Coordination of Order Timing in Supply Chain: A Risk Aversion Perspective

Expand
  • Jingdezhen Ceramic Institute, Jingdezhen 333403, China

Received date: 2014-12-13

  Revised date: 2015-09-30

  Online published: 2016-08-24

Abstract

In terms of order timing of short life cycle products, a retailer usually prefers to delayed order.But a manufacturer generally encourages the retailer to order in advance.So there is a conflict in the order timing issue between the manufacturer and the retailer.Coordinating the two sides can improve supply chain's overall performance.The existing papers about order timing of supply chain usually follow the risk-neutral hypothesis. And there are very few papers that conduct research in the case where the member of supply chain is risk-averse. Based on the newsboy model, in a two-echelon supply chain which is comprised of a risk-averse manufacturer and a risk-neutral retailer, the influence of the manufacturer's risk aversion on the order timing of the supply chain is discussed. It is found that in most case the supply chain may run in a mode which is not preferred by the manufacturer. Then a Buyback contract is designed to provide Pareto improvements. And the situation under which the Buyback contract can work is analyzed. Numerical analysis shows that, the setting of the wholesale price and the buyback price should consider both sides of the interests between the retailer and the manufacturer. In this way, the conditions of Pareto improvement could be meet. In addition, the smaller manufacturer's target profit is, the more easily Buyback contract could provide Pareto improvement. When the target profit gets larger to a certain degree, Buyback contract is no longer valid.The research gets some innovative achievements as follows: under the mode of flexible order, comparing with the risk-neutral situation, the optimal manufacturer's production is not independent of retailer's pre-ordering quantity, but is creasing in it; the retailer's pre-ordering quantity is larger than that of the general case owing to manufacturer's risk aversion. The research results have certain value to enrich literature of supply chain order timing.

Cite this article

XIONG Heng-qing, HUANG Yong, WAN Jie . Coordination of Order Timing in Supply Chain: A Risk Aversion Perspective[J]. Chinese Journal of Management Science, 2016 , 24(8) : 88 -97 . DOI: 10.16381/j.cnki.issn1003-207x.2016.08.011

References

[1] Zhao Xiande, Xie Jinxing, Wei J C. The value of early order commitment in a two-level supply chain[J].European Journal of Operational Research, 2007, 180(1): 194-214.

[2] Tong Chunyang.Order postponement in a supply chain in the presence of exponential demand with gamma prior[J].Operations Research Letters, 2010,38(2):97-103.

[3] 苏菊宁,陈菊红,杨变红. 具有时变参数的短生命周期产品供应链博弈分析[J]. 系统管理学报,2009,18(4):437-442.

[4] Cachon G P.The allocation of inventory risk in a supply chain: Push, pull, and advance-purchase discount contracts[J].Management Science,2004, 50(2):222-238.

[5] Wu Jianghua. Quantity flexibility contracts under bayesian updating[J]. Computers & Operations Research, 2005, 32(5): 1267-1288.

[6] Chen Haoya, Chen Jian, Chen Youhua. A coordination mechanism for a supply chain with demand information updating[J]. International Journal of Production Economics, 2006, 103(1): 347-361.

[7] 谢金星,王淼.单供应商多零售商供应链中的最优提前订货折扣[J].系统工程理论与实践,2009,29(1):1-5.

[8] Bakal I S, Geunes J.Analysis of order timing tradeoffs in multi-retailer supply systems[J].International Journal of Production Research, 2009,47(11): 2841-2863.

[9] Bakal I S, Geunes J.Order timing strategies in a single-supplier, multi-retailer system[J].International Journal of Production Research, 2010,48(8): 2395-2412.

[10] Li Jing, Lau H, Lau A H.A two-product newsboy problem with satisfying objective and independent exponential demands[J].IIE Transactions,1991,23(1): 29-39.

[11] Lanzillotti R F.Pricing objectives in large companies[J].American Economic Review,1958,48(5):921-940.

[12] Ma Lijun, Zhao Yingxue, Xue Weili, et al.Loss-averse newsvendor model with two ordering opportunities and market information updating[J].International Journal of Production Economics, 2012, 140(2): 912-921.

[13] 熊恒庆,施和平.零售商风险厌恶下的订货时机分析[J].工业工程与管理,2011,16(4):21-27.

[14] 李丽萍,肖艳玲.风险厌恶零售商供应链收益共享契约研究[J].统计与决策,2011,(12):54-56.

[15] 刘咏梅,成尚汶, 谢虎.具有损失厌恶偏好零售商的供应链弹性数量契约[J].控制与决策,2012,27(7):975-983.

[16] 廖诺,林英昌,何龙.零售商风险态度对其订货决策影响的实验研究[J].工业工程,2012,17(3):30-35.

[17] 魏光兴,邓欣,杨程程.零售商具有库存风险厌恶偏好的供应链部分回购契约[J].重庆交通大学学报(自然科学版),2013,32(5):1082-1085.

[18] 徐志春.零售商风险厌恶情形下的契约协调[J].管理学报,2013,10(12):1855-1859.

[19] 孙浩,吴亚婷,达庆利.需求价格敏感下具有损失厌恶零售商的闭环供应链定价与协调[J].控制与决策,2014,29(10):1885-1892.

[20] 张毖.随机需求下具有风险厌恶零售商的供应链间价格竞争研究[J].物流技术,2014,33(4):316-320.

[21] 舒磊,吴锋.不可靠供应下的风险厌恶采购单阶段模型[J].系统管理学报,2015,24(4):602-609.

[22] 沈瑞,蒋敏,靳维新,等.基于CVaR 准则的折扣回购策略双层风险决策[J].数学的实践与认识,2014,44(24):77-85.

[23] 何伟,徐福缘.基于风险的供需网契约协调仿真研究[J].计算机应用研究,2014,31(2):378-383.

[24] 胡新平,邓腾腾.潜在市场需求不确定下的风险厌恶供应链决策[J].工业工程,2014,17(3):33-39.
Outlines

/