Chinese Journal of Management Science ›› 2024, Vol. 32 ›› Issue (1): 158-167.doi: 10.16381/j.cnki.issn1003-207x.2021.2459
Previous Articles Next Articles
Received:2021-11-28
Revised:2022-01-30
Online:2024-01-25
Published:2024-02-08
Contact:
Guohua Wu
E-mail:wuguohua@airchina.com
CLC Number:
Guohua Wu. Based on Hub-Spoke Network a Practice Heuristic Algorithm Applied to Airline Fleet Assignment[J]. Chinese Journal of Management Science, 2024, 32(1): 158-167.
| 1 | Abara J.Applying to integer linear programming to thefleet assignment problem[J]. Interfaces, 1989, 19(4): 20-28. |
| 2 | Rushmeier R A, Kontogiorgis S A.Advances in the optimization of airline fleet assignment[J]. Transportation Science, 1997, 31(2):159-169. |
| 3 | Berge M E, Hopperstad C A. Demand driven dispatch: a method for dynamic aircraft capacity assignment, models and algorithms[J]. Operations Research, 1993, 41(1):153-168. |
| 4 | Hane C A, Barnhart C, Johnson E L, et al. The fleet assignment problem: solving a large-scale integer program[J]. Mathematical Programming, 1995,70(1-3):211-232. |
| 5 | Bazargan M. Airline operations and scheduling[M].New York: Routledge, 2016. |
| 6 | Belobaba P, Odoni A, Barnhart C. The global airline industry[M]. Chichester: John Wiley & Sons Ltd, 2009. |
| 7 | 朱金福.航空运输管理[M].西安:西北工业大学出版社,2009:409-421. |
| Zhu J F. Air transport management[M]. Xi'an:Northwestern Polytechnic University Press,2009:409-421. | |
| 8 | Subramanian R, Scheff R P, Quillinan J D, et al. Coldstart: fleet assignment at delta air lines[J]. Interfaces, 1994,24(1):104-120. |
| 9 | 朱星辉,朱金福,巩在武.我国航空公司机型指派模型及算法研究[J].工业技术经济,2007,26(4):75-77. |
| Zhu X H, Zhu J F, Gong Z W. Research on the model and algorithm of airline type assignment in China[J]. Industrial Technology and Economy, 2007, 26(4): 75-77. | |
| 10 | Zhou L. Airline planning and scheduling: models and solution methodologies[J]. Frontiers of Engineering Management, 2020, 7(5) : 1-26. |
| 11 | Lohatepanont M, Barnhart C. Airline schedule planning:integrated models and algorithms for schedule design and fleet assignment[J]. Transportation Science, 2004,38(1): 19-32. |
| 12 | 汪瑜,孙宏.基于航班机型分配的机队规划启发式算法[J].系统工程理论与实践,2011,31(2):182-189. |
| Wang Y, Sun H. A fleet planning heuristic based on flight type assignment[J]. Systems Engineering-Theory & Practice, 2011,31(2):182-189. | |
| 13 | Barnhart C, Johnson E L, Nemhauser G L, et al. Branch-and-price: column generation for solving huge integer programs[J]. Operations research, 1998, 46(3): 316-329. |
| 14 | Hai J, Barnhart C. Robust airline schedule design in a dynamic scheduling environment[J]. Computers & Operations Research, 2013, 40(3): 831-840. |
| 15 | 贾宝惠, 张恩翼, 李耀华. 飞机排班机型指派管理优化问题研究[J].计算机仿真,2016,33(12):42-46. |
| Jia B H, Zhang E Y, Li Y H. Research on the optimization problem of aircraft scheduling type assignment management[J]. Computer Simulation, 2016, 33(12):42-46. | |
| 16 | 胡玉真,宋艳,许保光.单架飞机受干扰后飞机路径恢复多项式算法研究[J].运筹与管理, 2017, 26(8):11-18. |
| Hu Y Z, Song Y, Xu B G. Research on polynomial algorithm for aircraft path recovery after single aircraft disturbance[J]. Operations Research and Management,2017,26(8):11-18. | |
| 17 | 肖晚霞, 董兴业, 林友芳. 航班恢复问题的迭代局部搜索算法[J]. 计算机与现代化, 2019(9):1-6. |
| Xiao W X, Dong X Y, Lin Y F. An iterative local search algorithm for flight recovery problem[J]. Computers and Modernization, 2019(9):1-6. | |
| 18 | 孙宏,文军,徐杰. 基于均衡使用要求的飞机排班算法[J]. 西南交通大学学报, 2004(5):569-572. |
| Sun H, Wen J, Xu J. Aircraft schedule algorithm based on balanced usage requirements[J]. Journal of Southwestern Jiaotong University, 2004(5):569-572. | |
| 19 | Barnhart C, Hatay L, Johnson E L. Deadhead selection for the long haul crew pairing problem[J]. Operations Research, 1995, 43(3):491-499. |
| 20 | Saddoune M, Desaulniers G, Elhallaoui I, et al. Integrated airline crew pairing and crew assignment by dynamic constraint aggregation[J]. Transportation Science, 2012, 46(1):39-55. |
| 21 | Ahmed M B, Hryhoryeva M, Hvattum L M, et al. A matheuristic for the robust integrated airline fleet assignment, aircraft routing and crew pairing problem[J]. Computers & Operations Research, 2022,137:105-551. |
| 22 | 白凤, 朱金福, 高强. 基于列生成法的不正常航班调度[J]. 系统工程理论与实践, 2010, 30(11):2036-2045. |
| Bai F, Zhu J F, Gao Q. Scheduling irregular flights based on column generation method[J]. Systems Engineering-Theory & Practice, 2010,30(11):2036-2045. | |
| 23 | 唐小卫, 朱金福, 高强. 流不平衡条件下飞机恢复的优化模型与算法研究[J]. 小型微型计算机系统, 2010, 31(4):793-796. |
| Tang X W, Zhu J F, Gao Q. Optimization model and algorithm study of aircraft recovery under flow imbalance conditions[J]. Small Microcomputer Systems, 2010, 31(4):793-796. | |
| 24 | 李晓岚, 乐美龙. 多目标飞机和旅客恢复分阶段启发式算法[J]. 计算机应用研究, 2014, 31(8):2270-2274. |
| Li X L, Le M L. Multi-objective aircraft and passenger recovery phased heuristic algorithm[J]. Computer Application Research, 2014, 31(8):2270-2274. | |
| 25 | Liang Z, Xiao F, Qian X, et al. A column generation-based heuristic for aircraft recovery problem with airport capacity constraints and maintenance flexibility[J]. Transportation Research Part B, 2018, 113:70-90. |
| 26 | Xu Y F, Wandelt S, Sun X Q. Airline integrated robust scheduling with a variable neighborhood search based heuristic[J].Transportation Research Part B, 2021, 149 :181-203. |
| 27 |
Ozkır V, Ozgur M S. Two-Phase heuristic algorithm for integrated airline fleet assignment and routing problem[J].Energies,2021,DOI:10.3390/en14113327 .
doi: 10.3390/en14113327 |
| 28 | Kiarashrad M, Pasandideh S H R, Mohammadi M. A mixed-integer nonlinear optimization model for integrated flight scheduling, fleet assignment and ticket pricing in competitive market[J]. Journal of Revenue and Pricing Management, 2021,20(5):596-607. |
| 29 | Guepet J, Acuna-Agost R, Briant O, et al. Exact and heuristic approaches to the airport stand allocation problem[J].European Journal of Operational Research, 2015, 246(2) : 597-608. |
| 30 |
Cacchiani V, Salazar-Gonz´alez J-J. Heuristic approaches for flight retiming in an integrated airline scheduling problem of a regional carrier[J]. Omega, 2020, DOI:10.1016/j.omega.2019.01.006 .
doi: 10.1016/j.omega.2019.01.006 |
| 31 |
Khanmirza E, Nazarahari M, Haghbeigi M. A heuristic approach for optimal integrated airline schedule design and fleet assignment with demand recapture[J]. Applied Soft Computing Journal, 2020, DOI:10.1016/j.asoc.2020.106681 .
doi: 10.1016/j.asoc.2020.106681 |
| 32 |
Okafor E G, Ubadike O C, Anene N H, et al. Study of fleet assignment problem using a hybrid technique based on Monte Carlo simulation and genetic algorithm[J]. Nigerian Journal of Technology, 2019, DOI:10.4314/njt.v38i3.30 .
doi: 10.4314/njt.v38i3.30 |
| 33 | Wei K J, Vaze V, Jacquillat Alexandre. Airline timetable development and fleet assignment incorporating passenger choice[J]. Transportation Science, 2020, 54(1):139-163. |
| 34 | Zhang D, Yu C H, Lau H. An integrated flight scheduling and fleet assignment method based on a discrete choice model[J]. Computers & Industrial Engineering, 2016, 98:195-210. |
| 35 | Safak Ö, Cavus Ö, Aktürk M S. Multi-stage airline scheduling problem with stochastic passenger demand and non-cruise times[J]. Transportation Research Part B, 2018, 114 : 39-67. |
| 36 | Goodrich M T, Tamassia R, Goldwasser M H. Data structures and algorithms in Python[M].New Jersey: John Wiley & Sons Ltd, 2013. |
| [1] | Baofeng Tian, Jingwen Zhang, Lubo Li, Junjie Chen. Integrated Resource-constrained Project Scheduling and Material Ordering Problem with Limited Storage Space [J]. Chinese Journal of Management Science, 2025, 33(8): 144-155. |
| [2] | Yanting Wang, Weibo Zheng, Zhiqiang Ma, Zhengwen He. Robustness Threshold-based Max-NPV Project Scheduling Optimization on Different Clients’ Payment Modes [J]. Chinese Journal of Management Science, 2025, 33(4): 185-196. |
| [3] | Jie Zhang, Yanfeng Li. Location-routing Problem of Fresh Product Distribution in Epidemic Environment [J]. Chinese Journal of Management Science, 2025, 33(3): 196-208. |
| [4] | Jinlong Zhao, Zhongzhong Jiang, Mingzhong Wan, Chunzheng Zhang. Order Picking Optimization in "Parts-to-Picker" Systems Considering Delivery Due Dates [J]. Chinese Journal of Management Science, 2025, 33(3): 239-255. |
| [5] | Zhihong Huang,Weilai Huang,Fang Guo. Collaborative Optimization of Charging Network and Charging Strategy with Practical Battery Wear Model [J]. Chinese Journal of Management Science, 2024, 32(6): 68-78. |
| [6] | Feifeng Zheng, Zhixin Wang, Ming Liu. Charging Scheduling Optimization of Battery Electric Buses Considering Peak-Valley Electricity Price and Battery Damage Cost [J]. Chinese Journal of Management Science, 2024, 32(11): 125-135. |
| [7] | GAO Hong-wei, LI Lu. Real-time Pricing Based on PMSC Management and Reward-Punishment Mechanism in Smart Grid [J]. Chinese Journal of Management Science, 2022, 30(7): 88-98. |
| [8] | XU Bao-guang, CHANG Jia-xin, GAO Min-gang. Research on Routing Problems about Road Information Collection Considering Mixed Mapping Method [J]. Chinese Journal of Management Science, 2022, 30(4): 218-227. |
| [9] | GUO Fang, HUANG Zhi-hong, HUANG Wei-lai, YANG Chao. Optimal Planning of the Electric Vehicle Routing and Battery Charging Problem with Self-pickup and Door-to-door Delivery Service [J]. Chinese Journal of Management Science, 2022, 30(2): 264-275. |
| [10] | GUO Fang, YANG Jun, YANG Chao. Study on Heterogeneous Electric Vehicle Routing and Batterycharging Problem with the Consideration of Differentiated Service Cost [J]. Chinese Journal of Management Science, 2019, 27(8): 118-128. |
| [11] | ZHANG Yang, DAN Bin, GAO Hua-Li. Stochastic Scheduling of Product Service System Orders with Due Date Assignment [J]. Chinese Journal of Management Science, 2019, 27(2): 93-106. |
| [12] | YANG Jun, FENG Peng-xiang, SUN Hao, YANG Chao. Carbon Emission Reduction Cost-Sharing Model in Supply Chain Based on Improvingthe Demand for Low-Carbon Products [J]. Chinese Journal of Management Science, 2015, 23(9): 87-96. |
| [13] | XIAO Yi-yong, CHANG Wen-bing, ZHANG Ren-qian. A Research on Heuristic Production Planning with Dual Constraints of Capabilities and Resources [J]. Chinese Journal of Management Science, 2008, 20(6): 33-40. |
| [14] | LU Kui, YANG Chang-hui, Dai Dao-ming. A Heuristic Algorithm for Multi-Product Capacitated Lot Sizing with Subcontracting and Time-varying Transportation Costs [J]. Chinese Journal of Management Science, 2008, 16(1): 80-85. |
| [15] | QIAO Zhong, LI Ling-ying. A Bi-Level Programming Model for Location of Commodity Exchange Market Network Points [J]. Chinese Journal of Management Science, 2008, 16(1): 125-130. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||
|
||
