Chinese Journal of Management Science ›› 2026, Vol. 34 ›› Issue (9): 173-183.doi: 10.16381/j.cnki.issn1003-207x.2024.1431
Previous Articles Next Articles
Yang Yang1(
), Bin Zhang2, Chenghung Wu2
Received:2024-08-21
Revised:2025-09-16
Online:2026-09-25
Published:2026-09-01
Contact:
Yang Yang
E-mail:y.yang@jxufe.edu.cn
CLC Number:
Yang Yang,Bin Zhang,Chenghung Wu. A Dynamic Scheduling and Preventive Maintenance Method Based on Product-machine Assignment[J]. Chinese Journal of Management Science, 2026, 34(9): 173-183.
"
| 符号 | 定义 |
|---|---|
| 异质机器, | |
| 产品类型, | |
| 机器的健康状态, | |
| 类型 | |
| 类型 | |
| 类型 | |
| 机器 | |
| 机器 | |
| 机器 | |
| 系统对类型 | |
| 机器 | |
| 机器 | |
| 机器 | |
| 惩罚参数 | |
| 机器 | |
| 机器 | |
| 机器 | |
| 机器 | |
| 机器 |
"
| 组数 | 加工量(throughput) | 排名 | 周期时间(cycle time) | |||||||
|---|---|---|---|---|---|---|---|---|---|---|
| PMA | FCFS | RR | PMA | FCFS | RR | 排名 | ||||
| 1 | 1 | 0.999971 | 0.999966 | 0.997559 | 1 | 1 | 1.264588 | 1.986918 | 42.34997 | 1 |
| 2 | 1 | 1.000050 | 0.999897 | 0.991072 | 2 | 1 | 2.452379 | 4.219488 | 86.43064 | 1 |
| 3 | 1 | 1.000990 | 1.000920 | 0.951533 | 3 | 1 | 1.801101 | 2.703178 | 372.1982 | 1 |
| 4 | 1 | 0.999743 | 0.999638 | 0.974946 | 1 | 1 | 1.839797 | 3.288675 | 223.1338 | 1 |
| 5 | 1 | 1.000690 | 1.000650 | 0.976180 | 3 | 1 | 1.819549 | 2.601473 | 200.5406 | 1 |
| 6 | 1 | 1.000070 | 0.999835 | 0.945081 | 2 | 1 | 1.339083 | 4.561200 | 282.2754 | 1 |
| 7 | 1 | 0.998862 | 0.980997 | 0.915783 | 1 | 1 | 5.936320 | 91.12744 | 399.4801 | 1 |
| 8 | 1 | 0.999522 | 0.998956 | 0.902262 | 1 | 1 | 2.928198 | 10.96073 | 419.5037 | 1 |
| 9 | 1 | 0.999043 | 0.996639 | 0.922214 | 1 | 1 | 2.557469 | 23.77550 | 357.4400 | 1 |
| 10 | 1 | 0.999556 | 0.998368 | 0.922119 | 1 | 1 | 3.805694 | 14.93735 | 361.6735 | 1 |
| 11 | 1 | 1.000000 | 0.944389 | 0.903269 | 1 | 1 | 1.913713 | 114.9279 | 199.9187 | 1 |
| 12 | 1 | 0.952196 | 0.863463 | 0.843457 | 1 | 1 | 104.4222 | 170.1283 | 345.5426 | 1 |
| 13 | 1 | 0.985381 | 0.921614 | 0.860281 | 1 | 1 | 35.61172 | 138.7980 | 250.3416 | 1 |
| 14 | 1 | 0.994109 | 0.896403 | 0.875915 | 1 | 1 | 16.21934 | 178.9412 | 210.9248 | 1 |
| 15 | 1 | 0.953929 | 0.911621 | 0.880020 | 1 | 1 | 112.6484 | 196.6269 | 251.3258 | 1 |
| 平均 | 1 | 0.992270 | 0.967560 | 0.924110 | 1 | 1 | 19.77064 | 63.97229 | 266.8720 | 1 |
"
| 组数 | 加工量(throughput) | 排名 | 周期时间(cycle time) | |||||||
|---|---|---|---|---|---|---|---|---|---|---|
| PMA | FCFS | RR | PMA | FCFS | RR | 排名 | ||||
| 1 | 1 | 0.999896 | 0.999804 | 0.999320 | 1 | 1 | 1.518906 | 2.819724 | 13.75071 | 1 |
| 2 | 1 | 0.999582 | 0.999527 | 0.952204 | 1 | 1 | 1.762471 | 2.669434 | 274.6904 | 1 |
| 3 | 1 | 0.999434 | 0.999520 | 0.966677 | 1 | 1 | 3.704707 | 3.454183 | 247.1250 | 1 |
| 4 | 1 | 1.000150 | 1.000120 | 0.998866 | 3 | 1 | 1.267441 | 1.999892 | 25.19993 | 1 |
| 5 | 1 | 1.000190 | 1.000170 | 0.999191 | 3 | 1 | 1.098525 | 2.031347 | 16.80865 | 1 |
| 6 | 1 | 1.000190 | 0.999575 | 0.996797 | 2 | 1 | 1.997733 | 11.17308 | 38.66972 | 1 |
| 7 | 1 | 0.998396 | 0.978121 | 0.878477 | 1 | 1 | 8.353749 | 52.40721 | 298.2966 | 1 |
| 8 | 1 | 0.988495 | 0.994090 | 0.907828 | 1 | 1 | 61.24679 | 35.66157 | 427.1458 | 1 |
| 9 | 1 | 1.000150 | 0.999910 | 0.968758 | 2 | 1 | 1.402976 | 4.471217 | 201.6394 | 1 |
| 10 | 1 | 0.999788 | 0.999511 | 0.969740 | 1 | 1 | 1.016604 | 3.920757 | 149.3260 | 1 |
| 11 | 1 | 0.999088 | 0.892931 | 0.922390 | 1 | 1 | 4.575516 | 159.5305 | 220.2111 | 1 |
| 12 | 1 | 0.936060 | 0.899046 | 0.823862 | 1 | 1 | 7.553965 | 9.423581 | 22.53733 | 1 |
| 13 | 1 | 0.920833 | 0.890812 | 0.850538 | 1 | 1 | 144.5821 | 102.8903 | 320.3413 | 1 |
| 14 | 1 | 1.000310 | 0.962727 | 0.899880 | 2 | 1 | 1.813552 | 114.9261 | 332.0536 | 1 |
| 15 | 1 | 0.999820 | 0.953125 | 0.905323 | 1 | 1 | 1.116295 | 88.80913 | 207.3520 | 1 |
| 平均 | 1 | 0.989490 | 0.971270 | 0.935990 | 1 | 1 | 16.20075 | 39.74587 | 186.3432 | 1 |
"
| 组数 | 加工量(throughput) | 排名 | 周期时间(cycle time) | |||||||
|---|---|---|---|---|---|---|---|---|---|---|
| PMA | FCFS | RR | PMA | FCFS | RR | 排名 | ||||
| 1 | 1 | 1.000300 | 1.000260 | 0.997253 | 3 | 1 | 1.244983 | 1.855764 | 53.11870 | 1 |
| 2 | 1 | 1.000340 | 1.000290 | 0.987597 | 3 | 1 | 2.583740 | 4.182920 | 116.5188 | 1 |
| 3 | 1 | 0.999955 | 0.999978 | 0.969720 | 1 | 1 | 1.919465 | 2.792775 | 252.7203 | 1 |
| 4 | 1 | 0.999997 | 0.999920 | 0.977503 | 1 | 1 | 1.737863 | 3.041734 | 291.5189 | 1 |
| 5 | 1 | 0.999449 | 0.999452 | 0.973035 | 1 | 1 | 1.562020 | 2.193473 | 308.7684 | 1 |
| 6 | 1 | 0.999612 | 0.999241 | 0.948604 | 1 | 1 | 1.366456 | 4.241919 | 185.1681 | 1 |
| 7 | 1 | 0.999579 | 0.987093 | 0.905298 | 1 | 1 | 7.815308 | 71.24070 | 443.9721 | 1 |
| 8 | 1 | 1.001390 | 1.000260 | 0.891561 | 3 | 1 | 2.999554 | 10.39073 | 425.6822 | 1 |
| 9 | 1 | 1.000160 | 0.998282 | 0.926443 | 2 | 1 | 2.654707 | 24.96753 | 357.8863 | 1 |
| 10 | 1 | 0.999629 | 0.997906 | 0.931753 | 1 | 1 | 3.944833 | 16.44068 | 326.5467 | 1 |
| 11 | 1 | 0.999984 | 0.937843 | 0.898725 | 1 | 1 | 1.616659 | 197.0719 | 318.9118 | 1 |
| 12 | 1 | 0.947369 | 0.867209 | 0.839919 | 1 | 1 | 79.98627 | 118.8993 | 242.5110 | 1 |
| 13 | 1 | 0.984864 | 0.922510 | 0.853131 | 1 | 1 | 27.18143 | 102.1317 | 192.3209 | 1 |
| 14 | 1 | 0.994618 | 0.899893 | 0.875854 | 1 | 1 | 14.12508 | 173.9866 | 210.6253 | 1 |
| 15 | 1 | 0.951994 | 0.909050 | 0.884920 | 1 | 1 | 1.244983 | 1.855764 | 53.11870 | 1 |
| 平均 | 1 | 0.991950 | 0.967950 | 0.924090 | 1 | 1 | 2.583740 | 4.182920 | 116.5188 | 1 |
| [1] | Geurtsen M, Didden J B H C, Adan J, et al. Production, maintenance and resource scheduling: A review[J]. European Journal of Operational Research, 2023, 305(2): 501-529. |
| [2] | Serrano-Ruiz J C, Mula J, Poler R. Smart manufacturing scheduling: A literature review[J]. Journal of Manufacturing Systems, 2021, 61: 265-287. |
| [3] | 刘虎沉, 王鹤鸣, 施华. 智能质量管理: 理论模型、关键技术与研究展望[J]. 中国管理科学, 2024, 32(3): 287-298. |
| Liu H C, Wang H M, Shi H. Intelligent quality management: Theoretical framework, key technologies, and research prospect[J]. Chinese Journal of Management Science, 2024, 32(3): 287-298. | |
| [4] | Lu B, Luo Y. A dynamic condition-based maintenance policy for heterogeneous-wearing tools with considering product quality deterioration[J]. International Journal of Production Research, 2024, 62(19): 7096-7113. |
| [5] | Yang W, Chen L, Dauzère-Pèrés S. A dynamic optimisation approach for a single machine scheduling problem with machine conditions and maintenance decisions[J]. International Journal of Production Research, 2022, 60(10): 3047-3062. |
| [6] | Yin J, Ye Z, Cui L. Reliability and optimal replacement policy of a multistate system under Markov renewal shock model[J]. IEEE Transactions on Reliability, 2025, 74(1): 2214-2225. |
| [7] | Yao X, Xie X, Fu M C, et al. Optimal joint preventive maintenance and production policies[J]. Naval Research Logistics (NRL), 2005, 52(7): 668-681. |
| [8] | Huang J, Down D G, Lewis M E, et al. Dynamically scheduling and maintaining a flexible server[J]. Naval Research Logistics (NRL), 2022, 69(2): 223-240. |
| [9] | Wu C H, Yao Y C, Dauzère-Pérès S, et al. Dynamic dispatching and preventive maintenance for parallel machines with dispatching-dependent deterioration[J]. Computers & Operations Research, 2020, 113: 104779. |
| [10] | 安友军, 陈晓慧, 胡家文, 等. 基于多阶段-多阈值的设备退化建模与维护决策优化[J]. 系统工程理论与实践, 2024, 44(8): 2700-2717. |
| An Y J, Chen X H, Hu J W, et al. Equipment degradation modeling and maintenance decision optimization based on multi-phase and multi-threshold[J]. Systems Engineering-Theory & Practice, 2024, 44(8): 2700-2717. | |
| [11] | 金爽, 周晶, 胡骞. 考虑灵活弧中断的网络维护调度问题及其算法研究[J]. 中国管理科学, 2025, 33(8): 250-259. |
| Jin S, Zhou J, Hu Q. Research on the network maintenance scheduling problem with flexible arc outages and its algorithm[J]. Chinese Journal of Management Science, 2025, 33(8): 250-259. | |
| [12] | Forootani A, Iervolino R, Tipaldi M, et al. Off-policy temporal difference learning for perturbed Markov decision processes[J]. IEEE Control Systems Letters, 2024, 8: 3488-3493. |
| [13] | 李阳, 范厚明, 张晓楠. 动态需求下车辆路径问题的周期性优化模型及求解[J]. 中国管理科学, 2022, 30(8): 254-266. |
| Li Y, Fan H M, Zhang X N. A periodic optimization model and solution for capacitated vehicle routing problem with dynamic requests[J]. Chinese Journal of Management Science, 2022, 30(8): 254-266. | |
| [14] | Saffar F, Moghaddam S K, Huang S. Dynamic layout design for scalable reconfigurable manufacturing systems[J]. International Journal of Production Research, 2025, 63(17): 6530-6552. |
| [15] | 刘乐. 可外包条件下最大时间偏离受限的单机重调度[J]. 系统工程学报, 2019, 34(1): 12-28. |
| Liu L. Single-machine rescheduling with outsourcing allowed and a limit to maximum time deviation[J]. Journal of Systems Engineering, 2019, 34(1): 12-28. | |
| [16] | Park J, Han J, Lee K. Integer optimization models and algorithms for the multi-period non-shareable resource allocation problem[J]. European Journal of Operational Research, 2024, 317(1): 43-59. |
| [17] | 镇璐, 高佳静, 谭哲一. 多卡车与多无人机协同配送路径优化问题研究[J]. 管理科学学报, 2024, 27(7): 1-18. |
| Zhen L, Gao J J, Tan Z Y. Routing problem of multiple trucks and drones cooperative delivery[J]. Journal of Management Sciences in China,2024, 27(7): 1-18. | |
| [18] | Hu J, Wang H, Tang H K, et al. Knowledge-enhanced reinforcement learning for multi-machine integrated production and maintenance scheduling[J]. Computers & Industrial Engineering, 2023, 185: 109631. |
| [19] | Sabri A, Allaoui H, Souissi O. Reinforcement learning and stochastic dynamic programming for jointly scheduling jobs and preventive maintenance on a single machine to minimise earliness-tardiness[J]. International Journal of Production Research, 2024, 62(3): 705-719. |
| [20] | Satic U, Jacko P, Kirkbride C. A simulation-based approximate dynamic programming approach to dynamic and stochastic resource-constrained multi-project scheduling problem[J]. European Journal of Operational Research, 2024, 315(2): 454-469. |
| [21] | 初梓豪, 徐哲, 刘东宁. 带有活动重叠的随机调度问题建模与算法研究[J]. 中国管理科学, 2024, 32(7): 84-94. |
| Chu Z H, Xu Z, Liu D N. Model and algorithm on stochastic scheduling problem with activity overlapping[J]. Chinese Journal of Management Science, 2024, 32(7): 84-94. | |
| [22] | An Y, Chen X, Hu J, et al. Integrated optimization of condition-based preventive maintenance and production rescheduling with multi-phase processing speed selection and old machine scrap[J]. Reliability Engineering & System Safety, 2023, 238: 109399. |
| [23] | Xia L, Zhang Z G, Li Q L. Ac/μ-rule for job assignment in heterogeneous group-server queues[J]. Production and Operations Management, 2022, 31(3): 1191-1215. |
| [24] | Kopp D, Hassoun M, Kalir A, et al. SMT2020—a semiconductor manufacturing testbed[J]. IEEE Transactions on Semiconductor Manufacturing, 2020, 33(4): 522-531. |
| [1] | Xiangtianrui Kong, Yanhong Long, Kaize Yu, Zelong Yi, Pengyu Yan. Optimal Lot-sizing for Digital Perishable Auction Platform with Demand Learning [J]. Chinese Journal of Management Science, 2025, 33(6): 222-232. |
| [2] | Wenjie Dong, Na Zhang, Chenchen Hua, Zhigeng Fang. Optimal Imperfect Maintenance Strategies for Repairable Systems Considering Repair Fatigue [J]. Chinese Journal of Management Science, 2025, 33(6): 151-159. |
| [3] | Wei-wei CUI,Xin-bo LIU. Integrating Production Planning and Energy Controlling for the Manufacturing Plant with Alternative Power Supplier [J]. Chinese Journal of Management Science, 2023, 31(8): 173-183. |
| [4] | XIE Fang, LI Hong-bo, BAI Qing-guo. Stochastic Multi-mode Resource-constrained Project Scheduling [J]. Chinese Journal of Management Science, 2022, 30(10): 155-164. |
| [5] | LIU Qin-ming, LIU Wen-yi, YE Chun-ming. Research on Joint Optimization of Equipment Maintenance and Buffer Stock by Considering Insufficient Buffer Stock [J]. Chinese Journal of Management Science, 2022, 30(1): 143-153. |
| [6] | LU Zhen, XU Jian, YANG Yun-feng. The Decision of Economic Production Quantity with Quality-Contingent Demand and Perfect Preventative Maintenance [J]. Chinese Journal of Management Science, 2020, 28(5): 71-78. |
| [7] | LIU Xue-juan, ZHAO Fei, MA Xiao-yang. Joint Optimal Multi-product Production and Non-cyclical Preventive Maintenance Planning Model [J]. Chinese Journal of Management Science, 2017, 25(11): 189-196. |
| [8] | ZHENG Rui, LV Wen-yuan. Modelling of Simultaneous Decision Making of Production Control and Maintenance Schedule in the Context of Failure Downtime [J]. Chinese Journal of Management Science, 2016, 24(8): 116-122. |
| [9] | LI Zhi, TAN De-qing. Research on Optimal Production-Inventory Control Policy for Erlang Assemble-To-Order System [J]. Chinese Journal of Management Science, 2016, 24(6): 61-69. |
| [10] | LIU Shu-ren, TANG Pei, HUANG Ying-na. Inventory Management with Selling by Internet Auctions and Purchasing by Reverse Auctions [J]. Chinese Journal of Management Science, 2015, 23(11): 62-69. |
| [11] | YANG Qin, ZHOU Guo-hua, YU Wei. Study on the Dynamic Scheduling Problem of 4S Auto Dealership Maintenance Service System Based on Theory of Constraint [J]. Chinese Journal of Management Science, 2011, 19(3): 88-93. |
| [12] | ZHENG Rui, LV Wen-yuan. Modelling of Preventive Maintenance Based on the Delay Time Theory and Case Study [J]. Chinese Journal of Management Science, 2010, 18(2): 48-54. |
| [13] | YAO Jian-ming, ZHANG Xiu-min, LIU Li-wen. Analysis on Pull Supply Chain Dynamic Scheduling Based on Improved Ant Algorithm [J]. Chinese Journal of Management Science, 2006, (3): 20-26. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||
|
||