主管:中国科学院
主办:中国优选法统筹法与经济数学研究会
   中国科学院科技战略咨询研究院

中国管理科学 ›› 2025, Vol. 33 ›› Issue (5): 173-183.doi: 10.16381/j.cnki.issn1003-207x.2022.1330cstr: 32146.14/j.cnki.issn1003-207x.2022.1330

• • 上一篇    下一篇

考虑“因素-阶段”双重关联的复杂装备交付风险动态评估方法

张思琪, 朱建军()   

  1. 南京航空航天大学经济与管理学院,江苏 南京 211106
  • 收稿日期:2022-06-18 修回日期:2022-12-23 出版日期:2025-05-25 发布日期:2025-06-04
  • 通讯作者: 朱建军 E-mail:zhujianjun@nuaa.edu.cn
  • 基金资助:
    国家自然科学基金项目(72071106)

A Dynamic Assessment Method for Complex Equipment Delivery Risk Considering the Dual Correlation ofFactors - stages

Siqi Zhang, Jianjun Zhu()   

  1. College of Economics and Management,Nanjing University of Aeronautics and Astronautics,Nanjing 211106,China
  • Received:2022-06-18 Revised:2022-12-23 Online:2025-05-25 Published:2025-06-04
  • Contact: Jianjun Zhu E-mail:zhujianjun@nuaa.edu.cn

摘要:

研究复杂装备集成供应链交付风险动态评估模型。针对复杂装备交付环节特点,构建了交付风险影响因素体系;以概率语言形式表达决策者偏好,提出了考虑动态参照点和损失厌恶系数的前景理论分析模型;针对“因素-阶段”的双重关联性,构建了基于双重Choquet积分的优化模型;基于某航空制造企业的调研数据验证了方法的可行性。本研究可支持复杂装备交付风险管控方案的决策,为交付风险管控提供理论支撑。

关键词: 复杂装备交付风险, 动态评估, 因素-阶段双重关联性, 概率语言术语

Abstract:

The delivery link of the integrated supply chain of complex equipment is the key to the transformation of national defense combat power. Due to the complex and changeable delivery environment and the complex product technology, risks in the delivery process are frequent, and how to effectively identify and control risks has become a research difficulty in academia and industry. To solve this problem, the dynamic model of complex equipment delivery risk is studied under which delivery risk factors and stages (factors-stages) are related. According to the characteristics of complex equipment delivery, a criteria system affecting the delivery risk is constructed; the preference of decision-makers is expressed by using probabilistic linguistic terms, and a prospect theoretical analysis model that considers dynamic reference points and loss aversion coefficients are proposed; considering the dual correlation of factors-stages, risk measurement models based on Choquet integral are constructed. Finally, the feasibility of the method is verified based on the survey data of an aviation manufacturing enterprise. The results show that: (1) Due to poor technical stability, the delivery risk level of new complex equipment is higher than other types of risks; (2) Knowing customer needs in the early stage can help enterprises to resolve some risks in advance, helping to shorten the delivery cycle and improve customer satisfaction; (3) There is an interactive relationship between delivery risk, and enterprises need to focus on related risks when conducting risk investigation. It can support the decision-making of complex equipment delivery risk management and control schemes, continuously enhance the core competitiveness of enterprises, and provide a specific theoretical basis and practical value for enterprise delivery risk management and control.

Key words: delivery risk of complex equipment, dynamic model, dual correction of factors-stages, probabilistic linguistic terms

中图分类号: