimization model and its algorithm[D]. Changsha: Doctoral Dissertation of National Defense University of Science and Technology, 2009.
|
9 |
许丹, 夏少连, 丁强, 等. 基于启发式混合整数规划法求解大规模机组组合问题[J]. 电力系统保护与控制, 2012, 40(21): 1-6+13.
|
|
Xu D, Xia S L, Ding Q, et al. Fast unit commitment based on heuristic mixed integer programming[J]. Power System Protection and Control, 2012, 40(21): 1-13.
|
10 |
Sullivan J L, Novak D C, Aultman-Hall L, et al. Identifying critical road segments and measuring system-wide robustness in transportation networks with isolating links: A link-based capacity-reduction approach[J]. Transportation Research Part A: Policy and Practice, 2010, 44(5): 323-336.
|
11 |
Scarf H E, Arrow K J, Karlin S. A min-max solution of an inventory problem[M]. Santa Monica: Rand Corporation, 1957.
|
12 |
Zhang Y L, Zuo J, Shen M, et al. Distributionally robust optimization of two-stage lot-sizing problems[J]. Production & Operations Management, 2016, 25(12): 2116-2131.
|
13 |
Erdogan E. Ambiguous chance constrained programs: Algorithms and applications[D]. New York: Columbia University, 2018.
|
14 |
Calafiore G C. Ambiguous risk measures and optimal robust portfolios[J]. SIAM Journal on Optimization, 2007, 18(3): 853-877.
|
15 |
Mehrotra S, He Z. Models and algorithms for distributionally robust least squares problems[J]. Mathematical Programming, 2014, 146(1): 123-141.
|
16 |
Jiang R Y, Guan Y P. Risk-averse two-stage stochastic program with distributional ambiguity[J]. Operations Research, 2018, 66(5): 1390-1405.
|
17 |
Hanasusanto G A, Kuhn D. Conic programming reformulations of two-stage distributionally robust linear programs over Wasserstein balls[J]. Operations Research, 2017, 66(3): 849-869.
|
18 |
Alumur S A, Campbell J F, Contreras I, et al. Perspectives on modeling hub location problems[J]. European Journal of Operational Research, 2021, 291(1): 1-17.
|
19 |
Liu K L, Li Q F, Zhang Z H. Distributionally robust optimization of an emergency medical service station location and sizing problem with joint chance constraints[J]. Transportation Research Part B: Methodological, 2019, 119: 79-101.
|
20 |
Fu C Y, Zhu N, Ma S F, et al. A two-stage robust approach to integrated station location and rebalancing vehicle service design in bike-sharing systems[J]. European Journal of Operational Research, 2022, 298(3): 915-938.
|
21 |
Basallo-Triana M J, Vidal-Holguín C J, Bravo-Bastidas J J. Planning and design of intermodal hub networks: A literature review[J]. Computers & Operations Research, 2021, 136: 105469.
|
22 |
Jeong S J, Lee C G, Bookbinder J H. The European freight railway system as a hub-and-spoke network[J]. Transportation Research Part A: Policy and Practice, 2007, 41(6): 523-536.
|
23 |
Azizi N, Chauhan S, Salhi S, et al. The impact of hub failure in hub-and-spoke networks: Mathematical formulations and solution techniques[J]. Computers & Operations Research, 2014, 65: 174-188.
|
24 |
O'Kelly M E, Campbell J F, de Camargo,R S, et al. Multiple allocation hub location model with fixed arc costs[J]. Geographical Analysis, 2015, 47(1): 73-96.
|
25 |
Delage E, Ye Y. Distributionally robust optimization under moment uncertainty with application to data-driven problems[J]. Operations Research, 2010, 58(3): 595-612.
|
26 |
Lofberg J. YALMIP: A toolbox for modeling and optimization in MATLAB[C]//Proceedings of 2004 IEEE international conference on robotics and automation, Taiwan, September 2-4, IEEE, 2004: 284-289.
|