主管:中国科学院
主办:中国优选法统筹法与经济数学研究会
   中国科学院科技战略咨询研究院

中国管理科学 ›› 2025, Vol. 33 ›› Issue (10): 67-75.doi: 10.16381/j.cnki.issn1003-207x.2023.0245

• • 上一篇    下一篇

基于运行过程失效预防的重大装备并联型关键系统定期维修模型

张秦1, 徐鹏2(), 方志耕3, 刘思峰3   

  1. 1.扬州大学商学院,江苏 扬州 225127
    2.南京师范大学商学院,江苏 南京 210023
    3.南京航空航天大学经济与管理学院,江苏 南京 211106
  • 收稿日期:2023-02-15 修回日期:2023-06-12 出版日期:2025-10-25 发布日期:2025-10-24
  • 通讯作者: 徐鹏 E-mail:pengxu@smail.nju.edu.cn
  • 基金资助:
    国家自然科学基金项目(72071111);国家自然科学基金项目(72171120);江苏省自然科学基金项目(BK20230553)

Periodic Maintenance Model of Parallel Critical System for Major Equipment to Prevent the Failure During the Operation Process

Qin Zhang1, Peng Xu2(), Zhigeng Fang3, Sifeng Liu3   

  1. 1.Business School,Yangzhou University,Yangzhou 225127,China
    2.School of Business,Nanjing Normal University,Nanjing 210023,China
    3.College of Economics and Management,Nanjing University of Aeronautics and Astronautics,Nanjing 211106,China
  • Received:2023-02-15 Revised:2023-06-12 Online:2025-10-25 Published:2025-10-24
  • Contact: Peng Xu E-mail:pengxu@smail.nju.edu.cn

摘要:

为有效预防并联型关键系统在重大装备运行过程中发生失效,本文在现有模型的基础上,充分考虑装备的运行时段,提出一种基于运行过程失效预防的重大装备并联型关键系统定期维修模型。首先,建立基于运行时段的重大装备并联型关键系统定期维修模型。然后,为权衡经济性与维修性,按照“先更换”以及“后更换”两种优化原则,构建基于计划更换原则的重大装备并联型关键系统定期维修优化模型,并通过数值算例验证最优解推导的正确性以及本文模型的有效性。最后,将本文模型运用于某大型船舶电气系统的定期维修问题,旨在呈现最优策略的分析过程以及为决策者在研究类似问题时提供科学依据。

关键词: 运行过程, 重大装备, 并联型关键系统, 定期维修模型, 计划更换原则

Abstract:

Most of the preventive maintenance researches just focus on the whole life the systems but ignore the operation process. For some major equipment, they can not be always in working condition and might be shut down in most time. Therefore, the high reliability in the whole life dose not mean that the systems have high reliability during the operation process. Nowadays, some scholas have integrated the operation duration into the preventive maintenance models and proved that if the operation duration is considered, the maintenance policies can be more effective to guarantee high reliability for the systems. However, the related works just considered the one-unit system. Then, in order to prevent failure of parallel critical system when the major equipment is operating, the operation duration is considered into the present model, and a periodic maintenance model of parallel critical system for major equipment is proposed to prevent the failure during the operation process. Firstly, a periodic maintenance model of parallel critical system for major equipment with operation duration is formulated. Then, in order to balance the trade-off between the cost and maintainability, the periodic maintenance optimized models of parallel critical system for major equipment with scheduled replacement principle are formulated, according to replacement first and replacement last. Via the numerical examples, the optimum numbers of the units would be underestimated if the operation duration is not considered. In reliability theory, the smaller numbers of the units of the parallel systems would lead to the lower reliability. It verifies that the proposed models can be more effective to guarantee the high reliability. Finally, the suggested models are illustrated in maintaining the electrical system of a large ship based on the assumed data, which presents the analysis process of optimal polices and provide the decision-makers with the suggestions when they study the similar problems.

Key words: operation duration, major equipment, parallel critical system, periodic maintenance model, scheduled replacement principle