Based on the classical EPQ model, and considering the quality-contingent demand and periodic perfect preventive maintenance strategy, the decision model of economic production quantity is constructed with the goal of maximizing profit per unit time. In the construction of enterprise unit time profit model, the dynamic preventive maintenance cost, recovery cost, defective repair cost and product demand rate are constructed according to the actual problems of quality-contingent demand and equipment degradation. Due to the complexity of the objective function, this paper uses genetic algorithm to solve the model numerically, and verifies its rationality by comparing and analyzing EPQ decision-making without considering the quality-contingent demand.
LU Zhen
,
XU Jian
,
YANG Yun-feng
. The Decision of Economic Production Quantity with Quality-Contingent Demand and Perfect Preventative Maintenance[J]. Chinese Journal of Management Science, 2020
, 28(5)
: 71
-78
.
DOI: 10.16381/j.cnki.issn1003-207x.2020.05.007
[1] Taft E W. The most economical production lot[J]. Iron Age,1918,101(18):1410-1412.
[2] Massonnet G, Gayon J P, Rapine C. Approximation algorithms for deterministic continuous-review inventory lot-sizing problems with time-varying demand[J]. European Journal of Operational Research, 2014, 234(3):641-649.
[3] Tayal S, Singh S R, Sharma R, et al. An EPQ model for non-instantaneous deteriorating item with time dependent holding cost and exponential demand rate[J]. International Journal of Operational Research, 2015,23(2):145-162.
[4] Das A K, Roy T K. Fractional order EOQ model with linear trend of time-dependent demand[J]. International Journal of Intelligent Systems Technologies & Applications, 2015,7(3):44-53.
[5] Andriolo A, Battini D, Persona A, et al. A new bi-objective approach for including ergonomic principles into EOQ model[J]. International Journal of Production Research, 2016,54(9):1-18.
[6] Mandal B, Pal A K. Order level inventory system with ramp type demand rate for deteriorating items[J]. Journal of Interdisciplinary Mathematics, 1998,1(1):49-66.
[7] Hsu L F, Hsu J T. Economic production quantity (EPQ) models under an imperfect production process with shortages backordered[J]. International Journal of Systems Science, 2016,47(4):1-16.
[8] Taleizadeh A A, Mohammadi B. A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process[J]. International Journal of Production Economics, 2014,150(4):9-27.
[9] 谢金星,姜启源,邢文训,等. 能力受限的批量问题的数学模型与算法新进展[J]. 运筹学杂志, 1996,15(1):1-12.
[10] Ghare P M, Schrader G F. A model for exponentially decaying inventory[J]. Journal of Industrial Engineering, 1963,14:238-243.
[11] Geetha K V, Udayakumar R. Optimal Lot Sizing Policy for Non-instantaneous Deteriorating Items with Price and Advertisement Dependent Demand Under Partial Backlogging[J]. International Journal of Applied and Computational Mathematics, 2016,2(2):171-193.
[12] Li Shoude. Optimal control of the production-inventory system with deteriorating items and tradable emission permits[J]. International Journal of Systems Science, 2014,45(11):2390-2401.
[13] Wee H M, Huang Y D, Wang W T, et al. An EPQ model with partial backorders considering two backordering costs[J]. Applied Mathematics & Computation, 2014,232(3):898-907.
[14] Goyal S K, Gunasekaran A. An integrated production-inventory-marketing model for deteriorating items[J]. Computers & Industrial Engineering, 1995,28(4):755-762.
[15] Teng J T, Chang C T. Economic production quantity models for deteriorating items with price-and stock-dependent demand[J]. Computers & Operations Research, 2005,32(2):297-308.
[16] 鲁奎. 考虑运输成本和多供应商的动态经济批量问题研究[D]. 合肥:中国科学技术大学, 2007.
[17] Aghezzaf E H, Jamali M A, Ait-Kadi D. An integrated production and preventive maintenance planning model[J]. European Journal of Operational Research, 2007,181(2):679-685.
[18] Nourelfath M, Fitouhi M, Machani M. An integrated model for production and preventive maintenance planning in multi-state systems[J]. Reliability IEEE Transactions on, 2010,59(3):496-506.
[19] Fitouhi M C,Nourelfath M. Integrating noncyclical preventive maintenance scheduling and production planning for a single machine[J]. International Journal of Production Economics,2012,136(2):344-351.
[20] Hui M W, Gede A W. Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time[J].International Journal of Production Research, 2012,50(11):2940-2952.
[21] Mustapha N, Nabil N, Mohamed B D. Integrated preventive maintenance and production decisions for imperfect processes[J].Reliability Engineering and System Safety,2016,148:21-31.
[22] Mabrouka A B, Chelbi A, Radhoui M. Optimal imperfect preventive maintenance policy for equipment leased during successive periods[J].International Journal of Production Research,2016,54(17):5095-5110.
[23] Chakraborty T, Giri B C. Lot sizing in a deteriorating production system under inspections, imperfect maintenance and rework[J]. International Journal of Operational Research, 2014,14(1):29-50.
[24] Pasandideh S H R, Niaki S T A. A genetic algorithm approach to optimize a multi-products EPQ model with discrete delivery orders and constrained space[J]. Applied Mathematics and Computation, 2008,195(2):506-514.
[25] Sadeghi J, Sadeghi A, Mohammad S M. A parameter-tuned genetic algorithm for vendor managed inventory model for a case single-vendor single-retailer with multi-product and multi-constraint[J]. Journal of Optimization in Industrial Engineering, 2011,9(5):57-67.
[26] Rezaei J, Davoodi M. Multi-objective models for lot-sizing with supplier selection.[J] International Journal of Production Economics, 2011,130(1):77-86.