Research on the Health Evaluation of The Megaproject Team's Immune System Based on The Coordinated Development Degree

Expand
  • School of Management, Harbin Institute of Technology, Harbin 150001, China

Received date: 2017-02-10

  Revised date: 2017-07-11

  Online published: 2018-10-22

Abstract

The healthy and sustainable operation of the megaproject team's immune system is important for the megaproject team to cope with the complex engineering environment. It can be divided into the innate immunity and adaptive immunity. The coordinated development of the two sub-systems is closely related to the healthy and sustainable operation of the megaproject team's immune system. In order to evaluate the health and coordinated development of the megaproject team's immune system, an evaluation model based on the coordinated development degree is proposed. Firstly, the health evaluation index system which can reflect the characteristics of the megaproject team's immune system is constructed through the literature inquiry and depth interview. Secondly, the improved DEMATEL is used to determine the weight of the index and use the multi-level fuzzy comprehensive evaluation method is used to quantify the relevant index, And then the health index and coordination degree of the immune system are obtained. Thirdly, the criteria of the health degree and coordinated development is established. In addition, the strategy of dynamic tracking evaluation of the immune system health is put forward in the life cycle of the megaproject team. Finally, the model is used to the immune system of a multinational gas pipeline project team. The results show that the coordinated development model can not only reflect the health of the megaproject team's immune system, but also measure the coordinated development of the innate immunity and adaptive immunity sub-system. At the same time, the tracking evaluation of the immune system health also achieved good results. This study has a certain inspiration for the megaproject team's immune system and highlights the future research direction.

Cite this article

XUE Xiao-long, NIU Xiang-fei . Research on the Health Evaluation of The Megaproject Team's Immune System Based on The Coordinated Development Degree[J]. Chinese Journal of Management Science, 2018 , 26(8) : 186 -196 . DOI: 10.16381/j.cnki.issn1003-207x.2018.08.020

References

[1] 时茜茜, 朱建波, 盛昭瀚. 重大工程供应链协同合作利益分配研究[J]. 中国管理科学, 2017,25(5):42-51.

[2] 吕萍,王以华.组织免疫行为和机制研究[J].管理学报,2009,6(5):607-614.

[3] Krajangsri T, Pongpeng J. Effect of sustainable infrastructure assessments on construction project success using structural equation modeling[J]. Journal of Management in Engineering, 2016, 33(3):04016056.

[4] He Qinghua, Luo Lan, Hu Yi, et al. Measuring the complexity of mega construction projects in China-A fuzzy analytic network process analysis[J]. International Journal of Project Management, 2015, 33(3):549-563.

[5] Rad E K M, Sun Ming, Bosché F. Complexity for megaprojects in the energy Sector[J]. Journal of Management in Engineering, 2017, 33(4):1-44.

[6] Hu Yi, Chan A P C, Le Y, et al. Developing a program organization performance index for delivering construction megaprojects in china:fuzzy synthetic evaluation analysis[J]. Journal of Management in Engineering, 2016, 32(4):05016007.

[7] 文理,程先东,闫贻志,等. 基于中医取象比类思维的企业模糊诊断研究[J]. 管理学报, 2010, 7(10):1442-1447.

[8] 董琰. 企业诊断的指标评价——基于中医理论的研究[J]. 经济问题, 2014,(3):89-92.

[9] 徐一旻, 张剑光. 基于D-S证据理论的企业免疫力评价[J]. 科技进步与对策, 2012, 29(17):138-142.

[10] 孙见荆. 科技, 经济和社会协调发展模型研究[J]. 中国管理科学,1996,(2):13-18.

[11] 宋建波, 武春友. 城市化与生态环境协调发展评价研究——以长江三角洲城市群为例[J]. 中国软科学, 2010,(2):78-87.

[12] 汤铃, 李建平, 余乐安等. 基于距离协调度模型的系统协调发展定量评价方法[J]. 系统工程理论与实践, 2010, 30(4):594-602.

[13] 史丽萍, 贾亚男, 刘强. 团队目标导向影响因素的探索性研究:基于扎根理论和概念格加权群组DEMATEL方法[J]. 运筹与管理, 2016, 25(2):104-112.

[14] 程国平, 张剑光, 徐新. 企业免疫系统的应答机制研究[J]. 中国地质大学学报(社会科学版), 2011, 11(2):120-124.

[15] 杨兴龙, 孙芳城, 陈丽蓉. 内部控制与免疫系统:基于功能分析法的思考[J]. 会计研究, 2013, (3):65-71.

[16] 许晖, 纪春礼, 李季,等. 基于组织免疫视角的科技型中小企业风险应对机理研究[J]. 管理世界, 2011,(2):142-154.

[17] Rapport D J, Costanza R, McMichael A J. Assessing ecosystem health[J]. Trends in Ecology & Evolution, 1998, 13(10):397-402.

[18] Mok K Y, Shen G Q, Yang Jing. Stakeholder management studies in mega construction projects:A review and future directions[J]. International Journal of Project Management, 2015, 33(2):446-457.

[19] 索玮岚, 陈锐. 考虑复杂关联情境的城市典型生命线运行风险因素识别方法研究[J]. 中国管理科学, 2014, 22(8):130-140.

[20] 刘樑, 沈焱,曹学艳,等. 基于关键信息的非常规突发事件预警模型研究[J]. 管理评论, 2012, 24(10):166-176.

[21] Long Yan, Xu Guobin, Ma Chao, et al. Emergency control system based on the analytical hierarchy process and coordinated development degree model for sudden water pollution accidents in the Middle Route of the South-to-North Water Transfer Project in China[J]. Environmental Science and Pollution Research International, 2016, 23(12):12332-12342.

[22] 曾晖,成虎.重大工程项目全流程管理体系的构建[J].管理世界, 2014,(3):184-185.
Outlines

/