| 1 | 
																						 
											 王滔, 颜波, 李鸿媛. 网络间接渠道下替代产品竞争的决策分析[J]. 中国管理科学, 2017, 25(4): 42-51.
											 											 | 
										
																													
																						 | 
																						 
											 Wang Tao, Yan Bo, Li Hongyuan. Decision analysis of substitute product’s competition under the indirect internet channel[J]. Chinese Journal of Management Science, 2017, 25(4): 42-51.
											 											 | 
										
																													
																						| 2 | 
																						 
											 李友东, 夏良杰, 王锋正. 基于产品替代的低碳供应链博弈与协调模型[J]. 中国管理科学, 2019, 27(10): 66-76.
											 											 | 
										
																													
																						 | 
																						 
											 Li Youdong, Xia Liangjie, Wang Fengzheng. Game and coordination model for low-carbon supply chain with product substitution[J]. Chinese Journal of Management Science, 2019, 27(10): 66-76.
											 											 | 
										
																													
																						| 3 | 
																						 
											 张柯慧, 杨华龙, 辛禹辰, 等. 考虑顾客缺失反应的多产品两阶段JIT联合订货[J]. 中国管理科学, 2020, 28(10): 118-130.
											 											 | 
										
																													
																						 | 
																						 
											 Zhang Kehui, Yang Hualong, Xin Yuchen, et al. Multi-item/two-stage JIT joint replenishment considering customer response to stock-out[J]. Chinese Journal of Management Science, 2020, 28(10): 118-130.
											 											 | 
										
																													
																						| 4 | 
																						 
											 Balakrishnan A, Geunes J. Requirements planning with substitutions: exploiting Bill-of-Materials flexibility in production planning[J]. Manufacturing and Service Operations Management, 2000, 2(2): 166-185.
											 											 | 
										
																													
																						| 5 | 
																						 
											 Hsu V N, Li C L, Xiao Wenqiang. Dynamic lot size problem with one-way product substitution[J]. IIE Transactions, 2005, 37(3): 201-215.
											 											 | 
										
																													
																						| 6 | 
																						 
											 Yaman H. Polyhedral analysis for the two-item uncapacitated lot-sizing problem with one-way substitution[J]. Discrete Applied Mathematics, 2009, 157(14): 3133-3151.
											 											 | 
										
																													
																						| 7 | 
																						 
											 Yaman H. Erratum to: polyhedral analysis for the two-item uncapacitated lot-sizing problem with one-way substitution[J]. Discrete Applied Mathematics, 2011, 159(10): 1058-1058.
											 											 | 
										
																													
																						| 8 | 
																						 
											 Lang J C, Domschke W. Efficient reformulations for dynamic lot-sizing problems with product substitution[J]. OR Spectrum, 2010, 32(2): 263-291.
											 											 | 
										
																													
																						| 9 | 
																						 
											 Li Yongjian, Chen Jian, Cai Xiaoqiang. Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution[J]. OR Spectrum, 2006, 28(1): 101-125.
											 											 | 
										
																													
																						| 10 | 
																						 
											 Pineyro P, Viera O. The economic lot-sizing problem with remanufacturing and one-way substitution[J]. International Journal of Production Economics, 2010, 124(2): 482-488.
											 											 | 
										
																													
																						| 11 | 
																						 
											 Pineyro P, Viera O. Note on “The economic lot-sizing problem with remanufacturing and one-way substitution”[J]. International Journal of Production Economics, 2014, 156: 167-168.
											 											 | 
										
																													
																						| 12 | 
																						 
											 Geunes J. Solving large-scale requirements planning problems with component substitution options[J]. Computers & Industrial Engineering, 2003,44(3): 475-491.
											 											 | 
										
																													
																						| 13 | 
																						 
											 Li Yongjian, Chen Jian, Cai Xiaoqiang. Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing[J]. International Journal of Production Economics, 2007,105(2): 301-307.
											 											 | 
										
																													
																						| 14 | 
																						 
											 胡海菊, 李勇建. 考虑再制造和产品需求可替代的短生命周期产品动态批量生产计划问题[J]. 系统工程理论与实践, 2007, 27(12): 76-84.
											 											 | 
										
																													
																						 | 
																						 
											 Hu Haiju, Li Yongjian. Dynamic production planning problem for short-life-cycle products with product remanufacturing and demand substitution[J]. Systems Engineering-Theory & Practice, 2007,12(12): 76-84.
											 											 | 
										
																													
																						| 15 | 
																						 
											 Blocher J D, Chand S, Sengupta K. The changeover scheduling problem with time and cost considerations: analytical results and a forward algorithm[J]. Operations Research, 1999, 47(4): 559-569.
											 											 | 
										
																													
																						| 16 | 
																						 
											 Karmarkar U S, Schrage L. The deterministic dynamic product cycling problem[J]. Operations Research, 1985, 33(2): 326-345.
											 											 | 
										
																													
																						| 17 | 
																						 
											 Gascon A, Leachman R C. A dynamic programming solution to the dynamic, multi-item, single-machine scheduling problem[J]. Operations Research, 1988, 36(1): 50-56.
											 											 | 
										
																													
																						| 18 | 
																						 
											 Magnanti T L, Vachani R. A strong cutting plane algorithm for production scheduling with changeover costs[J]. Operations Research, 1990, 38(3): 456-473.
											 											 | 
										
																													
																						| 19 | 
																						 
											 Fleischmann B. The discrete lot-sizing and scheduling problem[J]. European Journal of Operational Research, 1990, 38(3): 337-348.
											 											 | 
										
																													
																						| 20 | 
																						 
											 Salomou M, Kroon L G, Kuik R, et al. Some extensions of the discrete lot sizing and scheduling problem[J].Management Science, 1991, 37(7):801-812-486.
											 											 | 
										
																													
																						| 21 | 
																						 
											 Cattrysse D, Salomon M, Kuik R, et al. A dual ascent and column generation heuristic for the discrete lot sizing and scheduling problem with setup times[J]. Management Science, 1993, 39(4): 477-486.
											 											 | 
										
																													
																						| 22 | 
																						 
											 Fleischmann B. The discrete lot-sizing and scheduling problem with sequence-dependent setup costs[J]. European Journal of Operational Research, 1994, 75(2): 395-404.
											 											 | 
										
																													
																						| 23 | 
																						 
											 Gicquel C, Lisser A, Minoux M. An evaluation semidefinite programming based approaches for discrete lot-sizing problems[J]. European Journal of Operational Research, 2014, 237: 498-507.
											 											 | 
										
																													
																						| 24 | 
																						 
											 Gicquel C, Minoux M. Multi-product valid inequalities for the discrete lot-sizing and scheduling problem[J]. Computers & Operations Research, 2015, 54: 12-20.
											 											 | 
										
																													
																						| 25 | 
																						 
											 Ceschia S, Gaspero L D, Schaerf A. Solving discrete lot-sizing and scheduling by simulated annealing and mixed integer programming[J]. Computers & Industrial Engineering, 2017, 114: 235-243.
											 											 | 
										
																													
																						| 26 | 
																						 
											 Lang J C, Shen Zuojun. Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions[J]. European Journal of Operational Research, 2011, 214(3): 595-605.
											 											 | 
										
																													
																						| 27 | 
																						 
											 Dawande M, Gavirneni S, Mu Yinping, et al. On the interaction between demand substitution and production changeovers[J]. Manufacturing and Service Operations Management, 2010, 12(4): 682-691.
											 											 | 
										
																													
																						| 28 | 
																						 
											 Zeppetella L, Gebennini E, Grassi A, et al. Optimal production scheduling with customer-driven demand substitution[J]. International Journal of Production Research, 2017, 55(6): 1692-1706.
											 											 | 
										
																													
																						| 29 | 
																						 
											 Glassey C R. Minimum change-over scheduling of several products on one machine[J]. Operations Research, 1968, 16(2): 342-352.
											 											 | 
										
																													
																						| 30 | 
																						 
											 Mitsumor S. Optimum production scheduling of multicommodity in flow line[J]. IEEE transactions on systems, man, and cybernetics, 1972, 2(4): 486-493.
											 											 | 
										
																													
																						| 31 | 
																						 
											 Driscoll W C, Emmons H. Scheduling production on one machine with changeover costs[J]. AIIE Transactions, 1977, 9(4): 388-395.
											 											 | 
										
																													
																						| 32 | 
																						 
											 Bruno J, Downey P. Complexity of task sequencing with deadlines, setup times, and changeover costs[J]. SIAM Journal on computing, 1978, 7(4), 393-404.
											 											 | 
										
																													
																						| 33 | 
																						 
											 Mitsumor S. Optimum scheduling for load balance of two-machine production lines[J]. IEEE transactions on systems, man, and cybernetics, 1981, 11(6): 400-409.
											 											 | 
										
																													
																						| 34 | 
																						 
											 Hu T C, Kuo Y S, Ruskey F. Some optimum algorithms for scheduling problems with changeover costs[J]. Operations Research, 1987, 35(1): 94-99.
											 											 | 
										
																													
																						| 35 | 
																						 
											 Blocher J D, Chand S. An improved lower bound for the changeover scheduling problem[J]. IIE Transactions, 1996, 28(11): 901-909.
											 											 | 
										
																													
																						| 36 | 
																						 
											 Blocher J D, Chand S. A forward branch-and search algorithm and forecast horizon results for the changeover scheduling problem[J]. European Journal of Operational Research, 1996, 91(3): 456-470.
											 											 | 
										
																													
																						| 37 | 
																						 
											 Zhou Feng, Blocher J D, Hu Xinxin, et al. Optimal single machine scheduling of products with components and changeover cost [J]. European Journal of Operational Research, 2014, 233: 75-83.
											 											 | 
										
																													
																						| 38 | 
																						 
											 慕银平. 需求替代的两产品动态批量最优预测时阈研究[J]. 管理科学学报, 2011, 14(3): 10-23.
											 											 | 
										
																													
																						 | 
																						 
											 Mu Yinping. Forecast horizon of dynamic lot-size for two products under demand and substitution[J]. Journal of Management Science in China, 2011,14(3): 10-23.
											 											 | 
										
																													
																						| 39 | 
																						 
											 Lundin R A, Morton T E. Planning horizons for the dynamic lot size model: Zabel vs. protective procedures and computational results[J]. Operations Research, 1975, 23(4): 711-734.
											 											 | 
										
																													
																						| 40 | 
																						 
											 靖富营. 需求替代和生产转换下动态批量决策与预测时阈研究[D]. 成都: 电子科技大学, 2019.
											 											 | 
										
																													
																						 | 
																						 
											 Jing Fuying. Studies on the decision of dynamic lot sizing and forecast horizon under demand substitution and production changeovers[D]. Chengdu: University of Electronic Science and Technology of China, 2019.
											 											 | 
										
																													
																						| 41 | 
																						 
											 Mu Yinping, Jing Fuying. Forecast Horizons under demand substitution and production changeovers: a generalized model[R]. Working Paper, University of Electronic Science and Technology of China, 2021.
											 											 |