MRPⅡ和独立有限调度的分析比较

贾佩山   

  1. 上海交通大学计算机系, 200030
  • 收稿日期:1996-11-25 出版日期:1997-06-28 发布日期:2012-03-06

The Differences Between MRP Ⅱ and Stand-alone Finite Schedulers

Jia Peishan   

  1. Dept. of Computer Seience, Shanghai Jiaotong University, 200030
  • Received:1996-11-25 Online:1997-06-28 Published:2012-03-06

摘要: MRPⅡ是当今制造业普遍采用的计算机辅助管理模式,但MRPⅡ的能力调度有一定的缺陷.本文论述了能力调度的新方法──独立有限调度,并通过图表模型详细分析这两种调度方法的异同.

关键词: 制造业资源计划, 有限能力计划, 独立有限调度, 粗能力计划, 能力需求计划, 需求流模型

Abstract: The relationship between finite schedulers which operate on output from a higher level in aconventional MRP Ⅱ system and so-called stand-alone schedulers which essentially operate directly onorders is discussed. Two graphical models-a demand flow model and a flowpipe model-are presented.The growth of the stand-alone scheduler is ascribed to the greatly increased computing power availablequite inexpensively on modern equipment.

Key words: MRPⅡ, FMS, Stand-alone finite schedulers, CRP, RCCP, Demand flow model