| [1] | 
																						 
											刘乐, 周泓. 一种常见干扰条件下的开放式车间重调度研究[J].管理科学学报,2014, 17(6):28-48.
																						 | 
										
																													
																							| [2] | 
																						 
											Ahmadi E, Zandieh M, Farrokh M, et al. A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms[J]. Computers & Operations Research, 2016, 73:56-66.
																						 | 
										
																													
																							| [3] | 
																						 
											Fazayeli M, Aleagha M R, Bashirzadeh R, et al. A hybrid meta-heuristic algorithm for flowshop robust scheduling under machine breakdown uncertainty[J]. International Journal of Computer Integrated Manufacturing, 2016, 29(7):709-719.
																						 | 
										
																													
																							| [4] | 
																						 
											Mehta S V, Uzsoy R M. Predictable scheduling of a job shop subject to breakdowns[J]. IEEE Transactions on Robotics and Automation, 1998, 14(3):365-378.
																						 | 
										
																													
																							| [5] | 
																						 
											尹文君, 刘民, 吴澄. 随机故障下单机鲁棒调度算法的遗传编程方法[J]. 清华大学学报(自然科学版), 2005, 45(1):81-84.
																						 | 
										
																													
																							| [6] | 
																						 
											李巧云, 王冰, 王晓明. 随机机器故障下单机预测调度方法[J]. 系统工程理论与实践, 2011, 31(12):2387-2393.
																						 | 
										
																													
																							| [7] | 
																						 
											Liu Lin, Gu Hanyu, Xi Yugeng. Robust and stable scheduling of a single machine with random machine breakdowns[J]. International Journal of Advanced Manufacturing Technology, 2007, 31(7-8):645-654.
																						 | 
										
																													
																							| [8] | 
																						 
											Al-Hinai N, ElMekkawy T Y. Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm[J]. International Journal of Production Economics, 2011, 132(2):279-291.
																						 | 
										
																													
																							| [9] | 
																						 
											Xiong Jian, Xing Lining, Chen Yingwu. Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns[J]. International Journal of Production Economics, 2013, 141(1):112-126.
																						 | 
										
																													
																							| [10] | 
																						 
											Yang Bibo, Geunes J. Predictive-reactive scheduling on a single resource with uncertain future jobs[J]. European Journal of Operational Research, 2008, 189(3):1267-1283.
																						 | 
										
																													
																							| [11] | 
																						 
											Akturk M S, Atamturk A, Gurel S. Parallel machine match-up scheduling with manufacturing cost considerations[J]. Journal of Scheduling, 2010, 13(1):95-110.
																						 | 
										
																													
																							| [12] | 
																						 
											Gurel S, Korpeoglu E, Akturk M S. An anticipative scheduling approach with controllable processing times[J]. Computers & Operations Research, 2010, 37(6):1002-1013.
																						 | 
										
																													
																							| [13] | 
																						 
											刘锋, 王征, 王建军, 等. 加工能力受扰的可控排序干扰管理[J]. 系统管理学报, 2013, 22(4):505-512.
																						 | 
										
																													
																							| [14] | 
																						 
											边志兴. 作业车间的模糊动态调度问题研究[J].中国管理科学,2008,16(S1):76-83.
																						 | 
										
																													
																							| [15] | 
																						 
											Tang Lixin, Zhao Yue, Liu Jiyin. An improved differential evolution algorithm for practical dynamic scheduling in steelmaking-continuous casting production[J].IEEE Transactions onEvolutionary Computation, 2014, 18(2):209-225.
																						 | 
										
																													
																							| [16] | 
																						 
											Felix T S, Shekhar P, Tiwari M K. Dynamic scheduling of oil tankers with splitting of cargo at pickup and delivery locations:A multi-objective ant colony-based approach[J]. International Journal of Production Research, 2014, 52(24):7436-7453.
																						 | 
										
																													
																							| [17] | 
																						 
											Shen Xiaoning, Yao Xin. Mathematical modeling and multi-objective evolutionary algorithms applied to dynamic flexible job shop scheduling problems[J]. Information Sciences, 2015, 298:198-224.
																						 | 
										
																													
																							| [18] | 
																						 
											Liu Le, Zhou Hong. On the identical parallel-machine rescheduling with job rework disruption[J]. Computers & Industrial Engineering, 2013, 66(1):186-198.
																						 | 
										
																													
																							| [19] | 
																						 
											Cui Weiwei, Lu Zhiqiang, Pan Ershun. Integrated production scheduling and maintenance policy for robustness in a single machine[J]. Computers & Operations Research, 2014, 47:81-91.
																						 | 
										
																													
																							| [20] | 
																						 
											Akturk M S, Atamturk A, Gurel S. A strong conic quadratic reformulation for machine-job assignment with controllable processing times[J]. Operations Research Letters, 2009, 37(3):187-191.
																						 | 
										
																													
																							| [21] | 
																						 
											李素粉, 朱云龙, 尹朝万. 具有随机加工时间和机器故障的流水车间调度[J]. 计算机集成制造系统, 2005, 11(10):1425-1429.
																						 | 
										
																													
																							| [22] | 
																						 
											刘锋, 王建军, 饶卫振, 等. 安装时间与次序相关的生产调度干扰管理研究[J].中国管理科学,2014, 22(1):45-54.
																						 | 
										
																													
																							| [23] | 
																						 
											Bonfill A, Espuna A, Puigjaner L. Proactive approach to address the uncertainty in short-term scheduling[J]. Computers & Chemical Engineering, 2008, 32(8):1689-1706.
																						 | 
										
																													
																							| [24] | 
																						 
											Wu S D, Byeon E, Storer R H. A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness[J]. Operations Research, 1999, 47(1):113-124.
																						 | 
										
																													
																							| [25] | 
																						 
											Alizadeh F, Goldfarb D. Second-order cone programming[J]. Mathematical Programming, 2003, 95(1):3-51.
																						 | 
										
																													
																							| [26] | 
																						 
											Adiri I, Bruno J, Frostig E, et al. Single-machine flow-time scheduling with a single breakdown[J]. Acta Informatica, 1989, 26(7):679-685.
																						 |